• Title/Summary/Keyword: Long Railway Tunnel

Search Result 72, Processing Time 0.029 seconds

Hard rock TBM project in Eastern Korea

  • Jee, Warren W.
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2008.10a
    • /
    • pp.33-41
    • /
    • 2008
  • The longest tunnel has been halted at Daekwanryung by the failure of the host country of the Winter Olympiad in 2014, but modern High-Power TBM will come to Korea to excavate these long tunnels to establish the better horizontal connection between the western and eastern countries to improve the strong powerful logistic strategy of Korean peninsula. Train operation provides a key function of air movements in a long underground tunnel, and heat generation from transit vehicles may account of the most heat release to the ventilation and emergency systems. This paper indicates the optimal fire suppress services and safety provision for the long railway tunnel which is designed twin tunnel with length 22km in Gangwon province of Korea. The design of the fire-fighting systems and emergency were prepared by the operation of the famous long-railway tunnels as well as the severe lessons from the real fires in domestic and overseas experiences. Designers should concentrate the optimal solution for passenger's safety at the emergency state when tunnel fires, train crush accidents, derailment, and etc. The optimal fire-extinguishing facilities for long railway tunnels are presented for better safety of the comfortable operation in this hard rock tunnel of eastern mountains side of Korea. Since year 1900, hard rock tunnel construction has been launched for railway tunnels in Korea, tunnels have been built for various purposes not only for infrastructure tunnels including roadway, railway, subway, and but also for water and power supply, for deposit food, waste, and oils etc. Most favorable railway tunnel system was discussed in details; twin tunnels, distance of cross passage, ventilation systems, for the comfortable train operations in the future.

  • PDF

Estimation of Safety in Railway Tunnel by Using Quantitative Risk Assessment (QRA를 이용한 철도터널 방재 안전성 평가)

  • Kim, Do-Sik;Kim, Do-Hyung;Kim, Woo-Sung;Lee, Du-Hwa;Lee, Ho-Seok
    • Tunnel and Underground Space
    • /
    • v.16 no.5 s.64
    • /
    • pp.357-367
    • /
    • 2006
  • Recently, as the construction of new railway and the relocation of existing line increase, tunnel structures grow longer. The railway fire accidents in long tunnel bring large damages of human life and disaster. The interest of safety in long tunnel have a growing and the safety standard of long tunnel is tightening. For that reason, at the planning of long tunnel, the optimum design of safety facility in long tunnel for minimizing the risks and satisfying the safety standard is needed. For the reasonable design of long railway tunnel considering high safety, qualitative estimation for tunnel safety is required. In this study, QRA (Quantitative Risk Assessment) technique is applied to design of long railway tunnel for assuring the safety function and estimating the risk of safety. The case study for safety design in long railway tunnel is tarried out to verifying the QRA technique for two railway tunnels. Thus, the inclined and vertical shaft for escape way and safety facilities in long tunnel are planned, and the risks of tunnel safety for each case are estimated quantitatively.

A study on the estimation of safety in long railway tunnel (장대 철도터널에서의 방재 안전성 평가에 관한 연구)

  • Kim, Young-Geun;Kim, Dong-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.3
    • /
    • pp.287-298
    • /
    • 2007
  • Recently, as the construction of new railway and the relocation of existing line increase, tunnel structures get longer. The railway fire accidents in long tunnel bring large damages of human life and disaster. The interest on safety in long tunnel has been growing and the safety standard for long tunnels is tightening. For that reason, at the planning stage of a long tunnel, the optimum design of safety facility for minimizing the risks and satisfying the safety standard is required. For the reasonable design of a long railway tunnel considering high safety, qualitative estimation for tunnel safely is required. In this study, QRA (Quantitative Risk Analysis) technique is applied to design of a long railway tunnel for assuring the safety function and estimating the risk of safety. The case study for safety design was carried out to verify the QRA technique for two railway tunnels.

