• Title/Summary/Keyword: Management area

Search Result 11,468, Processing Time 0.04 seconds

Cooperative Management Framework for the Transboundary Coastal Area in the Western Part of Korean Peninsula (서해연안 접경지역 현황 및 남북한 협력관리 방안)

  • Nam, Jung-Ho;Kang, Dae-Seok
    • Journal of Environmental Policy
    • /
    • v.3 no.2
    • /
    • pp.1-29
    • /
    • 2004
  • As a result of very limited access due to the military confrontation between South and North Koreas for the last five decades, ecosystems in the transboundary coastal area in the western part of Korean Peninsula have been protected from intensive developments in both Koreas. In the core of the recent two military collisions lies the fishery resources represented as blue crabs as well as the politico-military aspect. Increasing development pressures from both sides as reflected in the South Korea supporting the construction of an industrial complex in Kaesung, North Korea, is the main factor which threatens the sustainable resource base in this region. This research is aimed to develop a cooperative management system for the well-preserved transboundary coastal area between South Korea and North Korea. The Pressure-State-Response (PSR) framework of OECD was used to assess environmental conditions, socioeconomic pressures on the environment of the region, and policy responses of both Koreas to those pressures. Protection of ecosystems, peace settlement, and prosperity of the region and the entire peninsula were proposed as the management goals of the cooperative management system. The designation of the area as a Co-managed Marine Protected Area System (COMPAS) through close cooperation among South Korea, North Korea, and international entities was suggested as a way to achieve those goals. Revision of legal and institutional mechanisms, strengthening knowledge base for optimal COMPAS management, integration of the marine protected area and DMZ (demilitarized zone) ecosystem, enhancing stakeholder participation, building international partnership, and securing financial resources were presented as six management strategies.

  • PDF

A Study of the Management for the Area Traffic Using High Level Architecture (HLA를 이용한 지역 교통망 관리 방안 연구)

  • 이상헌;민용화
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.11a
    • /
    • pp.15-18
    • /
    • 2003
  • There are plenty of optimization models for the signal-system of a single intersection and area traffic. Some of those models are adopted for the real traffic signal control system. The simulators for a single crossroad have been developed, so that we could evaluate optimization models and traffic control systems. However, the simulators for the area traffic are still being developed. Therefore, there are many limitations in the analysis and evaluation for area traffic control systems. The area traffic is consist of several intersections interconnected which are very complicated and many traffic strategy are adopted for the control system. This paper features an effective area traffic control system by High Lever Architecture(HLA) which is a new developed simulation tool. In this paper, we discuss the design of HLA-based area traffic control simulation. We describe technical motivations for the HLA, the key elements of the architecture and how they are minimum and essential to the goal of reuse and interoperability.

  • PDF

Structural Urban Landscape Changes over Time Series in Gangneung-Si (강릉시 도시 경관 구조의 시계열적 변화 연구)

  • Yeum, Jung-Hun
    • Journal of Environmental Science International
    • /
    • v.30 no.10
    • /
    • pp.779-787
    • /
    • 2021
  • This study analyzes structural landscape changes over a time-series for a small and medium-sized city, Gangneung-Si, based on area and distribution patterns, and according to the type of land cover. Among the types of land cover, the area ratio of urbanized areas increased by 2.02% in the late 2010s as compared to the late 1980s, while there was a decrease of 2.69% in farmland and 0.69% in grassland areas. On analyzing the changes in land cover use by applying the Fragstats program, it was confirmed that landscape changes in urban and management areas were relatively severe according to the Landscape Shape Index, Largest Patch Index, and Aggregation Index. A pattern of concentrated expansion was also found around certain areas. In particular, from the analysis, it was established that the proportion of urbanized area had considerably increased and that the extent of farmland damage to management areas, including planned management areas, was large. Additionally, the Total Core Area generally indicated a reduction in the core areas of farmland and forest within urban and management areas. A medium-sized city showed significant changes besides large cities in terms of landscape structure. The developmental pressure on management areas, in particular, was quite high.

