• 제목/요약/키워드: Loop Power Distribution System

검색결과 81건 처리시간 0.024초

배전운영 시스템에서 상시개방 연계 스위치 투입에 의한 루프 운전 중 구간전압 계산 방법 (Section Voltage Calculation while a Loop Operation by Tie-Switch Close in a Distribution Management System)

  • 서정수;임일형;박종호;신용학;최면송
    • 전기학회논문지
    • /
    • 제65권3호
    • /
    • pp.397-403
    • /
    • 2016
  • Generally, an electrical distribution configuration is a radial system with one-way current in a distribution management system (DMS). All feeders in a DMS have tie-switches to make radial system. Sometimes, DMS should change a tie-switch for operation. In that case, the tie-switch has to be closed first; then a switch is opened as another tie-switch in order to prevent blackout for customers. At the moment when the tie-switch is closed, distribution system is operated in a loop state, not radial. Before the loop operation, DMS operator has to check any expected events for stable distribution system operation; and the most important event is a mis-operation of a protection relay. In addition, DMS operator should check voltage profile violation but a calculation method of section voltages had not been used. Thus, this paper proposes a calculation method of section voltages at a loop operation in a DMS. The proposed calculation algorithm is verified by Matlap Simulink.

저압 직류 배전용 양극성 DC-DC 컨버터에 관한 연구 (A Study on Bipolar DC-DC Converter for Low Voltage Direct Current Distribution)

  • 이정용;김호성;조진태;김주용;조영훈
    • 전력전자학회논문지
    • /
    • 제24권4호
    • /
    • pp.229-236
    • /
    • 2019
  • This study proposes a DC-DC converter topology of solid-state transformer for low-voltage DC distribution. The proposed topology consists of a voltage balancer and bipolar DC-DC converter. The voltage and current equations are obtained on the basis of switching states to design the controller. The open-loop gain of the controller is achieved using the derived voltage and current equations. The controller gain is selected through the frequency analysis of the loop gain. The inductance and capacitance are calculated considering the voltage and current ripples. The prototype is fabricated in accordance with the designed system parameters. The proposed topology and designed controller are verified through simulation and experiment.

A New Dynamic Reliability Assessment for Mid-loop Operations in a Nuclear Power Plant

  • Jae, Moosung
    • International Journal of Reliability and Applications
    • /
    • 제3권1호
    • /
    • pp.25-35
    • /
    • 2002
  • This paper presents a dynamic reliability assessment methodology for use in the safety assessment of a complex system such as a nuclear power plant. The method is applied to a dynamic analysis of the potential accident sequences that may occur during mid-loop operation in a nuclear power plant. The idea behind this approach consists of both the use of the concept of the performance achievement/requirement correlation and of a dynamic event tree generation method. The assessment of the system reliability depends on the determination of both the required performance distribution and the achieved performance distribution. The quantified correlation between requirement and achievement represents a comparison between two competing variables. It is demonstrated that this method is easily applicable and flexible in that it can be applied to any kind of dynamic reliability problem.

  • PDF

간선 및 분기선의 개폐기 설치 효과 분석(II) (Reliability analysis of the switch installation in the main feeder and in the radial/loop lateral feeders in distribution system)

  • 조남훈;오재형;이흥호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.83-86
    • /
    • 2002
  • In this study, we evaluate the effectiveness of a switch installation between on the radial and loop lateral feeders to increase reliability by decreasing the duration of the outage. These results can help power utility to design the switch layouts on the radial and loop lateral feeder system.

  • PDF

배전선로 상시연계점 측정 전압 위상차를 이용한 변전소 모선 위상각 추정 방법 (Substation Bus Voltage Angle Calculation Method Using Voltage Angle Difference Measured at the Tie Switch in the Distribution Line)

  • 손주환;임성일
    • 전기학회논문지
    • /
    • 제65권1호
    • /
    • pp.9-15
    • /
    • 2016
  • Distribution networks are operated in radial fashion during the normal state. Loop configuration is also required temporally in case of live load transfer among the adjacent feeders. Voltage angles of each substation buses are very important data in order to calculate power flow of the loop structured distribution feeders. This paper proposes substation bus voltage angle calculation method using voltage angle difference measured at the normally open tie switches. Simulation case studies using Matlab simulink have been performed to establish feasibility of proposed method.

배전선로에서의 조가선 차폐 효과 연구 (A Study on a Shielding Effect of the Messenger Wires in Distribution Lines)

  • 김인수;한웅;여상민;김철환;원봉주;임용훈
    • 전기학회논문지
    • /
    • 제58권3호
    • /
    • pp.431-436
    • /
    • 2009
  • As the telecommunication lines bring into widespread use, one of the most important aspects related to power distribution systems is effectively to evaluate the effect on the telecommunication lines from power lines. One of the efficient methods to evaluate the effect is to measure the induced voltage of a telecommunication line as a result of a ground-loop. If the power lines cause high induced voltage, the ground reference in the telecommunication lines is no longer a stable potential, so signals may ride on the noise. A ground loop is common wiring conditions where a ground current may take more than one path to return to the grounding electrode at the arrangement between the power lines and telecommunication lines. When a multi-path connection between the power lines and telecommunication line circuits exists, the resulting arrangement is known as a ground loop. Whenever a ground loop exists, there are potential for damages or abnormal operations of the telecommunication lines. The power lines can induce the voltage on the communication line. The effects can be calculated by considering the inductances and capacitances. However, if we assume that there are only power lines, it doesn't have a practical meaning because there are conductors with other purpose in the neighborhood of the lines. If we consider that case, we need more complex system. Therefore we suggest more complex system considering the conductors with other purpose in the neighborhood of the lines. The neutral wires and the overhead ground wires are considered for calculating the induced voltage. We assume that there are the messenger wires beside the power line as a result of increased use of them. The main purpose of this paper is a study on a shielding effect of messenger wires in the distribution lines. EMTP(Electro-Magnetic Transients Program) program is used for the induced voltage calculation.