  • PDF

Study for Catenary System in High Speed Railway Long Tunnel applied UIC Standard (UIC 규격을 적용한 고속철도 장대터널구간의 전차선로 검토)

  • Ahn, Young-Hoon;Song, Jin-Ho
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1924-1929
    • /
    • 2010
  • In long tunnel If we reduce the length of system height on catenary system, tunnel construction cost is cut down. It is because of tunnel section curtailment. So that we have review reduction of system height according to tunnel section. We have designed reduction of system height considered characteristics of overhead contact systems within UIC 799 code.

  • PDF

A Study of Proper Space between the Escape Tunnels in the Long Railway Tunnel (철도장대터널의 대피통로 최적간격에 관한 연구)

  • Kim Dong Gi;Park Byung Eun;Rha Sang Ju;Park Jong Kwaun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.880-885
    • /
    • 2004
  • When a fire takes place, the escape tunnel which could prevent passengers and the crew from disasters would be most important facility among railway tunnel facilities for prevention of disaster. A shorter space between the escape tunnels is much better for safety because of short escape time. The establishment of short space escape tunnels(driftways) in the single track parallel tunnel is much easier. The establishment of long space escape tunnels(inclined shafts, vertical shafts) in the double track is much more advantageous economically. We, therefore, compared the movement time of smog originated from fire with the escape time of the crew and passengers for setting up the best space between the escape tunnels in the double track tunnel. We could calculate the best space between the escape tunnels in the double track tunnel properly by computer simulation.

  • PDF

A Study on the Principal Factors of Rail Tunnel Cross-Section Design due to High Speed (고속화에 따른 철도터널의 단면규모 결정요소에 대한 고찰)

  • Ryu, Dong-Hun;Lee, Hyeon-Jeong;Han, Sang-Yeon;Shin, Hyon-Il;Jung, Byung-Ryul;Song, Chung-Ryul
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1487-1501
    • /
    • 2011
  • Recently, fast-growing up railway transportations. Because, regional traffic congestion problem solving and a period of rapid expansion to meet the demand of industries. In addition the government also suggest to new paradigm for the future 'Low Carbon, Green Growth' is presented as a new national vision. To meet the social needs and the time demands, Last of the railway increase very long tunnels and huge deep tunnels. Especially this trend accelerated high speed up in the tunnel, the revision of design criteria and research challenges are being actively improved. Mainly in the tunnel cross-section was under the control of the vehicle train speed 150km/hr by the construction of the vehicle cross-section of the tunnel. More than 200km/hr rail tunnel depending on the vehicle's speed caused the tunnel to the pressure fluctuations will be governed by the aerodynamic changes. Considering the economy to ensure the optimum cross-section of the railway tunnel to the description scheme is selected cross-section of the railway tunnel to determine the size domestic or international railway tunnel for the elements((based on fast Algorithm design criteria, the center line spacing, streetcar line, cross-sectional shape, sectoral issues, such as interface and aerodynamics) based on design practices and to review results. In this study, to propose guidelines depending on the size of a railway tunnel cross section for the size of the determining reasonable factors when designing the railway tunnel and cost-effective standards guidelines.

  • PDF

Development of Railway Tunnel Fire Risk Assessment Program and its Application (철도터널 화재 위험도 평가 프로그램의 개발 및 적용사례)

  • Yoon, Sungwook;Park, Jong-heoun
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.1
    • /
    • pp.57-64
    • /
    • 2009
  • With the increase in construction of long railway tunnel, social interest in the railway tunnel fire risk has also increased. However, quantitative fire risk research on this topic is still lacking, especially in terms of consideration of uncertainty of each variables used in risk analysis. Hence, in this study, to improve the overall performance of fire risk analysis technique for railway tunnel, Monte-Carlo simulation method is added to the traditional probabilistic risk analysis based on event tree approach and its validity is investigated by applying it to the real railway tunnel project.

