• Title/Summary/Keyword: Maintenance Consideration

Search Result 452, Processing Time 0.031 seconds

The Implementation of Risk-Based Inspection for the Refinery Plant

  • Choi, Song-Chun
    • Corrosion Science and Technology
    • /
    • v.11 no.2
    • /
    • pp.43-47
    • /
    • 2012
  • Recently, regulatory bodies quite often encourage to adopt risk-based inspection (RBI) and management programs because they can enhance safety simultaneously with deregulation in Korea. RBI is an integrated methodology that factors risk into inspection and maintenance decision making. This paper describes an example of how to use known risk assessment codes (API 580, API 581 BRD) to address such safety analysis requirements for risk management in the refining industry. Specifically, this paper reports the methodology and the results of implementation to the Crude Distillation Unit(CDU) plant of refinery units using the $KGS-RBI^{TM}$ program, developed by the Korea Gas Safety Corporation in reference of API Codes and ASME PC (Post Construction) with a suitable consideration of Korean situation. The results of the risk and reliability assessment using $KGS-RBI^{TM}$ program are useful in determining whether the detected defects are tolerable or required to be repaired. The subsequent decisions are to manage the future inspection, repair and maintenance planning in the risk reduction control.

Analysis of Route Stability in Mobile Ad Hoc Networks (모바일 애드 혹 네트워크 환경에서 경로 신뢰성 분석)

  • Lee, Do-Hyeon
    • Convergence Security Journal
    • /
    • v.11 no.5
    • /
    • pp.13-19
    • /
    • 2011
  • Mobile nodes in MANETs have the nature of unrestricted mobility so that they will join and leave the network frequently. Therefore, it important consideration to determine the optimal distance progress between relaying nodes along the route in order to maintain the established route for an arbitrary length of time (i.e., route duration). In this paper, we derived the link maintenance probability by considering the initial distance between two relaying nodes and node mobility. Based on the link maintenance probability, we further analyzed the route stability by considering the impact of distance progress between relaying nodes along the route.

A Study on the Economic Evaluation of Thermal Spray Methods for the Corrosion Protection of Steel (금속용사 방식공법의 경제성 평가에 관한 연구)

  • Jung Sung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.13-16
    • /
    • 2005
  • Generally, as corrosive protection processing of a steel structure, zinc galvanizing and heavy duty coating paint are applied. However, zinc galvanizing has the difficulty of restriction of a size, or on-site construction. Moreover, heavy duty coating paint has a problem with many administrative and maintenance expenses with short problem of adhesion, corrosion generating of a damage portion, and maintenance management cycle. In this study, a salt water spray test, CASS test, and the electrochemistry examination were carried out for the thermal metal spray method of construction for corrosive protection performance evaluation. Moreover, the corrosive protection life of a thermal metal spray method of construction was quantitatively calculated on the basis of this experiment. in consideration of LCC, the economical efficiency of a general corrosive protection method of construction and a thermal metal corrosive protection method of construction was compared. Consequently, although initial construction expense was estimated 16 to $30\%$ high, as for a thermal metal spray method of construction, it turns out that the administrative and maintenance expenses for 100 years became cheap 9.3 to 13 or more times.

  • PDF

Improvement of Process and Calculation for Premium Rate in Maintenance Bond (하자보수보증보험의 프로세스 및 요율산정 개선)

  • Choi Min-Yong;Hyun Chang-Taek;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.366-369
    • /
    • 2004
  • Construction demands will become high. Defects liability is treating with a consumer on a defect. Maintenance bond is overlooking excessive responsibility of construction industry participants. This study classified the problem that are divided to systematic and internal matter. And this study presented an improvement proposal. An improvement proposal of a process may reduce a financial burden of contractors and sub-contractors. And improved rate decision will do additional consideration of the study result, so that it is appropriated a rate rationally.

  • PDF

Regression Analysis of Life Cycle Profile for Life Cycle Cost and Bridge Management System (교량관리체계 개선 및 LCC분석을 위한 생애주기 성능이력 회귀함수의 산정)

  • Kong, Jung-Sik;Park, Heung-Min;Lee, Kwan-Kyun;Park, Chang-Ho;Shin, Jae-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.149-154
    • /
    • 2008
  • Service life of bridges should be evaluated by physical life considering damage/deterioration. But it is difficult to identify optimal maintenance scenario due to insufficient research related to that. To identify optimal maintenance scenario, it is needed to develope life cycle profile model of condition state variation by deterioration factor. The LCP model has been developed in consideration of regression analysis and survey in this study. It is expected that the LCP model could help to achieve HBMS system improvement.

  • PDF

A Study on the Application of Vertical Drainage System for Resisting Uplift of Sub-structure (지하구조물 부력방지를 위한 연직배수시스템의 적용성 연구)

  • Chun, Byung-Sik;Yeoh, Yoo-Hyeon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.2
    • /
    • pp.183-190
    • /
    • 2001
  • A sub-structure is uplift if the floating greater than dead load of a structure. When such occasion arise, a structure sustain damage. In general, the measures for floating prevention of structure are a permanent anchor method and a drainage method. The primary construction cost of a permanent anchor method is heavy. And a drainage method is needed maintenance management long term. At this point, the measures for floating prevention of a notion being requires the other days. Therefore, at this study a simple construction and a economic vertical drainage system was developed. The findings be used in the in-situ and gave careful consideration to an application. The result of examination, this system considering a characteristic of coefficient of permeability for the ground controls occurrence of floating despite the water level rise of the ground, which a period of construction get shorter compared with other methods, which understood that measures satisfactory in the financial aspect. Especially, A structure occurring effects of flatting under the course of construction made use of it. As the result of the effect of it was confirmed by construction.

