Journal of the Korea Institute of Building Construction
/
v.9
no.1
/
pp.65-73
/
2009
Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.
Journal of Construction Engineering and Project Management
/
v.3
no.3
/
pp.35-41
/
2013
All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.
International conference on construction engineering and project management
/
2005.10a
/
pp.786-790
/
2005
As the scale of building construction is larger and more complex and the adaptation of new technology is increasing, the tendency of the risk serious accident cases is increasing now. Especially, the accident rate is below 10% at the building construction workers in Korea but among the total industrial accidents it exceeded by 35%. To prevent a construction accident, it is essential that not only to have a through grasp of the characteristic of safety problem but also to establish of efficient safety counter plan are required. According to the type and situation of building construction, the acquirement of necessary information is useful to prevent the hazard of work and establish the counter plan. Among the safety information it is a thing of especial importance that to estimate the hazard of work types for building construction to prepare the counter plan of safety. This study will analyze all of the1600 accidents of the building construction works from the data of KOSHA(Korea Occupational Safety &Health Agency) which were collected during 11 years(1992~2002) data relating to serious accidents of the building construction works, and suggest the counter plan according to the each work type in building construction works.
Journal of the Korea Academia-Industrial cooperation Society
/
v.18
no.11
/
pp.110-117
/
2017
In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.
Journal of Korean Society for Geospatial Information Science
/
v.12
no.4
s.31
/
pp.21-26
/
2004
Annually repeated flood damage is bringing about the rapid increasement of the loss of human lives and properly, and the enormous social cost for the restoration work is required. The annual amount of flood damage caused by the abnormal climate is reached about 1% of GDP, so more effective management of the flood control operation is needed to prevent the repetitive flood occurred same region. Also, the systematic planning and management or river improvement works are keenly required for the more effective execution of government working budget that expense to recover or to prevent the flood damage. The several organizations of government - Ministry of Construction & Transportation, Ministry of Government Administration and Home Affair, Ministry of Agriculture and Forestry, Ministry of Environment, Ministry of Science & Technology, Korea Meteorological Adminstration and so on - are promoting the flood prevention operations, but those promotion system makes it difficult to maintain the consistency of works. In this study, we try to develop the Web-GIS system prototype that will be able to effectively manage the nationwide river improvement works and to establish a framework that will be able to maintain the consistency of river improvement works. To achieve the study goals, we analysed current system of flood prevention operations, gathered related documents, had interviews with many government employees, and developed the Web-GIS system prototype.
A web based watershed and sewer management system was developed for the analysis of stormwater runoff and sewer flow, and for optimal operation of sewer works using ArcView and SWMM. SWMM and ArcView were dynamically linked together using Avenue and Visual Basic in order to construct user-friendly management system. The developed system was applied to Choonchun city to verify its utilities. All the relevant field data were analyzed on the basis of developed system, and the modeling of runoff and sewer flow was implemented using RUNOFF and TRANSPORT blocks in SWMM. This system was connected to the management system of surface and subsurface environment management system in order to develop an integrated environmental management system. Futhermore, this system will be a critical part of overall control system of sewer works including sewer line and wastewater treatment plant. As this system can provide comprehensive prediction of flow and pollution profiles and analytical tool equipped with Web-GIS, it could serve widely as a tool not only for optimal management, but also for decision support system to examine the efficiency of planning and implementation of sewer projects.
Web based integrated sewer management system was developed for the analysis of sewer flow and for the optimal operation of sewer works using ArcView and SWMM. SWMM and ArcView were dynamically linked together using Avenue in order to construct user-friendly information management system. The developed system was applied to the residential area in Choonchun city to verify its utilities. All the relevant field data were analyzed on the basis of the developed system, and the modeling of sewer flow was implemented using RUNOFF, EXTRAN, TRANSPORT in SWMM. This system is now in the process of connection to the management system of stormwater, surface and subsurface environment in order to develop an integrated environmental management system. Futhermore, this system will be a critical part of overall control system of sewer works including sewer network and wastewater treatment plant. As this system can provide comprehensive prediction of flow and pollution profiles, it could serve as a tool not only for the optimal management, but also for the decision support system to examine the efficiency of planning and implementation of sewer projects.
The purpose of this study is 1) to research how practitioners in fashion industry in South Korea perceive concepts of Technical Design/Designer, 2) to compare and analyze issues at work by occupation, 3) to research specific works in garment development process, and 4) to compare and analyze work involvement by occupation, type of a company and etc, and 5) to propose the role of Technical Designers in apparel companies in South Korea. There were two methods to conduct this study, which were in-depth interview and survey. Both methods were conducted to designers, merchandisers, pattern makers, technical designers, and production coordinators. Frequency analysis, ANOVA, Duncan test, and Factor analysis were performed to get results by using SPSS 18.0 program. The results are following. There were 50 works during garment development process from the result of in-depth interview, and 6 factors were obtained from the result of Factor analysis, which were 'Works about Sample in Sample Development Process', 'Works about Product's Pattern and Size Spec', 'Works about Development of Garment's Design', 'Works about Planning of Product Development and Management of Product in Stock', 'Works about Production Process', and 'Preparation Works for Sample Development'. In conclusion, technical designer in apparel companies in South Korea should be in charge of works about sample in sample development process and decision making of product' size spec, which is included in works about product's pattern and size spec. Also, they should complete technical package after product is developed by designers.
Journal of Korean Society for Atmospheric Environment
/
v.22
no.6
/
pp.876-887
/
2006
Recently, there have been a large number of remodeling (or renovation) works in old buildings in urban areas. Compared to new buildings, environmental risk might be more significant in such buildings where remodeling works are going on, since some parts of the building may still be in service for people. This study was carried out to investigate the impacts of remodeling works on the indoor air quality (IAQ) of a large building (a 22 stories university library). Indoor air monitoring was conducted during and after the remodeling works every two weeks for a one year period, and target compounds included BTEX, styrene, TVOC, carbonyl compounds such as formaldehyde and acetaldehyde. $CO,\;CO_2,\;PM_{10}$, and $PM_{2.5}$. Overall, the IAQ appeared to be recovered within two months after the remodeling works. However, in some places, concentrations of formaldehyde, toluene, xylene. and ethylbenzene showed higher levels even after works than those during the works. The results indicate that painting, glues and office furnitures are major sources of aromatic VOCs and formaldehyde. Therefore, in order to decrease the concentrations of toxic VOCs, the use of environmental-friendly building materials is strongly recommended during the remodeling works. In addition, IAQ control and management scheme (for example, baking the inside of the building) should be taken into consideration before reopening the buildings.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.553-558
/
2003
The information of works performed by labors can be used for analyzing project status related to schedule, cost and productivity, etc. The purpose of this research is to develop a computer-based system by the application of PDA and barcode technology in order to measue and monitor the amount of workforce resources, works done and productivity. It is anticipated that the effective use of the devepoped system would be able to effectively assist the schedule planning and management for present and prospective construction projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.