• Title/Summary/Keyword: Local Construction Planning Stage

Search Result 30, Processing Time 0.024 seconds

A Study on the Prediction of the Construction Cost in Planning Stage of Local Housing Union Project (지역주택조합사업 기획단계의 공사비 예측에 관한 연구)

  • Lee, Jin-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.653-659
    • /
    • 2018
  • The accurate prediction of construction cost is a key factor in a project's success. However, it is hard to predict the construction costs in the planning stages rapidly and precisely when drawings, specifications, construction cost calculation statements are incomplete, among other factors. Accurate construction-cost prediction in the planning stage of a project is also important for project feasibility studies and successful completion. Therefore, various techniques have been applied to accurately predict construction costs at an early stage when project information is limited. There are many factors that affect the construction cost prediction. This paper presents a construction-cost prediction method as multiple regression model with seven construction factors as independent variables. The method was used to predict the construction cost of a local housing union project, and the error rate was 4.87%. It is not possible to compare the cost of the project at the planning stage of the local housing union project, but it has high prediction accuracy compared to the unit price of an existing unit area. It is likely to be applied in construction-cost calculation work and to contribute to the establishment of the budget for the local housing union project.

Convergence Analysis on Policy Decision Making Factor of Local Construction Planning Phase by Using Unstructured Data in point of the Technology and Culture (비정형 데이터 분석을 통한 기술과 문화의 융합적 관점의 지역 건설기획단계 정책의사결정 영향요인 분석)

  • Park, Eun Soo;Kim, Ji Eun
    • Korea Science and Art Forum
    • /
    • v.23
    • /
    • pp.149-162
    • /
    • 2016
  • Here are background, method, scope, main contents of this research. As the interests increased in recent about the construction in complex and diverse areas, construction is locally connected to human life like to coexistence of the technology and culture. The local development should not be fragmentary construction to improve local recycling ability. Local society should be inherited by modern cultural perspective through a variety of local culture and coexistence. Effective decision making analysis is necessary to build a livable area with a combination of high-tech industry. For this reason, this paper will study the political analysis for decision making at the planning stage of construction in point of fusion of technology and culture by using unstructured data analysis. Conclusion is as in the following. Local planning stage of construction describes diverse meanings of intangible and intangible factors as political factor. Technology factors have various qualitative and quantitative factors in construction field. Understanding decision making at the planning stage of construction means not only visible 'technology factor' such as structure, method, shape, and so on, but also invisible 'culture factor' such as spirit of age, religion, learning, and life-style reflected in formation process of space, and insight of brain power about art.

A Study on Improving Ubiquitous Strategy Planning for Local Governments (지자체 U-도시계획 수립방법 개선에 관한 연구)

  • Kim, Myong-Dong;Park, Kwang-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.4
    • /
    • pp.45-58
    • /
    • 2013
  • Korean local governments have been planning for u-City construction with great efforts. Such efforts are needed in order to reflect the urban characteristics of each city, to promote local economic growth, and to have a sustainable operation model. Thus it is critical at an earlier stage to set a strategic direction based on urban environment analysis, which will lead to a feasible implementation of u-City. This paper derives issues and suggests improvement methods based on a case study on the USPs (u-City Strategy Planning's) of ten local governments. It is expected that the improvement methods will greatly reduce risks involved in u-City construction and contribute to better provided local-specific u-services.

Development of a Calculating Model for Local Index Based on Historical Data of Public Apartment Buildings (공공아파트 실적데이터 기반의 지역지수 산정 모델 개발)

  • Lim, Dae-Hee;Lee, Seung-Hoon;Seo, Yong-Chil
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.75-80
    • /
    • 2010
  • With the intensifying of price competition and structural diversifications, the uncertainty of the domestic housing market has been increased. This highlights the importance of the planning stage of construction projects, and the increased need for a higher level of accuracy in approximate estimates. Currently, a number of research and development programs to calculate construction cost at the initial planning stage are being conducted. However, there are few cases in which local characteristics are considered in deriving the results. If local calibration can be conducted during estimates, more accurate cost estimates will be enabled. This could also play a major role in ensuring the success of a project. Therefore, the purpose of this research is to develop a calculation methodology and a model for a local index based on the historical data of public apartment buildings, and to derive a local index that supports accurate construction cost estimates.

Master Plan for Jeju Sanghyo Botanical Garden using local landscape resources (지역경관자원을 활용한 제주상효식물원 계획)

  • Park, Eun-Yeong;Yoo, Byung-Rim
    • Journal of Korean Society of Rural Planning
    • /
    • v.15 no.4
    • /
    • pp.173-182
    • /
    • 2009
  • This study is a plan for the Jeju Sanghyo Botanical Garden construction, and it is prepared to maintain the identity of the local landscape by composing the garden using the local landscape resources. The goals of becoming one of world's best, garden centered botanical garden and at the same time one that represents culture of Jeju. Unusual species are included in the collection and with the general collection, special collection and exhibition by different kinds are planned to be offered to the public. The garden will demonstrate the world's various types of gardens in a compressed way. It is our endeavor to become center of culture beyond plant education and exhibition, drawing a large number of people to our garden. Moreover, conservation of Jeju's unique botanic resources will be carried out and the garden will show the garden culture. Due to the size of the site, different themes will be exhibited in one zone in a parallel. Unique combination of each local landscape resource will create own theme. The display will be divided into three different stages: the 1st stage is an educational exhibition, assisting more understanding of distinguishing different locations, the second is exhibition by various species and the final stage will show an ideal way to develop a garden with harmony of various plant species.

