• 제목/요약/키워드: Long-term project

검색결과 741건 처리시간 0.027초

Exploring Long-Term Performance in Design-Build Best-Value Evaluation Criteria

  • Calahorra-Jimenez, Maria;Poore, Tanner
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.74-82
    • /
    • 2022
  • Improving long-term performance in highway projects is an imperative goal for public administrations. Project delivery and procurement methods might provide an opportunity to align design and construction processes with this goal. Previous studies have explored whether project delivery methods impact the long-term performance of highway projects. However, these studies did not focus specifically on how core elements within the procurement might relate to long-term performance. Thus, this research aims to fill this gap by exploring to what extent and how long-term evaluation criteria are considered in design-build best-value procurement of highway projects. To this end, content analysis was conducted on 100 projects procured between 2009 and 2019 by 19 DOTs across the U.S. The analysis of 365 evaluation criteria found that (1) roughly 11% of them related to long-term performance. (2) The weight given to these criteria in the overall technical proposal was lower than 30%. (3) Sixty-five percent (65%) of long-term evaluation criteria focused on design while 15% related to materials and technology, respectively. The results of this study are a first steppingstone to initiate a deep exploration of the relationship between procurement practices and actual project performance. Currently, with sustainability and life cycle assessments being top concerns in infrastructure projects, this line of research might be of particular interest to DOTs and highway agencies across the U.S. and worldwide.

  • PDF

The SPIZWURZ project - Experimental investigations and modeling of the behavior of hydrogen in zirconium alloys under long-term dry storage conditions

  • Mirco Grosse;Felix Boldt;Michel Herm;Conrado Roessger;Juri Stuckert;Sarah Weick;Daniel Nahm
    • Nuclear Engineering and Technology
    • /
    • 제56권3호
    • /
    • pp.824-831
    • /
    • 2024
  • In order to investigate the occurring processes during long-term dry storage of spent fuel assemblies, a joined project called SPIZWURZ, between the Karlsruhe Institute of Technology and the Gesellschaft für Anlagen-und Reaktorsicherheit (GRS), was started. Aim of the SPIZWURZ project is the determination and quantification of the influence of texture and elastic strain on diffusion and solubility of hydrogen in three different zirconium alloys used in western Europe during a long-term cooling transient (1 K/d) starting at 400 ℃. The strain in the cladding of an irradiated spent fuel rod shall be measured. Models predicting the formation of radial oriented hydrides will be validated, improved, and implemented in the GRS fuel rod performance code TESPA-ROD. This paper describes the SPIZWURZ project and already obtained first results.

Application of Neural Network for Long-Term Correction of Wind Data

  • ;김현구
    • 신재생에너지
    • /
    • 제4권4호
    • /
    • pp.23-29
    • /
    • 2008
  • Wind farm development project contains high business risks because that a wind farm, which is to be operating for 20 years, has to be designed and assessed only relying on a year or little more in-situ wind data. Accordingly, long-term correction of short-term measurement data is one of most important process in wind resource assessment for project feasibility investigation. This paper shows comparison of general Measure-Correlate-Prediction models and neural network, and presents new method using neural network for increasing prediction accuracy by accommodating multiple reference data. The proposed method would be interim step to complete long-term correction methodology for Korea, complicated Monsoon country where seasonal and diurnal variation of local meteorology is very wide.

  • PDF

복원사업 후 마을비보숲의 장기 식생 변화 - 완주군 두방 마을비보숲을 사례로 - (Long-term Vegetation Change of the Complementary Village Forest after Restoration Project - Centered on the Village Complementary Forest of Wanju Dubang Village -)

  • 박재철;두은
    • 농촌계획
    • /
    • 제25권3호
    • /
    • pp.129-139
    • /
    • 2019
  • The purpose of this study is to monitor the long-term vegetation change of the village complementary forest after restoration. Based on the monitoring in 2010, six years after the restoration project in 2004, the monitoring of the complementary forest in Dubang village in 2019 after 9 years was conducted. This study identifies the change of species diversity and structure, growth, vegetation coverage, structural quality etc. and succession through long-term monitoring. For this, field survey was conducted in 2003 and 2010, 2019. The results demonstrate significant increase of species diversity and multi-layer structure and progress of natural succession. Overall, Part I is considered to be a quasi-natural complementary village forest, which has a natural balance between natural vegetation that have remained in nature for a long time and anthropogenic vegetation, revealing the coexistence of nature and humanity. It means ecological structure and function have improved. Part II should be restored to the lost part and adaptive management rather than excessive management should be carried out to leave natural succession.