간선 및 분기선의 개폐기 설치 효과 분석(I) (Reliability analysis of the switch installation in the main feeder and in the radial/loop lateral feeders in distribution system)

  • 조남훈;오재형;이흥호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.79-82
    • /
    • 2002
  • The addition of switches to a distribution feeder does, in general, increase reliability by decreasing the duration of the outage of many to the customers on the feeder. To cover its service area so that feeder-level delivery reaches sufficiently close to all customers, feeders typically split their routes many times, in what is often called a lateral feeder. It is interesting to note, however, that the effectiveness of a switch is very much dependent on the types of lateral feeder. The types of lateral are classified into two types. The first is loop lateral feeder that can connect its load to an adjacent feeder through a tie line in case that a fault occurs in its feeder and it is laid out so that every feeder has complete fault backup through re-switching of its loads to other sources like a main feeder. The second is the radial lateral feeder cannot connect its load to an adjacent line, no provision is made for contingency backup of feeders. There are no other circuits in the radial lateral feeder form which to restore power. In this study, we evaluate the effectiveness of a switch installation between on the radial and loop lateral feeders to increase reliability by decreasing the duration of the outage. These results can help power utility to design the switch layouts on the radial and loop lateral feeder system.

  • PDF

A Practical Voltage Error Correction Technique for Distribution System under Distribution Automation Environment

  • Aslam, Muhammad;Kim, Hyung-Seung;Choi, Myeon-Song;Lee, Seung-Jae
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권2호
    • /
    • pp.669-676
    • /
    • 2018
  • Transmission system has been well studied since long time and power system techniques of distribution system are more or less derived from transmission system. However, unlike transmission systems, many practical issues are encountered in the distribution system. Considerable amount of error is observed in voltage obtained from the Feeder Remote Terminal Units (FRTUs) measured by the pole mounted PTs along the distribution feeder. Load uncertainty is also an issue in distribution system. Further, penetration of Distributed Generators (DGs) creates voltage variations in the system. Hybrid radial/ loop distribution system also make it complicated to handle distribution system. How these constraints to be handled under Distribution Automation (DAS) environment in order to obtain error free voltage is described in this paper and therefore, a new approach of voltage error correction technique has been proposed. The proposed technique utilizes reliable data from substation and the FRTUs installed in DAS. The proposed technique adopts an iterative process for voltage error correction. It has been tested and proved accurate not only for conventional radial systems but also for loop distribution systems.

휴리스틱 탐색전략을 이용한 배전계통 계획의 급전선 최적 경로 선정 (Optimal Feeder Routing for Distribution System Planning Using a Heuristic Strategy)

  • 최남진;김병섭;신중린
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권11호
    • /
    • pp.566-574
    • /
    • 2000
  • This paper propose a heuristic algorithm based on the Branch-Exchange (BE) method to solve Optimal feeder Routing(OFR) problem for the distribution system planning. The cost function of the OFR problem is consisted of the investment cost representing the feeder installation and the system operation cost representing the system power loss. We propose a properly designed heuristic strategy, which can handle the horizon-year expansion planning problem of power distribution network. We also used the loop selection method which can define the maximum loss reduction in the network to reduce calculation time, and proposed a new index of power loss which is designed to estimate the power loss reduction in the BE. The proposed index, can be considered with both sides, the low voltage side and voltage side branch connected with tie one. The performances of the proposed algorithms and loss index were shown with 32, 69 example bus system.

  • PDF

개선된 선로교환 기법을 이용한 방사상 전력계통의 최적 라우팅 알고리즘의 적용 (An Application of the Optimal Routing Algorithm for Radial Power System using Improved Branch Exchange Technique)

  • 김병섭;신중린;박종배
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권6호
    • /
    • pp.302-310
    • /
    • 2002
  • This paper presents an application of a improved branch exchange (IBE) algorithm with a tie branch power (TBP) flow equation to solve the Optimal Routing problem for operation of a radial Power system including power distribution system. The main objective of the Optimal Routing problem usually is to minimize the network real power loss and to improve the voltage profile in the network. The new BE algorithm adopts newly designed methods which are composed by decision method of maximum loss reduction and new index of loss exchange in loop network Thus, the proposed algorithm in this paper can search the optimal topological structures of distribution feeders by changing the open/closed states of the sectionalizing and tie switches. The proposed algorithm has been evaluated with the practical IEEE 32, 69 bus test systems and KEPCO 148 bus test system to show favorable performance gained.