• Title/Summary/Keyword: Load-frequency control

Search Result 794, Processing Time 0.029 seconds

Simulator for 3 Phase Induction Motor with LCL Filter and PWM Rectifier (LCL 필터와 PWM 정류기를 이용한 3상 유도전동기의 시뮬레이터)

  • Cho, Kwan Yuhl;Kim, Hag Wone
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.861-869
    • /
    • 2020
  • A dynamo set for a high-power induction motor drive is expensive and needs a long time to manufacture. Therefore, the development of a simulator that functions as the induction motor and load equipment is required. A load simulator of an inverter for a high-power three-phase induction motor consists of a reactor and three-phase PWM inverter. Therefore, it cannot simulate the dynamic characteristics of an induction motor and functions only as a load. In this paper, a real-time simulator is proposed to simulate a model of an induction motor and the load characteristics based on an LCL filter and three-phase PWM rectifier for a three-phase induction motor. The currents of a PWM inverter that simulate the stator currents of the motor are controlled by the inductor currents and capacitor voltages of the LCL filter. The capacitor voltages of the LCL filter simulate the induced voltages in the stator windings by the rotating rotor fluxes of the motor, and the capacitor voltages are controlled by the inductor currents and a PWM rectifier. The rotor currents, the stator and rotor flux linkages, the electromagnetic torque, the slip frequency, and the rotor speed are derived from the inverter currents and the motor parameters. The electrical and mechanical model characteristics and the operation of vector control were verified by MATLAB/Simulink simulation.

A study on improving fairness and congestion control of DQDB using buffer threshold value (버퍼의 문턱치값을 이용한 DQDB망의 공평성 개선 및 혼잡 제어에 관한 연구)

  • 고성현;조진교
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.22 no.4
    • /
    • pp.618-636
    • /
    • 1997
  • DQDB(Distributed Queue Dual Bus) protocol, the IEEE 802.6 standard protocol for metropolitan area networks, does not fully take advantage of the capabilities of dual bus architecture. Although fairness in bandwidth distribution among nodes is improved when using so called the bandwidth balancing mechanism, the protocol requires a considerable amount of time to adjust to changes in the network load. Additionally, the bandwidth balancing mechanism leaves a portion of the available bandwidth unused. In a high-speed backbone network, each node may act as a bridge/ router which connects several LANs as well as hosts. However, Because the existence of high speed LANs becomes commonplace, the congestionmay occur on a node because of the limitation on access rate to the backbone network and on available buffer spaces. to release the congestion, it is desirable to install some congestion control algorithm in the node. In this paper, we propose an efficient congestion control mechanism and fair and waster-free MAC protocol for dual bus network. In this protocol, all the buffers in the network can be shared in such a way that the transmission rate of each node can be set proportional to its load. In other words, a heavily loaded node obtains a larger bandwidth to send the sements so tht the congestion can be avoided while the uncongested nodes slow down their transmission rate and store the incoming segments into thier buffers. this implies that the buffers on the network can be shared dynamically. Simulation results show that the proposed probotol significantly reduces the segment queueing delay of a heavily loaded node and segment loss rate when compared with original DQDB. And it enables an attractive high throughput in the backbone network. Because in the proposed protocol, each node does not send a requet by the segment but send a request one time in the meaning of having segments, the frequency of sending requests is very low in the proposed protocol. so the proposed protocol signigificantly reduces the segment queuing dely. and In the proposed protocol, each node uses bandwidth in proportion to its load. so In case of limitation of available buffer spaces, the proposed protocol reduces segment loss rate of a heavily loaded node. Bandwidth balancing DQDB requires the wastage of bandwidth to be fair bandwidth allocation. But the proposed DQDB MAC protocol enables fair bandwidth without wasting bandwidth by using bandwidth one after another among active nodes.

  • PDF

A Inverter Control System for Vertical Circulation Parking Facility (수직순환식 입체주차설비용 인버터 제어시스템)

  • Choi, Chul;Lee, Jin-Ha;Kim, Chul-Woo
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.9 no.3
    • /
    • pp.294-302
    • /
    • 2004
  • In this study, we developed the inverter system to control Induction motor for the vertically circulation parking facility. In the case of calling a pallet, a car parking space, we basically stoned conventional system's problems, pallet is uncontrollable to the fixed position and braking system was worn by forcer braking with remaining speed. Also, by appling to converter controller, added to power regenerative control function, we confirmed the reduce of power supply capacity and the energy saving effect according to increasing operation frequency. The validity of this system is verified by 55kw induction motor driving system. Via this study, the proposed system shows the efficient use of parking facility and good operation characteristics by implementing position and speed control effectively on condition of load and shows energy saying effect by power factor control for the vertically circulation parking facility operation.

