Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project (장기계속계약공사의 공기연장 추가간접비 산정 개선방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.30-37
    • /
    • 2017
  • In Korea, additional indirect costs generated from the time period extension of public construction projects have been studied. Practical claims against such costs are increasing. There are no clear criteria for calculating the delay cost caused by the extension, and thus calculation methods differ across entities. Logical valid calculation methods have also not been researched. Further, there are no Korean studies on the additional indirect cost caused by a suspension in a public construction project on a long-term continuing contract. The purpose of this research is to propose a method of calculating the indirect cost incurred by construction time extension that reflects the characteristics of Korean public construction projects. The cost patterns generated during construction periods were analyzed, and then the current criteria of calculating the indirect costs caused by the extension were examined. Following this, actual conditions and practices in the field were surveyed and the current calculation method was applied to a model case to compare the actual cost and that determined from the current calculation method. Issues with the current method were identified by this comparison. Based on this, this research proposes a method of calculating the total actual cost caused by a suspension in a public construction project that is appropriate for calculating the additional indirect cost generated by a suspension in a public construction project on a long-term continuing contract.

Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines - (공공 건설사업의 효율적 건설사업관리수행을 위한 제도개선방안 - 총사업비관리지침을 중심으로 -)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.3-11
    • /
    • 2020
  • In large public construction projects with a certain size or larger that need to be carried out over a number of years, the Authority must secure a budget for construction project management activities by the construction manager. There is no problem if the project management budget secured by the issuing Authority and the project management budget executed by the issuing Authority are the same, but if not, various problems will arise. Therefore, in this study, the following measures were proposed to improve the system for efficient operation of construction project management: First, the construction project management terms and tasks specified in the statutes and the guidelines of government agencies should be unified and the standard for calculating consideration should be unified. Second, the total project cost management guideline should be specified so that the missing construction project manager can receive compensation for the technical proposal. Third, if the project cost is changed in the long-term continuous construction project, the construction project management expense should be adjusted accordingly. Fourth, if construction project management service is required from the Authority, the basis for consignment to a specialized institution should be specified in the total project cost management guideline.

Systematic Improvement for Effective Operation of Long-Term Continuous Construction Contracts (장기계속공사계약의 효율적 운영을 위한 제도 개선)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.3-10
    • /
    • 2019
  • The entire duration of the long-term continuous construction contract project cannot be expected when calculating the initial budget as the construction of the contract is carried out annually according to the budget composition. In addition, the statutes related to the defect liability and execution of contracts have not been established systematically in relation to the contract. Therefore, there are many problems at the actual construction site with regard to the defect liability or the performance of the contract in relation to the contract. In this study, the following improvement directions were presented for the efficient operation of the contracts: First, the defect liability is legal and should be specified in an Act rather than an enforcement decree. Second, if the parties to the contract vary in the following order in the contract, the special agreement should be specified in the enforcement decree. Third, in the event of an indirect cost due to the extension of the period of the long-term continuous work, the contingency items of the total project cost management policy should be utilized. Fourth, in the case of general construction contract conditions, clauses related to the purchase of the premium of the CAR, inspection, taking over, defect repair, and defect inspection shall be supplemented.

US-China Hegemony Competition and Gray-Zone Conflict in the Post-Coronavirus Era: Response strategies of the Korean Navy and Coast Guard (포스트 코로나시대 미중 패권경쟁과 회색지대갈등: 한국 해군·해경의 대응전략)

  • Lee, Shin-wha;Pyo, Kwang-min
    • Maritime Security
    • /
    • v.1 no.1
    • /
    • pp.149-173
    • /
    • 2020
  • While the United States and other Western states are in trouble with COVID-19 crisis, China is continuing its aggressive ocean expansion with its Gray-zone strategy. The Gray-zone strategy, which China uses around the South China Sea, refers to a strategy that promotes a change in international politics by creating an unclear state, neither war or peace. China, which is trying to expand its influence across East Asia, will also try to project a Gray zone strategy on the Korean Peninsula. The possible scenarios are as follows: 1) South Korea is accidentally involved in a dispute in the South China Sea, 2) Military conflicts between South Korea and China is caused by illegal fishing of Chinese boats in Yellow Sea, 3) China tries to interfere with Socotra Rock, 4) Unlikely, but possible in the future that China induce the military conflicts between Korea and Japan on the Dokdo issue. In order to cope with these scenarios, Korea should prepare the following measures from a long-term perspective: the creation of an Asian maritime safety fleet, the integ rated operation of the navy and the coast guard in the framework of the national fleet, and strengthening the conflict control system for China's provocations.

  • PDF

Analysis of the abroad and domestic research trends on climate change and its economical effect on the power plant (기후변화협약 시행에 따른 대응 방안 및 발전분야 영향 분석)

  • Woo, Kwangje;Hwang, Jae Dong;Jeong, Seok Yong;Jang, Gil Hong
    • Clean Technology
    • /
    • v.7 no.1
    • /
    • pp.43-49
    • /
    • 2001
  • To meet $CO_2$ emission regulation, this study describes the present state of $CO_2$ reduction technology and the effect of the regulation on power industry. In Japan, R&D investment is actively continuing through a long-term R&D project, along with trying to meet the reduction demand by the ways of energy saving and abroad business. EU has made a lot of investments in increasing the efficiency of power generation and developing alternative energy sources. The US is making provision of the portion of reduction by using energy saving program and emission trading, and the current DOE-driven program is addressing the development of cost-effective power systems. In the country, the research to reduce $CO_2$ emission has been mainly driven by the government and research institute supported by the government. Meanwhile, if the reduction obligation imposed on Portugal which is the least strict condition will be enforced in Korea, it is likely that about 50 running power plants should be stopped or shut down after 2015, in spite of voluntary reduction efforts such as conversion to clean fuels, etc. according to the government's long-term electric power need and supply plan.

  • PDF