The global standard realizing process of the Tire Production Facility and Process Line

  • Suzuki, Takeshi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.28-29
    • /
    • 2015
  • The tire production facility is a large-scale construction with the complexity of a manufacturing process. The process utilities should be wide-ranging as an effective arrangement of them is highly important. All the necessary information should be clarified together with the manufacturer at the basic planning stage, and this design should be developed to comply with the local culture and regulations. It is important to carry out more advanced engineering in terms of process, cost and quality, even if it is difficult to standardize due to the cultural and geographical conditions and regulations. The key point is to reflect all the given conditions and make a clear design during the design stage, to eliminate the problems after the construction has begun. Another key point is the delivery system, which must be totally managed from the initial design stage until the construction stage by proven companies. Flexibility, quick action, and single responsibility will be the fundamental features in all the steps of the project.

  • PDF

Guidelines for the Establishment and Vitalization Scheme on Facility of Nature Environmental Conservation and its Utilization (자연환경보전·이용시설 가이드라인 및 활성화방안)

  • Choi, Jaeyong;Park, Sohyun;Lee, Dong Kun;Shin, Kyungjoon;Hong, Taesik
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.9 no.4
    • /
    • pp.36-51
    • /
    • 2006
  • Although the demand and necessity for the facilities of nature environmental conservation and its utilization have been increased recently, the local governments has been experiencing difficulties to launch the facilities since there are no confirmed principles or guidelines for the direction of the facility and distinctions from the ordinary parks. In this regard, the aim of this paper is to provide the overall framework for establishing the facility by equipping checklists from planning to operational stage. The stages are disengaged into 5 steps of siting feasibility, planning, preliminary environmental assessment and environmental impact assessment, design, construction, and operation. This paper also include the recommendations to vitalize the existing facilities, of which expansion of educational program development; utilization of various manpower; provision of appropriate settings; strengthened monitoring; and increased public relations. Furthermore, it is suggested to consider the strengthened local characteristics, reviewing management plan at the stage of applying a new facility establishment to the concerned authority, fostering experts, and expansion of the facilities through restoration of environmentally damaged areas for a new facility.

기획단계에서의 최적 개산견적산정의 방법론 고찰

  • Kim Chan-Joong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.120-125
    • /
    • 2003
  • The estimated construction costs derived at the Planning stage of a project are utilized as important data determining the feasibility of overall project. Therefore the clients usually expect to have estimations of the construction cost as precise as possible and there has been extensive studies carried out by the cost specialists worldwide to satisfy this client's specific need whereas the local estimators still heavily rely on producing quantities and detail quotations only. This paper is to introduce a case study where elemental/functional area cost analysis is incorporated into a database system for the improved accuracy in cost estimations.

  • PDF

The Study on the Establishment of Rural Community Facility Remodeling and Management Process (농촌마을 공동시설 리모델링 및 관리 프로세스 구축에 관한 연구)

  • Kim, Sang-Bum;Shin, Jae-Sun;Kim, Eun-Ja
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.17 no.3
    • /
    • pp.63-70
    • /
    • 2015
  • Recently, the rural village development projects are proceeding as enhancement of the rural landscape as the interest toward rural tourism and rural immigrant has increased. However, the projects are solely to support construction of community space and there has been a lack of community facility remodeling in term of both deterioration facilities and abandoned facilities. Thus in this study proposes rural community facility remodeling process to utilize remodeling of rural deterioration facilities and abandoned facilities. For setting rural community remodeling process, this study analysed preceding research data and suggested rural community remodeling process stage ; planning, spacial resolution, remodeling factor analysis, implementation, maintenance control, based on research data. For systematic performed this process, this study regulated role of local resident, expert and local government on remodeling process stage.

"Standard Model" approach to building projects in the UK and potential role of project team to mitigate any local difference~from international developer's perspective

  • Tanaka, Koji
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.425-432
    • /
    • 2020
  • In order to improve the sustainability and smart construction, it is discussed arguably that developing and applying consistent "standard model" to plan business, design, construct and operate a building is considered to be one of the effective and efficient approach. The scope of this article is to examine, from the international developer's perspective, the "standard model" approach of a hotel brand to building projects in the UK, and also to explore potential role of project team to mitigate any local difference at the project level. These projects are developed by the same developer adopting the same business plan, design and operation to each project. In order to clarify the actual and likely difference in construction results, reference is also made to those building projects located in other geographical markets including Japan, Germany and USA, and focus is given on the analysis of its programme and cost. Principle findings are that there exists geographical difference especially in environmental and planning system, and that major local difference is found at least in the programme at the design stage. In contrast, the difference in the building cost itself may not be necessarily considered major if currency exchange rate being taken into account appropriately. It is also observed that there were cases where any difference in the programme was mitigated by taking different approach to procuring and defining roles of management and professional team at the project level. In conclusion, from the international developer's perspective, the geographical difference of the "construction system" surrounding building projects can typically lead to major prolongation of programme, however, these different construction results could be mitigated at least to a certain extent by introducing appropriate changes to the role of project team.

  • PDF