• 제목/요약/키워드: Loop Power Distribution System

검색결과 81건 처리시간 0.025초

향후 신뢰도 목표를 만족하는 개폐기 설치 기준 제시 (The Switch Installation Criteria For Satisfying Future Reliability Goal)

  • 조남훈;오정환;하복남;이흥호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권9호
    • /
    • pp.433-440
    • /
    • 2002
  • The addition of switches to a distribution feeder does, in general, increase reliability by decreasing the duration of the outage of many to the customers on the feeder. To cover its service area so that feeder-level delivery reaches sufficiently close to all customers, feeders typically split their routes many times, in what is often called a lateral feeder. It is interesting to note, however, that the effectiveness of a switch is very much dependent on the types of lateral feeder. The types of lateral are classified into two types. The first is loop lateral feeder that can connect its load to an adjacent feeder through a tie line in case that a fault occurs in its feeder and it is laid out so that every feeder has complete fault backup through re-switching of its loads to other sources like a main feeder The second is the radial lateral feeder cannot connect its load to an adjacent line, no provision is made for contingency backup of feeders. There are no other circuits in the radial lateral feeder form which to restore power. In this study, we evaluate the effectiveness of a switch installation between on the radial and loop lateral feeders to increase reliability by decreasing the duration of the outage. These results can help power utility to design the switch layouts on the radial and loop lateral feeder system.

연계선로가 없는 배전선로에서 BESS기반 정전복구를 위한 토폴로지 재구성 방안 (A Network Reconfiguration Method for BESS based Service Restoration in Distribution Systems)

  • 임성일
    • 전기학회논문지
    • /
    • 제66권10호
    • /
    • pp.1460-1465
    • /
    • 2017
  • Outage areas can be transferred to adjacent feeders to restore power supply in case of the fault on the distribution system. Feeders in the small island or mountain area may not have backup feeders due to the low density of load. In this weakly meshed open loop system, BESS can be used as a backup feeder to improve reliability of power supply. This paper proposes a new network reconfiguration method for BESS based service restoration. Fuzzy decision making technique is adopted to deal with fuzziness of service restoration planning rules. Case studies using KEPCO real distribution system have been performed to verify feasibility of the proposed method.

배전기기 전압계측 정밀도 평가시스템 개발 및 성능시험 (A Development and Performance Test of Voltage Measurement Accuracy Assessment System for Distribution Equipment)

  • 조진태;김주용;이학주;김재한
    • 조명전기설비학회논문지
    • /
    • 제27권9호
    • /
    • pp.83-89
    • /
    • 2013
  • Power distribution system has been changed from radial system to closed loop or mesh system due to connection of distributed generation growth. Data from distribution equipments which are installed at distribution line is required to be accurate for the performance of DMS(Distribution Management System). This paper analyzes the voltage measurement data from distribution equipment. However, the results of the analysis are confirmed to have some errors in voltage measurement data from distribution equipment. These errors come from aging of voltage sensor in distribution equipment and inaccurate data transfer to FRTU(feeder remote terminal unit) through the controller. The main problem is that the voltage measurement data of distribution equipment can not be assessed after it's first installation at the distribution line. The voltage measurement accuracy assessment system is to assess the voltage measurement data from distribution equipment on hot-line. This study had a field test to verify the performance of system.

계통 연계형 태양광 인버터에서 최대 출력 점 추적 제어 (Maximum Power Point Tracking Control for a Grid-Tie Photovoltaic Inverter)

  • 이우철
    • 조명전기설비학회논문지
    • /
    • 제23권5호
    • /
    • pp.72-79
    • /
    • 2009
  • 태양 에너지는 재생 가능하고 오염이 없는 특성으로 바람직한 에너지 원이다. 계통에 이용하기 위해서는 dc-dc 컨버터와 계통 연계 do-ac 인버터가 필요하다. dc-dc 컨버터는 태양광 시스템이 높은 dc전압에 동작하기 위하여 필요하고, 인버터는 계통에 연결하기 위하여 필요한 전압과 주파수를 만들어 내는데 필요하다. 본 논문에서는 첫째로 단상 계통 연계 인버터에서 전류 루프 전달 함수가 유도되고, 둘째로 컨버터 측에서 컨덕턴스 증가 방식의 MPPT 방식이 제안하여 인버터 측에 최대 전력을 공급하는데 있다. 시뮬레이션 결과가 계통에서 태양광 인버터 시스템의 성능과 특성을 보여준다.

