• Title/Summary/Keyword: Maintenance cost

Search Result 2,577, Processing Time 0.033 seconds

A Case Study of maintenance cost estimation for military official residence building in BTL project (BTL사업 군관사 건축물의 유지관리비용 산정에 관한 연구)

  • Kwon, Bum-Joon;Kim, Hyun-Kyu;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.851-854
    • /
    • 2008
  • The purpose of this study is to predict the maintenance cost for military official residence building projects which were ordered for five military official residence building. In conducting this study, the adapted research method was to classify initial investment for each construction of the military official residence building and to estimate maintenance cost. This study was analyzed by studying the estimation of maintenance cost in the apartments and present value analysis method. The results of this research are as follows. 1) The initial investments was analyzed that the total construction cost would be 1,683,286 thousand won ; construction(79%), civil(3%), landscaping(2%), MEP(5%), heating and hot water supply system(5%), and water supply and sanitary system(6%) per square meter. 2) Based on the result analyzed above, the maintenance cost of the apartments was analyzed and then estimated the proper maintenance cost by using maintenance cost estimation method and present a value analysis method.

  • PDF

The Estimation Method of Equipment Maintenance Cost (장비유지비 소요 예측 기법 연구)

  • Kim, Jeong-Ki
    • Journal of the military operations research society of Korea
    • /
    • v.34 no.3
    • /
    • pp.41-51
    • /
    • 2008
  • Advanced high-tech weapons have enormous affect on combat strength in modern warfare. However, lack of maintenance can cause decrease in equipment operating rate as well as decrease in expectation on demonstrative effect of combat strength during wartime. Therefore it is essential for combat readiness that the optimum requirement of equipment maintenance cost are forecasted and included in the budget. In this paper, the trend of equipment maintenance cost about K-111 1/4t military vehicle is first analyzed by evaluating the performance data of field operation. Secondly, based on above analyzed results, the forecasting model of equipment maintenance cost is designed. Finally, by applying this forecasting model, suggestion and estimation method of equipment maintenance cost have presented for the foreseeable future.

The selection of RCM analysis system for efficient PM Tasks (효과적인 PM 업무를 위한 RCM분석대상 시스템의 선정)

  • Kim, Min-Ho;Song, Kee-Tae;Baek, Young-Gu;Lee, Key-Seo;Yoon, Hwa-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.784-791
    • /
    • 2007
  • Most operational organization and railway authority which conduct scheduled maintenance(SM) have carried out the preventive maintenance(PM) based on the information provided from supplier and manufacturer of railway system. However these activities are far away from reality and low the efficiency, it is because an appropriate methods for system selection didn't take into account for improving maintenance efficiency. Therefore, the current SM tasks and maintenance activities lead to lots of spend on the cost and time. To solve the above problem, this thesis presents new approach methodology. This proposes the criteria for reliability centered maintenance(RCM) system selection through level of quantification of each parameter, i.e, frequency, severity and maintenance cost, etc. To do this, the field operation data and information of maintenance cost are essential. As applying this methodology, we can look forward to improving efficiency of PM/SM, and reducing cost.

  • PDF

Economic Assesment for Track Ballast Structures based on Proper Maintenance Level (적정 유지관리수준에 기초한 궤도도상구조에 대한 경제성 검토)

  • Baek, Jae-Wook;Joo, Hwan-Joong;Song, Yoo-Seob;Park, Tae-Hyo
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.167-178
    • /
    • 2007
  • In general, it is known that the concrete ballast track is possible to reduce a cost of maintenance activities cause of maintenance free by restrictive maintenance in application of track ballast structures. However, if deteriorations and fracture mechanism of a material are considered, proper maintenance activities and repairing are continually required. For the problems, we evaluated an economical efficiency of the gravel ballast and the concrete ballast on a proper level of maintenance activities. As the method based on history path is difficult to obtain sufficient reliabilities cause of an absence of real data for maintenance activities, we chose the delphi survey method by professional group, and we obtained the appropriate index and profiles for maintenance activities. As a result, we founded that effects for cost reduction can be expected by preventive maintenance management, and we proposed economical restrictions and life cycle cost for track ballast structures in a life cycle.

Optimal Maintenance Cycle for Aviation Oil Testing Equipment under the Consideration of Operational Environment (운용환경을 고려한 항공오일시험장비의 최적정비주기 설정)

  • Kim, In Seok;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.16 no.3
    • /
    • pp.224-230
    • /
    • 2016
  • Purpose: Military maintenance involves corrective and preventive actions carried out to keep a system in or restore it to a predetermined condition. This research develops an optimal maintenance cycle for aviation oil testing equipment with acceptable reliability level and minimum maintenance cost. Methods: The optimal maintenance policy in this research aims to satisfy the desired reliability level at the lowest cost. We assume that the failure process of equipment follows the power law non-homogeneous Poisson process model and the maintenance system is a minimal repair policy. Estimation and other statistical procedures (trend test and goodness of fit test) are given for this model. Results: With time varying failure rate, we developed reliability-based maintenance cost optimization model. This model will reduce the ownership cost through adopting a proactive reliability focused maintenance system. Conclusion: Based on the analysis, it is recommended to increase the current maintenance cycle by three times which is 0.5 year to 1.5 years. Because of the system's built-in self-checking features, it is not expected to have any problems of preventative maintenance cycle.