Basic Research on Mid-to-Long-term Management Plan of Purchased Land by Evaluating Ecological Function of Waterfront Area of Geum River (금강수계 수변구역의 생태 기능 평가를 통한 매수토지 중장기 관리 방안 기초 연구)

  • Seo, Jung-young
    • Journal of Environmental Science International
    • /
    • v.28 no.3
    • /
    • pp.371-384
    • /
    • 2019
  • The purpose of this study was to propose an efficient management plan for purchased land considering the hydrological, watershed characteristics and ecological functions of the target land and surrounding area based on the result of monitoring the water quality improvement effect obtained by purchasing the land in the watershed area in the Geum river system. For this purpose, this study investigated through literature review, and examined ways to apply them to this research by deriving implications from a comprehensive analysis of previous research cases. After that, the components of assessment were derived to evaluate the ecological function of the purchase land, and the ecological function evaluation model for each land and area was proposed. In order to select purchase and restoration priorities of the land, this study analyzed the ecological status of the purchased land in main watersheds and tributaries using Arc GIS ver 10.1. Through this, a process to select restoration priorities was developed. And this study constructed the integrated management process with proposing a mid - to long - term plan by integrating the purchased land valuation and restoration priority selection process. Based on this process, this study suggested an effective management plan for purchased land through the integrated ecological management system of lands purchased. It can be used systematically in appraisal valuation, land purchase system, restoration project, and follow-up management of land purchase.

Environmental Conditions and Resource Management in Smallholder Dairy Farms in Thailand. I. Production Systems and Management of Resources

  • Skunmun, P.;Boonsom, J.;Kaewsuwan, S.;Chantalakhana, C.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.12 no.2
    • /
    • pp.215-219
    • /
    • 1999
  • This study aims to make detail examination of smallholder dairy farming systems in the Nongpho Dairy Cooperative. Forty-three dairy farms were selected from three geographical areas i.e. irrigated area, municipality area, and factory area. Within each area some number of sample farms were selected from each of the three levels of farm and animal crowdedness (very crowded, crowded, and not crowded farms). Detail data were collected during 1996 to 1997, they were socio-economic conditions of the sample farms and farmers, dairy production systems and management of resources (animals, bam, feeds, stocking rates, herd structure, animal body conditions, milk yield and milk quality, manure and farm wastes management, and other related items). Detail information useful for the improvement of farm production efficiency were discussed. It was very clear that much improvement of smallholder dairy production can be achieved if the recommendations given by this study were implemented.

A Study on the Forest Landscape Master Plan for Riverside Forest Landscape Belt - Focusing on Sangju-si, Gyeongsangbuk-do - (하천변 산림경관벨트 산림경관기본계획 수립에 관한 연구 -경북 상주시를 중심으로-)

  • Kim, Hoon-Hui;Shin, Ji-Hoon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.6
    • /
    • pp.17-29
    • /
    • 2013
  • Recently, the importance of forest landscape as a visual resource has been increased, so it is emphasized that the necessity of forest landscape management through 'Forest landscape management master plan' and 'National Forest landscape belt'. As such, this study aims to suggest a method for forest landscape management plan considering visual landscape analysis and regional landscape resources in case of Sangju-si, Gyeongsangbuk-do. Accordingly, this study has investigated regional landscape resources and surveyed existing forest conditions of target area. In order to analyze the characteristics of visual landscape, landscape control points are selected through viewshed analysis. And, Forest landscape plan is suggested 3 areas considering comprehensive analysis of forest landscape resources survey and characteristics of visual landscape:the landscape resource management area, the landscape resource restoration area and the landscape resources exploit area.