분산전원이 연계된 배전선로의 운영시스템 설계 (Operation System Design of Distribution Feeder with Distributed Energy Resources)

  • 김성만;장영학;김경훈;김슬기;문채주
    • 한국전자통신학회논문지
    • /
    • 제16권6호
    • /
    • pp.1183-1194
    • /
    • 2021
  • 전통적으로 전력시스템은 공급체계의 말단에 있는 소비자의 위치에서 보면 중앙집중화된 구조를 갖고 있다. 그러나 최근 수 십년간 지붕형 태양광, 영농형 태양광, 소형 풍력터빈, 배터리저장장치 및 스마트 가전품과 같은 분산에너지원의 등장을 보아왔다. 분산에너지원의 등장에 따라 배전계통 운전원의 역할도 확장된다. 확장된 분산전원의 진출은 배전망이나 송전망의 전통적인 계획과 운영에 영향을 주는 전력계통의 역조류와 예측성을 어렵게 할 수 있다. 이는 전형적인 계통계획, 정비 및 망관리, 정전할당 등 배전계통 운전원이 갖는 기능이 변경되어야 할 필요성을 증폭시킨다. 이 연구의 목적은 다중 분산전원을 갖는 미래 배전운전시스템을 설계하고 제안된 배전시스템 모델을 HILS로 구현 및 검증하는 것이다. 시험결과를 보면 제안된 배전시스템이 정상 영역에서 운전되고 배전선로 손실이 감소된다는 것을 보여준다.

A Three-phase Hybrid Power Flow Algorithm for Meshed Distribution System with Transformer Branches and PV Nodes

  • Li, Hongwei;Wu, Huabing;Jiang, Biyu;Zhang, Anan;Fang, Wei
    • Journal of Electrical Engineering and Technology
    • /
    • 제11권1호
    • /
    • pp.65-75
    • /
    • 2016
  • Aiming at analyzing the power flow of the distribution systems with distribution transformer (DT) branches and PV nodes, a hybrid three-phase power flow methodology is presented in this paper. The incidence formulas among node voltages, loop currents and node current injections have been developed based on node-branch incidence matrix of the distribution network. The method can solve the power flow directly and has higher efficiency. Moreover, the paper provides a modified method to model DT branches by considering winding connections, phase shifting and off-nominal tap ratio, and then DT branches could be seen like one transmission line with the proposed power flow method. To deal with the PV nodes, an improved approach to calculate reactive power increment at each PV node was deduced based on the assumption that the positive-sequence voltage magnitude of PV node is fixed at a given value. Then during calculating the power flow at each iteration, it only needs to update current injection at each PV node with the proposed algorithm. The process is very simple and clear. The results of IEEE 4 nodes and the modified IEEE 34 nodes test feeders verified the correctness and efficiency of the proposed hybrid power flow algorithm.

DS/CDMA 시스템의 적응형 폐쇄루프 전력 제어 알고리즘 (Adaptive Closed-Loop Power Control Algorithm in DS/CDMA system)

  • 감두열;박상규
    • 한국통신학회논문지
    • /
    • 제25권3A호
    • /
    • pp.383-390
    • /
    • 2000
  • In this paper, an adaptive power control algorithm in the DS/CDMA system is proposed. The currently used transmitter/receiver based on IS-95 and the radio propagation channel under mobile communication environments are modeled. Theses are the key features for the simulation to analyse the performance of power control. the distribution of the received SIR(signal to interference ratio)and the bit error probability are the required parameters for the performance analysis. Furthermore the influence of the power control command error on the above parameters are analyzed. By using the performance analysis of IS-95 and the occurrence of burst errors that is characteristic for wireless channels. the new power control algorithm is proposed. The proposed power control algorithm increases the SIR which results in a better service quality and an enhancement in the system capacity.