Life Cycle Cost Model for the Acquisition of Rolling Stocks (철도차량 획득단계에 적용되는 수명주기비용 모형에 관한 연구)

  • Kim, Jong-Woon;Chung, Kwang-Woo;Chung, Jong-Duk;Han, Seok-Yun
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.198-205
    • /
    • 2009
  • It is known that the operation and maintenance cost is generally higher than the acquisition cost of rolling stocks. It is very important for reducing the operation and maintenance cost to acquire the rolling stocks which are well designed with regard to the operation and maintenance cost. Therefore life cycle cost including the operation and maintenance cost is needed to be considered from the acquisition phase. This article presents a procedure and a model for life cycle cost which are applicable to the acquisition of rolling stocks.

  • PDF

The Analysis of User Cost according to Timing of National Highway Pavement Maintenance-Focusing on the Maesang Bidge Section in Korea

  • Kim, Yunsik;Lee, Minjae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.606-607
    • /
    • 2015
  • The traffic volume on the road shows various trends reflecting regional characteristics for monthly and hourly, and economic loss affecting users varies according to the selected period for the maintenance of road pavements. Therefore, in this study, the user cost (or delay cost) for monthly and hourly on the work zone near the Maesang Bridge Section on Poseung-Gu, Pyeongtaek-si, Gyeonggi-do was calculated using the time series models and VISSIM, and based on the result, the effect of user cost reduction according to the selection of best maintenance period was examined. The analysis result showed that the month of the lowest user cost occurred due to the maintenance of target section was January (10,293,258 KRW/Day×1km) and the month of the greatest user cost occurred was November (13,337,495 KRW/Day×1km).

  • PDF

The Usefulness of Hard Time Task for Weapon System in Considering Shape Parameter of Weibull Life Time Distribution and Maintenance Cost (와이블 분포의 형상모수와 정비비용을 고려한 Hard Time 예방정비업무의 효용성에 관한 연구)

  • Kim, Mansoo;Ji, Woong Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.1
    • /
    • pp.274-283
    • /
    • 2016
  • The study of maintenance planning is important in military weapon systems because it can improve their availability and reduce the operational and maintenance cost during the total life cycle. In maintenance planning, it is important to determine the preventive maintenance task and its optimal interval. This paper focuses on the hard time task, which is one of the preventive maintenance tasks. A hard time task removes an item or restorative action before some specified maximum age limit to prevent functional failure. The Monte-Carlo simulation model was proposed to help understand the cost effectiveness of a hard time task. In the simulation, various shape parameters of the Weibull distribution and cost ratio of corrective maintenance to preventive maintenance were assumed. Using a Monte-Carlo simulation, a quantified cost saving effect and optimal preventive maintenance interval were suggested.

Analysis of Economic Replacement Cycle of Power Transformer Based on LCC Considering Maintenance Effect

  • Park, Seung-Hwa;Jang, Kyeong-Wook;Kweon, Dong-Jin;Shon, Jin-Geun
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.4
    • /
    • pp.1631-1637
    • /
    • 2018
  • Electric utilities has been considered the necessity to introduce asset management of electric power facilities in order to reduce maintenance cost of existing facilities and to maximize profit. This paper aims to provide data that can helpful to make profitable decision in terms of power transformers which have a significant part in the power system. Therefore, this study is modeling input cost for power transformer during its entire life and also the life cycle cost (LCC) technique is applied. In particular, the variation of transformer state related with maintenance and the variation of the EUAC curve based on cost and effect of maintenance is examined. In this study, the trend of the equivalent uniform annual cost (EUAC) according to maintenance cycle and cost of equipment is analyzed. In line with that, sensitivity analysis influenced by the changes of other cost factors was performed.

Development and Application of the Spare-parts Cost Estimating Relationships (수리부속비 비용추정식 개발과 활용방안)

  • Ryu, Min-Kyu;Lee, Yong-Bok;Kang, Sung-Jin
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.13 no.4
    • /
    • pp.601-611
    • /
    • 2010
  • Currently, a life cycle cost estimates(LCCE) is the most important factor in weapon system acquisition process. However, operation and maintenance(O&M) cost related studies are insufficient from the previous literature survey. O&M cost consists of various cost factors such a man power, maintenance and direct & indirect support costs. We have known that spare-parts cost is a key factor in the O&M cost. In this paper, we developed the spare-parts cost estimating relationships(CERs) of fixed-wing aircraft and armored vehicle weapon systems which include 4 historical cost drivers ; system acquisition cost, deterioration rate, localization rate, mission characteristic. Furthermore, we proposed the application methodologies that O&M cost estimating, total life cycle cost estimating and determination of the economic life using the spare-parts CERs.