• 제목/요약/키워드: Long-term Heat Load

검색결과 44건 처리시간 0.035초

전력수급기본계획에 열병합발전 설비 반영 방법론의 개발 (The Development of Methodology in order to consider Combined Heat and Power in the Basic Plan of Long Term Electricity Supply & Demand)

  • 김용하;김미예;우성민;조성린;임현성
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권12호
    • /
    • pp.570-575
    • /
    • 2006
  • This paper develops methodology in order to consider CHP(Combined Heat and Power) capacity in the Basic Plan of Long Term Electricity Supply & Demand. We develop generating cost of CHP considering electric and heat. Also we develop mixed load duration curve which includes the electric load and heat load and then apply CHP capacity to SCM(Screening Curve Method) considering CHP feature. Accordingly, it decide the optimal CHP capacity in the Basic Plan of Long Term Electricity Supply & Demand. Also, We perform the sensitivity analysis according to cost variation.

브리넬 경도 표준 시험기 및 압입자국 자동 측정 장치의 장기 안정도 평가와 최적 시험조건에 관한 연구 (A Study on the Evaluation of Long Term Stability of Brinell Standard Hardness Tester and Automatic Indentation Measurement System and Optimum Test Condition)

  • 방건웅;탁내형;황농문
    • 열처리공학회지
    • /
    • 제13권1호
    • /
    • pp.10-15
    • /
    • 2000
  • Evaluation of long term stability of the Brinell standard hardness tester was carried out to secure its application as a national standard in Brinell hardness. Accuracy and repeatability in load application were tested through evaluating errors in hardness measurement of certified reference blocks. All of those requirements in KS as well as ISO specifications were satisfied by this standard hardness tester. In addition to this, long term stability test of automatic indentation measurement system was carried out. The scattering range was almost the same with its error range. To figure out an optimum test condition for better repeatability and long term stability, the effect of load variation, load application speed and time have been studied using orthogonal array experimental plan. It was found that the best combination is $30{\mu}m/s$ of load application speed and 25 seconds of load application time.

  • PDF

Analysis on short-term decay heat after shutdown during load-follow operation with seasonal and daily scenarios

  • Hwang, Dae Hee;Kim, Yonghee
    • Nuclear Engineering and Technology
    • /
    • 제54권10호
    • /
    • pp.3878-3887
    • /
    • 2022
  • For the future energy-mix policy for carbon neutrality, demand for the capability of load-follow operation has emerged in nuclear power plants in order to accommodate the intermittency of renewable energy. The short-term decay heat analysis is also required to evaluate the decay heat level varied by the power level change during the load-follow operation, which is a very important parameter in terms of short-term decay heat removal during a grace time. In this study, the short-term decay heat level for 10 days after the shutdown was evaluated for both seasonal and daily load-follow cases. Additionally, the nuclide-wise contribution to the accumulated decay heat for 10 days was analyzed for further understanding of the short-term decay heat behavior. The result showed that in the seasonal case, the decay heat level was mainly determined by the power level right before the shutdown and the amount of each nuclide was varied with the power variation due to the long variation interval of 90 days. Whereas, in the daily case, the decay heat level was strongly impacted by the average power level during operation and meaningful mass variations for those nuclides were not observed due to the short variation interval of 0.5 days.

공기 지중간 직접열교환시스템의 열성능 해석 (Analysis of the thermal performances of air-earth direct heat exchanger)

  • 김원갑;안정수;최영돈
    • 설비공학논문집
    • /
    • 제9권2호
    • /
    • pp.112-121
    • /
    • 1997
  • This study is focused on the development and selection of optimal cool tube system to maximize its thermal performance. Cool tube is devised to reduce the heating and cooling load of building by preheating or refreshing of intake air. Finite volume method was adopted to solve the conduction problem between the cool tube and earth. We examine the cool tube system for two operating periods, a short term(12 hours) and a long term(3 months). The results of short term operations reveal that condensation significantly influences and raises the exit air temperature. For long term operations, optimum conditions of cool tube system are obtained with variations of flow-rate, depth, length and diameter of cool tube.

  • PDF

공기 지중간 직접열교환시스템의 연중 열성능 해석 (Analysis on the thermal performances of air-earth direct heat exchanger in one year)

  • 김원갑;안정수;최영돈
    • 설비공학논문집
    • /
    • 제9권4호
    • /
    • pp.517-526
    • /
    • 1997
  • This study is focused on the development and selection of the optimal cool tube system to maximize its thermal performance. Cool tube is devised to reduce the heating and cooling load of building by preheating or refreshing of intake air with buried pipes. Finite volume method is adopted to solve the conduction problem between the cool tube and earth. We examine the cool tube system for two operating periods, a short term(12 hours) and a long term(3 months). The results of short term operations reveal that condensation significantly influences and raises the exit air temperature. For long term operations, optimum conditions of cool tube system are obtained with variations of flow-rate, depth, length and diameter of cool tube.