Long-Term Wind Resource Mapping of Korean West-South Offshore for the 2.5 GW Offshore Wind Power Project

  • Kim, Hyun-Goo;Jang, Moon-Seok;Ko, Suk-Hwan
    • 한국환경과학회지
    • /
    • 제22권10호
    • /
    • pp.1305-1316
    • /
    • 2013
  • A long-term wind resource map was made to provide the key design data for the 2.5 GW Korean West-South Offshore Wind Project, and its reliability was validated. A one-way dynamic downscaling of the MERRA reanalysis meteorological data of the Yeongwang-Gochang offshore was carried out using WindSim, a Computational Fluid Dynamics based wind resource mapping software, to establish a 33-year time series wind resource map of 100 m x 100 m spatial resolution and 1-hour interval temporal resolution from 1979 to 2012. The simulated wind resource map was validated by comparison with wind measurement data from the HeMOSU offshore meteorological tower, the Wangdeungdo Island meteorological tower, and the Gochang transmission tower on the nearby coastline, and the uncertainty due to long-term variability was analyzed. The long-term variability of the wind power was investigated in inter-annual, monthly, and daily units while the short-term variability was examined as the pattern of the coefficient of variation in hourly units. The results showed that the inter-annual variability had a maximum wind index variance of 22.3% while the short-term variability, i.e., the annual standard deviation of the hourly average wind power, was $0.041{\pm}0.001$, indicating steady variability.

Metrics for Measuring Innovation in Integrated Project Delivery

  • 이태식;란잔스와인;박경순;김영현
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.322-325
    • /
    • 2006
  • The research project evaluates different infrastructure project delivery methods used internationally. The goal is to define the main benefits, deficiencies, and requirements of the project delivery systems for both the short term and long term perspectives. Also, the research attempts to determine alternatives to modify and to promote change in the current infrastructure project delivery methods in order to make the processes more efficient with value added benefits to all participants.

  • PDF

Criteria for Determining Working Area and Operating Cost for Long-Term Lease of Agricultural Machinery

  • Shin, Seung Yeoub;Kang, Chang Ho;Yu, Seok Cheol;Kim, Yu Yong;Noh, Jae Seung
    • Journal of Biosystems Engineering
    • /
    • 제40권3호
    • /
    • pp.178-185
    • /
    • 2015
  • Purpose: This research suggests a method of establishing criteria for working area and operating cost for a long-term lease of agricultural machinery. Methods: Eight crops were selected-three food crops and five open-field vegetables-and agricultural machines used for sowing, transplanting, and cultivation in dry-field farming were analyzed. Results: The break-even acreage for agricultural machinery under a long-term lease was found to differ by agricultural machine, ranging from 1.0 to 5.8 ha. In terms of arable land area, the break-even acreages for harvesting machinery and transplanters were 15.6 to 26.1 ha and 6.1 to 8.6 ha, respectively. The working area lessees should secure was divided into two cases: (1) 2.0 to 11.6 ha when leasing individual agricultural machines (sowing and transplanting) for a long-term period, and (2) more than 10 ha when farmers who cultivate beans, potatoes, garlic, onions, and so on lease sowing and transplanting machines as a set. When agricultural machinery was leased for a long term, the operating cost and working time were reduced by 27.6 to 74.4% and 2.5 to 21.6%, respectively, indicating considerable effect. Conclusions: A long-term lease project needs to be promoted to overcome the limitation of short-term leases of agricultural machinery. The local government should lead this project and facilitate the mechanization of dry-field farming. The department in charge of agricultural machinery lease projects needs to set the working area to cover the rate and maintenance cost for farmers who lease agricultural machinery for the long term.

발전량, 가격, 장기금리 변동성을 기초로 한 풍력발전사업의 실물옵션 가치평가 (Real Option Valuation of a Wind Power Project Based on the Volatilities of Electricity Generation, Tariff and Long Term Interest Rate)

  • 김영경;장병만
    • 신재생에너지
    • /
    • 제10권1호
    • /
    • pp.41-49
    • /
    • 2014
  • For a proper valuation of wind power project, it is necessary to consider volatilities of key parameters such as annual energy production, electricity sales price, and long term interest rate. Real option methodology allows to calculate option values of these parameters. Volatilities to be considered in wind project valuation are 1) annual energy production (AEP) estimation due to meteorological variation and estimation errors in wind speed distribution, 2) changes in system marginal price (SMP), and 3) interest rate fluctuation of project financing which provides refinancing option to be exercised during a loan tenor for commercial scale projects. Real option valuation turns out to be more than half of the sales value based on a case study for a FIT scheme wind project that was sold to a financial investor.

원자력 중장기 연구개발 사업 생산성 향상 사례 (Productivity Upgrading Case for Mid-Term and Long-Term Nuclear R & D)

  • 정관성;한도희;장원표;이용범;권영민
    • 한국기술혁신학회:학술대회논문집
    • /
    • 한국기술혁신학회 2001년도 춘계학술대회:발표자료
    • /
    • pp.547-553
    • /
    • 2001
  • A ideal Methodology is a technology that efficiently utilize outputs of research and development (R&D). "Liquid Metal Reactor Design. Technology Development" is under development in Korea Atomic Energy Research Institute (KAERI) as on of the Mid-Term and Long-Term Nuclear R&D by MOST. To upgrade the productivity of the R&D during long period, system type project have been accomplished within plant period through schedule management by phase, outputs auditing, sharing and constructing database.

  • PDF