  • PDF

Effects of the Trunk Maintenance Repositioning Method on Keeping a 30° Side-Lying Position, Comfort, and Skin Condition (체간 유지 체위변경 방법이 30도 측위 유지, 편안함 및 피부 상태에 미치는 효과)

  • Lee, Chae Won;Yi, Young Hee
    • Journal of Korean Critical Care Nursing
    • /
    • v.11 no.1
    • /
    • pp.79-88
    • /
    • 2018
  • Purpose : This study was performed to evaluate the effects of a prolonged a $30^{\circ}$ side-lying position on comfort and skin condition by applying the trunk maintenance repositioning method, which can keep the $30^{\circ}$ side-lying position effective for preventing pressure ulcers. Method : Fifty-four healthy nurses working at a general hospital in Seoul were randomly assigned to an experimental group (n=27) or a control group (n=27) and assumed a position of lying on their right or left side for two hours. The trunk maintenance repositioning method was applied to the experimental group using the pillow made by the researcher, while the original repositioning method was applied to the control group using the regular pillow from the subject hospital. Participants' posture angles, comfort, and skin condition were measured at the time of the intervention, as well as at one and two hours after the intervention. Results : There was no statistically significant difference in position angle, comfort, skin condition change, or sacrum and greater trochanter pressure change between the two groups over time. Conclusion : It is necessary to review the method and frequency of change of position in each hospital. In addition, a proper position changing pillow should be developed in consideration of patients' various body shapes.

Case Study on Deciding a Time for Repairing Asphalt Pavement of Incheon International Airport (인천국제공항 아스팔트 포장 보수시기 결정 사례 연구)

  • Lee, Jae-Ho;Kim, Jang-Rack;Mun, Hyung-Chul;Cho, Nam-Hyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.6
    • /
    • pp.49-60
    • /
    • 2013
  • PURPOSES : The evaluation of the pavement condition of the asphalt concrete pavement of No. 2 runway of Inchon International Airport through PMS, a supporting system for making a decision of pavement, maintenance and repair, was made, and the proper time for repair according to the PCI reduction rate was suggested. METHODS : By comparing and analyzing the evaluation results of pavements built in 2009, 2010, 2011, PCI change in each facility (No. 2 runway, C parallel taxiway, connection taxiway) was calculated. By applying the calculated change to PCI deduction rate model, the pavement condition of the target sections was estimated, and then the necessary section and time for repair were chosen. RESULTS : After careful consideration of the time for pavement and maintenance, based on the result of PCI prediction, it was estimated that the southern takeoff and landing section of No. 2 runway was required to be repaired in 2012; connection taxiway in 2013; and C parallel taxiway in 2014; however, the section which is the main moving route of connection taxiway and C parallel taxiway was needed to be repaired in 2012. CONCLUSIONS : For maintenance and repair of airport pavements, the optimal alternative should be chosen by considering economics and operability, via examining the time for repair and the aspect of management all together on the basis of this study.

Pump availability prediction using response surface method in nuclear plant

  • Parasuraman Suganya;Ganapathiraman Swaminathan;Bhargavan Anoop
    • Nuclear Engineering and Technology
    • /
    • v.56 no.1
    • /
    • pp.48-55
    • /
    • 2024
  • The safety-related raw water system's strong operational condition supports the radiation defense and biological shield of nuclear plant containment structures. Gaps and failures in maintaining proper working condition of main equipment like pump were among the most common causes of unavailability of safety related raw water systems. We integrated the advanced data analytics tools to evaluate the maintenance records of water systems and gave special consideration to deficiencies related to pump. We utilized maintenance data over a three-and-a-half-year period to produce metrics like MTBF, MTTF, MTTR, and failure rate. The visual analytic platform using tableau identified the efficacy of maintenance & deficiency in the safety raw water systems. When the number of water quality violation was compared to the other O&M deficiencies, it was discovered that water quality violations account for roughly 15% of the system's deficiencies. The pumps were substantial contributors to the deficit. Pump availability was predicted and optimized with real time data using response surface method. The prediction model was significant with r-squared value of 0.98. This prediction model can be used to predict forth coming pump failures in nuclear plant.

A Study of Planning for Sujeong-dong Garden Heritage Maintenance (고산 윤선도 수정동 정원유적 정비에 관한 연구)

  • Kim, Moo-Han;Sung, Jong-Sang
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.33 no.2
    • /
    • pp.12-20
    • /
    • 2015
  • Sujeong-Dong garden heritage is a unique, valuable villa garden constructed by Gosan Yoon Sun-Do during middle Joseon period. However, the site has been faced on damage risk because of the development of near quarry. The purpose of the study is to suggest careful maintenance plan for the valuable Korean traditional garden heritage. For the plan, the study conducts the interview of residents and experts, literature review, the investigation of historical materials, site survey, and the analysis of aerial photography. The results are following: Firstly, the paper divides the site into three types of an excavation area: core, recommend and investigation. Secondly, of remained Gosan's one and remains of unknown contents, it has the plan of vegetation maintenance, safety facilities, pathway maintenance, and service area. Thirdly, it also suggests pathway plan for authentic garden promenade according to the literature of Sanjungsingok(山中新曲), site survey, and interviews with residents and experts. The study has a special meaning for an insightful approach based on the accurate site survey, research, and the consideration of practical use.