  • PDF

Seismic applicability of a long-span railway concrete upper-deck arch bridge with CFST rigid skeleton rib

  • Shao, Changjiang;Ju, Jiann-wen Woody;Han, Guoqing;Qian, Yongjiu
    • Structural Engineering and Mechanics
    • /
    • v.61 no.5
    • /
    • pp.645-655
    • /
    • 2017
  • To determine the seismic applicability of a long-span railway concrete upper-deck arch bridge with concrete-filled steel-tube (CFST) rigid skeleton ribs, some fundamental principles and seismic approaches for long-span bridges are investigated to update the design methods in the current Code for Seismic Design of Railway Engineering of China. Ductile and mixed isolation design are investigated respectively to compare the structural seismic performances. The flexural moment and plastic rotation demands and capacities are quantified to assess the seismic status of the ductile components. A kind of triple friction pendulum (TFP) system and lead-plug rubber bearing are applied simultaneously to regularize the structural seismic demands. The numerical analysis shows that the current ductile layout with continuous rigid frame approaching spans should be strengthened to satisfy the demands of rare earthquakes. However, the mixed isolation design embodies excellent seismic performances for the continuous girder approaching span of this railway arch bridge.

Calculation of the Normal Operation Rate of Monitoring Hardware in the Long Tunnels of High-Speed and Urban Railways (고속 철도와 도시철도 장대터널 계측기기의 정상 작동율 산정 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.1
    • /
    • pp.80-90
    • /
    • 2022
  • Purpose: The objective of this study was to improve smart monitoring and monitoring management technology in long tunnels by investigating and analyzing the normal operation rates of monitoring hardware in the long tunnels of high-speed and urban railways. Method: This study evaluated, analyzed, and compared the normal operation rate of 6-8 types of monitoring hardware for each long tunnel, targeting three high-speed railway lines with a long tunnel (i.e., Suseo-Pyeongtaek Line, Gyeongbu Line, and Honam Line) and two urban railway groups with a long tunnel (i.e., Seoul Metro Lines 5, 6, and 7, and 9). Result: The rank of the normal operation rate of monitoring hardware was in the order of Suseo-Pyeongtaek High-Speed Railway (92.1%), Seoul Metro Lines 5, 6, and 7 (85.8%), Seoul Metro Line 9 (85.2%), Gyeongbu High-speed Railway (80.5%), and Honam High-speed Railway (46.7%). Conclusion: The mean normal operation rate of the monitoring hardware in the three high-speed railway long tunnels was 83.4%, and that of the two urban railway long tunnels was 85.5%, indicating that the deviation between them was small. The mean normal operation rate of the monitoring hardware in the long tunnels of the five high-speed and urban railway lines was 84.2%.

The study on the operation of fire fighting vehicle for a long railway tunnel (장대터널용 소방차량의 운용에 관한 연구)

  • Kwon, Tae-Soon;Park, Won-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.5
    • /
    • pp.516-521
    • /
    • 2016
  • In this study, we investigated the operation of railroad fire fighting vehicles against fires on trains in a long railway tunnel. In recent years, long railway tunnels (more than 10 km in length) have been built and the number of such tunnels, such as the Geumjeong tunnel (20.3 km in length) on the Gyeongbu high speed line, Solan tunnel (16.7 km in length) on the Yeongdong line and Yulhyeon tunnel (50.3 km in length) on the Suseo high speed line which is scheduled to be opened in the second half of 2016, is increasing. Significant damage is to be expected, due to the increased evacuation time and limited accessibility of fire services when the train is stopped by an urgent fire in the tunnel. Special fire fighting vehicles capable of running on rails have been developed and operated in overseas advanced countries. Therefore, a fire-response system using Unimog vehicles, which can run on road and rail, instead of road vehicles, is necessary. The characteristics of the railway tunnel and thermal environmental change caused by a train fire in a tunnel were analyzed in this study. Also, the operational requirements of the railroad fire fighting vehicles were evaluated by taking into account the specifications of the railroad fire fighting vehicles under development.