• Title/Summary/Keyword: Load duration curve(LDC)

Search Result 43, Processing Time 0.017 seconds

A Study on Development of Management Targets and Evaluation of Target Achievement for Non-point Source Pollution Management in Saemangeum Watershed (새만금 비점오염원 관리지역에서의 목표설정 및 달성도 평가방법론 연구)

  • Kim, Eun-Jung;Park, Bae-Kyung;Kim, Yong-Seok;Rhew, Doug-Hee;Jung, Kwang-Wook
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.37 no.8
    • /
    • pp.480-491
    • /
    • 2015
  • In this study, methods using LDC (Load Duration Curve) and watershed model were suggested to develope management targets and evaluate target achievement for non-point source pollution management considering watershed and runoff characteristics and possibility for achievement of target. These methods were applied for Saemangeum watershed which was designated as nonpoint source pollution management area recently. Flow duration interval of 5 to 40% was selected as flow range for management considering runoff characteristics and TP was selected as indicator for management. Management targets were developed based on scenarios for non-point source pollutant reduction of management priority areas using LDC method and HSPF model which was calibrated using 4 years data (2009~2012). In the scenario of LID, road sweeping and 50% reduction in CSOs and untreated sewage at Jeonju A20 and 30% reduction in fertilizer and 50% in livestock NPS at Mankyung C03, Dongjin A14 and KobuA14, management targets for Mangyung bridge, Dongjin bridge, Jeonju stream and Gunpo bridge were developed as TP 0.38, 0.18, 0.64 and 0.16 mg/L respectively. When TP loads at the target stations were assumed to have been reduced by a certain percentage (10%), management targets for those target stations were developed as TP 0.35, 0.17, 0.60 and 0.15 mg/L respectively. The result of this study is expected to be used as reference material for management master plan, implementation plan and implementation assessment for non-point source management area.

Analysis of the Implementation Effect of Total Water Load Management System Using Load Duration Curves in Sapgyo Watershed (부하지속곡선을 이용한 삽교천 유역의 오염총량관리제도 시행효과 분석)

  • Lee, Eunjeong;Kim, Taegeun
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.6
    • /
    • pp.536-548
    • /
    • 2019
  • In order to quantify the effect of the newly established the Total Water Load Management System in Sapgyo watershed, this study predicted the achievement of the target water quality at each unit watershed and the water quality according to the flow section. The HSPF model, which is the watershed runoff model, was constructed and operated based on 2015, and the water quality was predicted by inputting the loads in final target year(2030). The Load Duration Curve (LDC) was created using the simulated results of base year and target year. As a result of plotting water quality by flow conditions, it was simulated to be close to the BOD target with a difference of 0.1 ~ 0.2 mg/L in all three watersheds during the mid-range flow interval (40 ~ 60%). In case of T-P, although the target water quality was not set, the water quality was improved by Cheonan A 46%, Kokgyo A 29% and Namwon A 25%. The Muhan and Sapgyo river basins meet the target grade of middle-watershed standards. The improvement effect will be positive, as water quality, which achieves the target of Total Load Management System and the target grade of the middle-watershed standards will be expected to flow into the Sapgyo lake.

Enhancement and Application of SWAT Auto-Calibration using Korean Ministry of Environment 8-Day Interval Flow/Water Quality data (환경부 8일 유량.수질 자료를 이용한 SWAT 자동보정 모듈 개선 및 적용 평가)

  • Kang, Hyunwoo;Ryu, Jichul;Kang, Hyungsik;Choi, Jaewan;Moon, Jongpil;Choi, Joongdae;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.2
    • /
    • pp.247-254
    • /
    • 2012
  • Soil and Water Assessment Tool (SWAT) model has been widely used in estimation of flow and water quality at various watersheds worldwide, and it has an auto-calibration tool that could calibrate the flow and water quality data automatically from thousands of simulations. However, only continuous measured day flow/water quality data could be used in the current SWAT auto-calibration tool. Therefore, 8-day interval flow and water quality data measured nationwide by Korean Ministry of Environment (MOE) could not be used in SWAT auto-calibration even though long-term flow and water quality data in the Korean Total Maximum Daily Load (TMDL) watersheds available. In this study, current SWAT auto-calibration was modified to calibrate flow and water quality using 8-day interval flow and water quality data. As a result of this study, the Nash and Sutcliffe Efficiency (NSE) values for flow estimation using auto-calibration are 0.77 (calibration period) and 0.68 (validation period), and NSE value for water quality (T-P load) estimation (using the 8-day interval water quality data) is 0.80. The enhanced SWAT auto-calibration could be used in the estimation of continuous flow and water quality data at the outlet of TMDL watersheds and ungaged point of watersheds. In the next study, the enhanced SWAT auto-calibration will be integrated with Web based Load Duration Curve (LDC) system, and it could be suggested as methods of appraisal of TMDL in South Korea.