  • PDF

A SCENARIO STUDY ON MIXING STRATEGIES OF FAST REACTOR WITH LOW AND HIGH CONVERSION RATIOS

  • Jeong, Chang Joon;Jo, Chang Keun;Noh, Jae Man
    • Nuclear Engineering and Technology
    • /
    • 제45권3호
    • /
    • pp.367-376
    • /
    • 2013
  • This study investigated mixing scenarios of the low and high conversion ratios (CRs) of fast reactors (FRs). The fuel cycle was modeled so as to minimize the spent fuel (SF) or transuranics (TRU) inventories. The scenarios were modeled for a single low CR of 0.61 and a high CR of 1.0. The study also investigated the mixing scenario of low-high CR and/or high-low CR. The SF and TRU inventories, associated with different scenarios, were compared to those of the light water reactor (LWR) once-through (OT) case. Also, the important isotope concentration and long-term heat (LTH) load were calculated and compared to those of the OT cycle. As a result, it is known that the deployment of FRs of low CR burns more TRU and results in a reduction of the out-of-pile TRU inventory and LTH with low deployment capacity. This study shows that the mixing strategy of FRs of low and high CR can reduce the SF and TRU inventories with lower deployment capacity as compared with a single deployment of FRs of high CR.

전기기기의 발열을 고려한 다단계 가속열노화 방법 (Multi-phase Accelerating Test Method of Thermal Aging Considering Heat Generation of Electric Equipment)

  • 임병주;박창대;정경열
    • 한국유체기계학회 논문집
    • /
    • 제16권5호
    • /
    • pp.18-23
    • /
    • 2013
  • Thermal aging test is performed to qualify the life time of equipment in thermally aged condition. Due to long life time more than 10 years like as in power plant, the equipment is subjected to the accelerated thermal aging condition which is able to shorten the long aging test period by increasing aging temperature. Normally, conservatism of thermal aging test causes to impose unbalanced and excessive thermal load on components of the equipment, and deformation and damage problems of the components. Additionally, temperature rise of each component through heat generation of the electric equipment leads to long-term problem of the test period. Multi-phase accelerating aging test is to perform thermal aging test in multiple aging conditions after dividing into groups with various components of equipment. The groups might be classified considering various factors such as activation energy, temperature rise, glass transition temperature and melting temperature. In this study, we verify that the multi-phase accelerating aging test method can reduce and equalize the thermal over load of the components and shorten aging test time.

Low-grade waste heat recovery and repurposing to reduce the load on cooling towers

  • McLean, Shannon H.;Chenier, Jeff;Muinonen, Sari;Laamanen, Corey A.;Scott, John A.
    • Advances in Energy Research
    • /
    • 제7권2호
    • /
    • pp.147-166
    • /
    • 2020
  • Industrial cooling towers are often ageing infrastructure that is expensive to maintain and operate. A novel approach is introduced in which a heat pump circuit is incorporated to reduce the load upon the towers by extracting low-grade energy from the stream sent to the towers and repurposing in on-site processing operations. To demonstrate the concept, a model was constructed, which uses industrial data on cooling towers linked to a smelter's sulphuric acid plant, to allow direct economic and environmental impact comparison between different heat recovery and repurposing scenarios. The model's results showed that implementing a heat pump system would significantly decrease annual operating costs and achieve a payback period of 3 years. In addition, overall CO2 emissions could be reduced by 42% (430,000 kg/year) and a 5% heat load reduction on the cooling towers achieved. The concept is significant as the outcomes introduce a new way for energy intensive industrial sectors, such as mineral processing, to reduce energy consumption and improve long-term sustainable performance.

가혹조건에서의 태양전지모듈 내구성 평가를 통한 최적의 시험조건 제안 (Suggestion of Long-term Life Time Test for PV Module in Highly Stressed Conditions)

  • 김경수;강기환;유권종;윤순길
    • 한국태양에너지학회 논문집
    • /
    • 제30권5호
    • /
    • pp.63-68
    • /
    • 2010
  • To guarantee life time more than 20 years for manufacturer without stopping photovoltaic(PV) system, it is really important to test the module in realistic time and condition compared to outside weather. In here, we tested PV modules in highly stressed condition compared to IEC standards. In IEC 61215 and IEC 61646 standards, damp-heat, thermal cycle(TC200) and mechanical test are main test items for evaluating long-term durability of PV module in controlled temperature and humidity condition. So in this paper, we have lengthened the test time for TC200 and damp-heat test and increased the loading stress on surface of module. Through this test, we can get some clue of proper the method for measuring realistic life cycle of PV modules and suggested the minimum time for PV test method. The detail description is specified as the following paper.