400mA Current-Mode DC-DC Converter for Mobile Multimedia Application (휴대용 멀티미디어 기기를 위한 400mA급 전류 방식 DC-DC 컨버터)

  • Heo, Dong-Hun;Nam, Hyun-Seok;Lee, Min-Woo;Ahn, Young-Kook;Roh, Jeong-Jin
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.45 no.8
    • /
    • pp.24-31
    • /
    • 2008
  • Power converters are becoming an essential block in modem mobile multimedia application. This paper presents a high performance DC-DC buck converter for mobile applications. Controller of DC-DC buck converter is designed by current-mode control method. An current-mode DC-DC converter is implemented in a standard $0.18{\mu}m$ CMOS process, and the overall die size was $1.2mm^2$. The peak efficiency was 86 % with a switching frequency of $1\sim1.5MHz$ and a maximum load current of 400mA.

Development of an Interactive Graphic Software for the Education and Training of Power System Operation and Control (전력계통 운용 및 제어에 대한 교육 및 훈련용 대화식 그래픽 소프트웨어 개발)

  • Shin, Joong-Rin;Lee, Wook-Hwa
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.48 no.8
    • /
    • pp.932-940
    • /
    • 1999
  • This paper discusses the development of an interactive and graphic software for the education and training of power system operation and control, especially for students and beginners. This software has a lot of functions for users to simulate the power system operation and control with ease. These functions included in this software are followings. First, this software includes a Graphic User Interface (GUI) - which contains interactive simulation scheme, Windows dialog box, graphic representations, and graphic icons - so that users can handle the software in user-friendly environments. Second, it uses a graphic editor so that users can easily edit the one-line diagram of the power system. Third, it prepares a database system so that users can manage the power system data for simulation easily. Fourth, the application modules included in the software are the Economic Dispatch (ED) and the Automatic Load-Frequency Control (ALFC). These application modules are designed as independent modules. Using the ED module, users can understand the basic concepts of the ED with ease. And using the ALFC module, they can easily acquire the basic understanding of the response of the ALFC between the two-area systems. The proposed software is tested on both the 16 bus and the two-area sample system. The test has confirmed the functions of the developed software. It is anticipated that the software will be useful for the education and training of power system operation and control for the power engineering study at university or for the training of the beginner at power industry.

  • PDF

Suggestion of Logic to Control Power Plant Equipped ESS in case of Full Open Turbine Control Valve (ESS를 이용한 발전소 터빈제어밸브 전개 운전 제어로직 제안)

  • In Young Chung;Jae-Heon Lee
    • Plant Journal
    • /
    • v.18 no.4
    • /
    • pp.66-72
    • /
    • 2023
  • In order to respond to the demand for flexible operation of thermal power generation, development of natural sliding pressure operation that minimizes throttle loss by opening the turbine control valve 100% and maximize power generation efficiency in conjunction with ESS in order to quickly respond to fluctuations in the system frequency is required. The logic development of natural sliding pressure operation with ESS was developed to modify the existing logic at the power plant's top-level control logic such as the unit master, the boiler master and the turbine master. Cooperative control algorithms that complement the advantages and disadvantages of ESS operation (quick response, limited capacity) and power plant operation (slow response, continuous operation) not only improve efficiency when applied to actual power plants, but also respond quickly and flexibly to load demands to ensure system stability.

  • PDF

Simulation Methods Development for a Plant Unit Master Control Logic Using Simulink in MATLAB (매트랩 시뮬링크를 이용한 플랜트 유닛마스터 제어로직 시뮬레이션 기법 개발)

  • Yoon, Changsun;Hong, Yeon-Chan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.2
    • /
    • pp.324-334
    • /
    • 2017
  • The simulators for a plant unit master control (UMC) developed by domestic or overseas researchers have been developed for operator-training purposes. UMC simulators normally constructed at the end of the plant construction, despite the UMC logics, should be simulated to pre-check many signal interfaces within the power generation systems. Because of the differences in construction schedule, it is difficult for logic designers or commissioning engineers to simulate the UMC logic during the design or commissioning stage. In this background, this paper proposes a simulation method that can be used easily by plant logic designers or operators in the MATLAB Simulink programming environment. The core of the UMC is realized with a unique simulation algorithm based on mathematical analysis and functional blocks combination. In addition, an integer-based configuration was proposed to realize the plant target value control for the equipment in the logic. With these simulation methods, functions, e.g., load distribution, high-low limitations, frequency compensation, etc. were simulated. The results showed that the plant UMC logic can be simulated in Simulink without a plant simulator. The various functions proposed in this paper can provide useful information about Simulink-based simulation design for plant logic designers or commissioning engineers during the power plant construction period.

