• Title/Summary/Keyword: Management Failure

Search Result 2,554, Processing Time 0.03 seconds

Development of a Reliability Index using Design, Development and Production Information (설계, 개발 및 양산 정보를 활용한 신뢰성 지수 개발)

  • Kim, Sung Kyu;Park, Jung Won;Kim, Yong Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.43 no.3
    • /
    • pp.373-382
    • /
    • 2015
  • Purpose: In this paper, we developed a reliability index (RI) to efficiently compare reliability of products based on the design, development and production information such as reliability tests, quality, product life-cycle management. RI also can be applied to reliability prediction of a novel product as well as comparison evaluation among existing products. Methods: For evaluating RI, we proposed evaluation process which is composed of five steps. Target modules are selected based on warranty data and correlation analysis. Scores of selected target modules are calculated by scoring function. Finally, weights of RI model are determined by optimization method. Results: This paper presented an empirical analysis based on failure data of mobile devices. In this case study, we demonstrated that there is a direct correlation between evaluated RI and field failure probability of each product. Conclusion: We proposed the index for comprehensive and effective assessment of product reliability level. From the procedure of this study, we expected to be applied for reliability estimation of novel products and deduction of field failure-related factors.

THE CAUSES OF BAD PROFIT IN OVERSEAS CONSTRUCTION PROJECTS

  • Seung Heon Han;Du Yon Kim;Sang Hyuk Park
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1237-1243
    • /
    • 2005
  • International construction projects are exposed to various and complicated risk factors stemming from different political, economical, social, and cultural backgrounds, which make contractors entering into international construction to experience severe losses. It implies that overseas markets do not necessarily secure the high return, which is typically expected to in the high risky attempts. Accordingly, contractors need to evaluate various risk factors faced with overseas construction projects that can possibly aggravate the profitability. This paper aims at establishing a valid groundwork for further research on developing the integrated risk management model. For this end, it analyzes the long-term trend of profitability on total of 3,487 projects performed by Korean global contractors in world-wide construction markets during the last four decades. Then, it investigates the possible factors/causes of bad profit that have affected the profitability significantly through the structured surveys of 90 real overseas projects based on the project-specific information and experiences of Korean contractors in overseas markets. Furthermore, it analyzes relative importance of these factors/causes and identifies the important features expected for the risk management of international construction projects. Finally, vital distinctions between success and failure projects and lessons learned to improve profitability are then distilled.

  • PDF

Failure Rate of Solar Monitoring System Hardware using Relex (Relex 를 이용한 태양광 모니터링 시스템 하드웨어 고장률 연구)

  • An, Hyun-sik;Park, Ji-hoon;Kim, Young-chul
    • Journal of Platform Technology
    • /
    • v.6 no.3
    • /
    • pp.47-54
    • /
    • 2018
  • Predictive analysis in the hardware industry can be performed at an appropriate point in time to prevent failure of production facilities and reduce management costs. This helps to perform more efficient and scientific maintenance through automation of failure analysis. Among them, predictive management aims to prevent the occurrence of anomalous state by identifying and improving the abnormal state based on the gathering, analysis, and scientific data management of facilities using information technology and constructing prediction model do. In this study, we made a fault tree through the Relex tool and analyzed the error code of the hardware to study the safety.

Critical Factors Affecting No-dispute Performance: A Case of Ethiopian Public Construction Projects

  • Sinesilassie, Ephrem Girma;Tabish, Syed Zafar Shahid;Jha, Kumar Neeraj
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.24-34
    • /
    • 2016
  • Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.

Modelling the Failure Rate Function in Coverage and Software Reliability Growth

  • Park, Joong-Yang;Kim, Young-Soon;Park, Jae-Heung
    • International Journal of Quality Innovation
    • /
    • v.5 no.1
    • /
    • pp.110-121
    • /
    • 2004
  • There is a new trend of incorporating software coverage metrics into software reliability modelling. This paper proposes a coverage-based software reliability growth model. Firstly, the failure rate function in coverage is analytically derived. Then it is shown that the number of detected faults follows a Nonhomogeneous Poisson distribution of which intensity function is the failure rate function in coverage. Practical applicability of the proposed models is examined by illustrative numerical examples.