Analysis of Data and Information Flow for Pipeline in Permafrost Area

  • Won, Seo-Kyung;Lee, Do-Yun;Lee, Junbok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.744-745
    • /
    • 2015
  • Since the G20 summit in 2011, South Korea who was dependent on foreign energy needs of 97% receives natural gas from Russia from 2015 to 30 years, but South Korea is a situation of scarce experience and skills of pipeline project in permafrost area. In this study, we kept the target for analyzing the data and information flow of the pipeline projects in permafrost area, and the ultimate goal is set to developing the hierarchy structure of design and construction data for an efficient administration of the project. In order to develop that structure, Configuration Management was introduced and through this method, it is expected to be used to build the overall information management system in O&M phase.

  • PDF

The Strategy for Restructuring the Clinical Departments at Small and Medium Size Hospitals - With Cases of the Provincial Hospitals - (중소병원의 진료과목개설전략 - 지방공사의료원을 중심으로 -)

  • Jung, Key-Sun;Jung, Soo-Kyung;Rhyu, Kyu-Soo
    • Korea Journal of Hospital Management
    • /
    • v.6 no.1
    • /
    • pp.147-163
    • /
    • 2001
  • The purpose of this study was to find out the restructuring strategy for five provincial hospitals through the business analysis and survey of the service area. Through the survey of the service area of 5 hospitals. service area was classified into three groups, such as underserved area, adequate area, and overserved area. The strategy for the restructuring the clinical departments was set up based on the result of the business analysis and characteristics of the service area. The result of the study was as follows; 1) Whether or not a provincial hospital has specialized in specific area according to the circumstances and the needs of the community was the major factor influencing on the operating result of the hospital. 2) Provincial hospitals at the underserved area has to invest according to the changes of the occupancy rate and increasing pattern of the number of patients while maintaining the status as a general hospital. 3) Provincial hospitals at the adequate area has to lower the grade from the general hospital down to the hospital first and has to upgrade the competency through the restructuring the clinical departments and investment in specific area. 4) Provincial hospitals at the overserved area has to lower the grade from the general hospital down to the hospital first and has to seek ways to change the hospital fundamentally into geriatric hospital, pneumoconiosis hospital or psychiatric hospital etc. Provincial hospitals incapable to compete with private hospitals and clinics has to lower the grade from the general hospital down to the hospital first, to specialize in specific area and to restructure some clinical departments into rental base or self-operating basis. In case such methods are judged not so good solution, provincial hospitals has to find out ways such as shut-down of several departments or operating under the attending system.

  • PDF

Dynamic Location Area Management Scheme Using the Historical Data of a Mobile User (이동통신 사용자의 이력 자료를 고려한 동적 위치영역 관리 기법)

  • Lee, J.S.;Chang, I.K.;Hong, J.W.;Lie, C.H.
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.119-126
    • /
    • 2004
  • Location management is very important issue in wireless communication system to trace mobile users' exact location. In this study, we propose a dynamic location area management scheme which determines the size of dynamic location area considering each user's characteristic. In determining the optimal location area size, we consider the measurement data as well as the historical data, which contains call arrival rate and average speed of each mobile user. In this mixture of data, the weight of historical data is derived by linear searching method which guarantees the minimal cost of location management. We also introduce the regularity index which can be calculated by using the autocorrelation of historical data itself. Statistical validation shows that the regularity index is the same as the weight of measurement data. As a result, the regularity index is utilized to incorporate the historical data into the measurement data. By applying the proposed scheme, the location management cost is shown to decrease. Numerical examples illustrate such an aspect of the proposed scheme.

  • PDF

Design of maturity model for software project management level evaluation (소프트웨어 프로젝트의 관리 수준 평가를 위한성숙도 모형 설계)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.4
    • /
    • pp.609-615
    • /
    • 2011
  • In recent public institutions and banks to improve competitiveness in the integration of information systems projects are larger in size and may be the project's ever-growing need appropriate software project management plan. However, between the effect of the project management area for systematic research was scarce. Through this study, previous research in the important area of project management is developed, and "scope, schedule, quality, human resources, risk" of each area of impact analysis and the interaction between the progress of each area, the planning, execution, completion Performance levels were analyzed separately. Affected and Performance Analysis of the results to assess the level of the project management model is presented.