  • PDF

고기동 유도무기를 위한 HWIL 시뮬레이션 제어 시스템 개발 연구 (A Study on the Development of HWIL Simulation Control System for High Maneuver Guided Missile System)

  • 김운식;이병선;김상하
    • 한국통신학회논문지
    • /
    • 제35권11B호
    • /
    • pp.1659-1666
    • /
    • 2010
  • 고기동 유도탄들은 다양한 탄내 인터페이스와 빠른 유도 조종 루프를 가진다. 그러므로 Hardware-in-the-Loop(HWIL) 시뮬레이션 제어 시스템은 고성능의 연산기능 및 하드웨어 인터페이스 기능을 가져야 하며, 실시간 운영체제, 임베디드 시스템, 자료 통신, 실시간 하드웨어 제어와 같이 다양한 IT 분야를 융합하여 개발되어야 한다. 이 논문은 고기동 유도탄의 HWIL 시뮬레이션을 수행하기 위한 제어 시스템 설계 기법으로 시스템 하드웨어 구성, 고성능의 다중 프로세서를 사용하기 위한 업무 할당 알고리즘, HWIL 시뮬레이션 실시간 연산 및 제어 기법, 프로세서 통신 기법, 실시간 자료 획득 기법을 제시한다.

LabVIEW를 이용한 가상 배전계통의 HILS 시스템 구축에 관한 연구 (A Study on HILS System for Virtual Distribution System Using LabVIEW)

  • 이원석;황선환;김태성
    • 전기전자학회논문지
    • /
    • 제24권2호
    • /
    • pp.385-391
    • /
    • 2020
  • 배전계통에서의 과전류 및 이상 전압 현상은 전력설비에 부담을 줄 뿐만 아니라 수용가에 치명적인 피해를 입힐 수 있다. 그로 인해 실시간 배전계통 시뮬레이터를 활용하여 신속한 고장처리와 정전구간 축소 및 고장복구를 통한 전력공급의 신뢰도를 높이는 배전자동화 관련 연구가 활발히 진행되고 있다. 기존의 디지털 시뮬레이터를 이용한 배전계통 모의시스템은 고가의 설비로 시스템 구축에 제약이 있고 실 배전계통을 통한 검증 또한 불가능하다. 본 논문에서는 배전계통 디지털 시뮬레이터의 계통해석결과를 기반으로 배전자동화용 단말장치와의 연동을 통해 실시간 시뮬레이션 및 기능검증이 가능한 시스템을 개발하였다. 제안한 시스템의 효용성은 실험을 통해 검증하였다.

실시간 시뮬레이터 기반의 스마트 인버터 제어기능 시험 환경 구축 및 시험 결과 (Test bed for Advanced function of Smart Inverter and Results Based on Real-Time Simulation Platform)

  • Sim, Junbo;Ban, Minho;Lim, Hyeonok;Cho, Seong-Soo
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권1호
    • /
    • pp.107-114
    • /
    • 2021
  • High penetration of renewable energy generators causes unnecessary investment for power system facilities. Especially with Korean government policies such as Renewable Energy 3020 and Inter-connection support Responsibility of KEPCO for 1 MW DERs, the applications of DER interconnection in distribution system have been increasing. To save the investment, smart control functions for DERs are required and the test bed for the inverters which have not been prepared are necessary to insure DER inter-connection stability. For this, test bed for advanced functions of a smart inverter has been constructed and the tests for necessary functions have been implemented. In this paper, the test bed and environment as well as specifications are introduced and the test results for the validation of the functions are analyzed.