Nutritional Management of Failure to Thrive (성장 장애아의 영양 보충)

  • Park, Jae Hong
    • Pediatric Gastroenterology, Hepatology & Nutrition
    • /
    • v.12 no.sup1
    • /
    • pp.41-45
    • /
    • 2009
  • Optimal nutrition in infancy and early childhood is the success behind good health, growth, and development of children. Failure to thrive may be the end point of any combination of a nutritional disorder, poor growth, and psychosocial deprivation. Hospital admission is rarely necessary and may be counterproductive. Day attendance, for investigation and observation of child-parent interaction, may be more valuable. Nutritional supplementation, together with nutritional counseling, can improve food intake and growth in children with failure to thrive.

Development of Failure Reporting Analysis and Corrective Action System

  • Hong, Yeon-Woong
    • 한국데이터정보과학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.97-112
    • /
    • 2006
  • FRACAS(Failure Reporting, Analysis and Corrective Action System) is intended to provide management visibility and control for reliability and maintainability improvement of hardware and associated software by timely and disciplined utilization of failure and maintenance data to generate and implement effective corrective actions to prevent failure recurrence and to simplify or reduce the maintenance tasks. This process applies to acquisition for the design, development, fabrication, test, and operation or military systems, equipment, and associated computer programs. This paper shows the FRACAS development process and developed FRACAS system for a defense equipment.

  • PDF

Risk Evaluation in FMEA when the Failure Severity Depends on the Detection Time (FMEA에서 고장 심각도의 탐지시간에 따른 위험성 평가)

  • Jang, Hyeon Ae;Yun, Won Young;Kwon, Hyuck Moo
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.4
    • /
    • pp.136-142
    • /
    • 2016
  • The FMEA is a widely used technique to pre-evaluate and avoid risks due to potential failures for developing an improved design. The conventional FMEA does not consider the possible time gap between occurrence and detection of failure cause. When a failure cause is detected and corrected before the failure itself occurs, there will be no other effect except the correction cost. But, if its cause is detected after the failure actually occurs, its effects will become more severe depending on the duration of the uncorrected failure. Taking this situation into account, a risk metric is developed as an alternative to the RPN of the conventional FMEA. The severity of a failure effect is first modeled as linear and quadratic severity functions of undetected failure time duration. Assuming exponential probability distribution for occurrence and detection time of failures and causes, the expected severity is derived for each failure cause. A new risk metric REM is defined as the product of a failure cause occurrence rate and the expected severity of its corresponding failure. A numerical example and some discussions are provided for illustration.

Prediction of Slope Failure Using Control Chart Method (통계관리도 기법을 적용한 사면붕괴 예측)

  • Park, Sung-Yong;Chang, Dong-Su;Jung, Jae-Hoon;Kim, Young-Ju;Kim, Yong-Seong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.2
    • /
    • pp.9-18
    • /
    • 2018
  • In this study, a field model experiment was performed to analyze the bahavior of slope during failure. It was analyzed through x-MR control chart method with inverse displacement and K-value. As a result, the portent was confirmed at 4 minutes before slope failure in Case 1. The change of the control limit line according to moving range was analyzed and it was effective to apply K = 3. Use of the inverse displacement and x-MR control chart method will be useful for the prediction of abnormal behavior through quick and objective judgment. Prediction of slope failure using control chart method can be used as basic data of slope measurement management standard, and it can contribute in reduction of life and property damage caused by slope disaster.

Global Recovery Management Protocol for Heterogeneous System in Security Environments (보안환경에서 이질형 시스템의 전역 복구 관리 프로토콜)

  • Jeong, Hyun Cheol
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.5 no.4
    • /
    • pp.51-59
    • /
    • 2009
  • Many failures are due to incorrectly programmed transactions and data entry errors. System failure causes the loss or corruption of the contents of volatile storage. Although global processing protects data values to detect direct or indirect information effluence, security environments are very important in the recovery management of heterogeneous systems. Although transaction can't control system fault, the restart for the system can cause information effluence by low bandwith. From various faults, it is not easy to maintain the consistency and security of data. This paper proposes recovery management protocols to assure global multilevel secure one-copy quasi-serializability in security environments of heterogeneous systems with replicated data and proves its correctness. The proposed secure protocols guarantee the reliability and security of system when the system fault is happened.