Characteristics of bridge task in Korean coastal large trawler (우리나라 근해 대형트롤 어선의 선교업무 특성)

  • Kim, Min-Son;Shin, Hyeon-Ok;Lee, Ju-Hee;Hwang, Bo-Kyu
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.49 no.3
    • /
    • pp.301-310
    • /
    • 2013
  • To suggest a standard concerning with the arrangement of bridge equipment, the authors conducted the video observations with 3CCD (charge coupled device) cameras installed on the ceil of the bridge for monitoring the working activities of two bridge teams (the skipper/mate1 and the skipper/mate2) in a Korean coastal large trawler(gross tonnage: 139) for five days from July 30th. 2010 and analyzed of the data. Work elements coded by the work activities were input on the sheet of work analysis by the time unit of 1 sec according to the time occurred. A single work element among the work activities for every 5 minutes was denoted as the number of occurrence. The frequency of equipment usage was limited only in the usage of the equipment. In the case of the navigation and the towing net two ranks were integrated and analyzed. On the other hand, in the case of the casting net and the hauling net, two processes were integrated to as one and then analyzed separately as two ranks. As the results, 15 elements of work was carried out between two bridge teams for the observation; lookout, radar, GPS plotter, fish finder, net monitor, fishing deck, RPM indicator, rudder angle indicator, compass card, for maneuver; steering, ship speed control, trawl winch operation and external communications, paper works and others. It was found that the work load of the skipper per 5 minutes accordance with the navigation, the casting net, the towing net and the hauling net are 20.5 times, 11.9 times, 38.0 times and 9.5 times respectively, the mates are 65.2 times, 66.5 times, 85.7 times and 59.1 times respectively. The radar was shown the highest frequency of the equipment usage and the next was the fish finder, the GPS plotter and the external communications in the case of the navigation. In the case of the towing net the frequency of usage was high the ranking as the radar, the net monitor, the fish finder, the GPS plotter, the steering system and the external communications. In the case of the integrated process both of the casting and hauling net the trawl winch was shown the highest frequency to the skipper and the next was the GPS plotter and the radar, and the steering system was shown the highest frequency to the mate and the next was the radar, the ship speed control system, the GPS plotter, the net monitor and the fish finder.

Power Quality Impacts of an Electric Arc Furnace and Its Compensation

  • Esfandiari Ahmad;Parniani Mostafa;Mokhtari Hossein
    • Journal of Electrical Engineering and Technology
    • /
    • v.1 no.2
    • /
    • pp.153-160
    • /
    • 2006
  • This paper presents a new compensating system, which consists of a shunt active filter and passive components for mitigating voltage and current disturbances arising from an Electric Arc Furnace (EAF). A novel control strategy is presented for the shunt active filter. An extended method based on instantaneous power theory in a rotating reference frame is developed for extraction of compensating signals. Since voltages at the point of common coupling contain low frequency interharmonics, conventional methods cannot be used for dc voltage regulation. Therefore, a new method is introduced for this purpose. The passive components limit the fast variations of load currents and mitigate voltage notching at the Point of Common Coupling (PCC). A three-phase electric arc furnace model is used to show power quality improvement through reactive power and harmonic compensation by a shunt active filter using the proposed control method. The system performance is investigated by simulation, which shows improvement in power quality indices such as flicker severity index.

Development and Performance Test Results of a Segmented Scissors Type Switch for the Urban Maglev (도시형 자기부상열차 시저스분기기 개발현황과 성능시험결과)

  • Lee, Jong-Min;Park, Doh-Young;Han, Hyung-Suk;Kim, Chang-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3180-3186
    • /
    • 2011
  • A segmented scissors type switch has been developed for the urban transit maglev demonstration line to be commercialized near Incheon International Airport in 2013. Based on the design of the previous segmented 3-way switch, the scissors switch is composed of four segmented 2-way switches up/down and left/right and a turn table in the mid point. The main function of the scissors switch is to change the running direction of the train at end terminals. The developed scissors switch is planned to be installed in front of the 102 station, which has a side platform, of the demonstration line. The total length of the switch is 65m and the distance between the up and down track centerlines is 6m. The 2-way switches and turn table are made of steel box type beams, and have their own driving unit, locking unit, control unit, levitation and propulsion rails, and so on. Installed in the factory, a 100,000-cycle continuous operation test was carried out after manual and automatic test operations. The applicapability of the developed switch was verified through the measurements of the linearity of the track after repetitive operations, the mechanical operation noise, the load of the main driving motor, the safety of the control panel, the natural frequency of the girder, the deformation of the girder, and so on.

  • PDF