• 제목/요약/키워드: Load Power Factor

검색결과 844건 처리시간 0.025초

수용가용 STATCOM을 이용한 3상 유도전동기의 이론적인 역률 보상 (The Theoretical Power-factor Correction of a 3-phase Induction Motor using Customer STATCOM)

  • 임수생;이은웅;최재영;김홍권
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제49권7호
    • /
    • pp.475-482
    • /
    • 2000
  • This paper presents a novel power-factor correction method using customer STATCOM which generally improves the power quality of electric customers. Customer STATCOM detects the reactive currents of a induction motor(IM) and so injects compensation currents which is in 180$^{\circ}$ phase with load currents that the reactive power of IM is compensated. In particular, the paper proposes the general compensation current references in the synchronous coordinate system and makes converter output voltages using space-vector PWM. The compensation effect of customer STATCOM is confirmed through the simulation according to the operation condition of an induction motor (at no load and full load).

  • PDF

분산형전원이 도입된 배전계통의 손실산정기법에 관한 연구 (A Study on the Optimal Distribution toss Management Using toss factor in Power Distribution Systems)

  • 노대석
    • 한국산학기술학회논문지
    • /
    • 제6권3호
    • /
    • pp.231-240
    • /
    • 2005
  • 본 연구에서는 분산형전원이 연계된 배전계통에서 배전 손실을 설비별로 산정하는 알고리즘과 통계적인 방법에 의하여 배전손실 계수를 산정하는 알고리즘을 제시하여 배전 손실 관리의 정확도를 제고하는 방안을 마련하고자 한다. 먼저, 배전손실에 대한 개념을 정의하고 배전손실 산정시의 문제점에 대하여 분석하고, 배전손실 산정에서 가장 중요한 자료 추출 방법과 대상자료의 유효성 검증하는 방법을 제시한다. 그리고 통계적인 방법에 의한 부하특성계수를 산정하는 알고리즘을 제시하고, 배전손실 요소들간의 상호관계를 규명하며, 배전 설비별(고압배전선로, 배전용변압기, 저압배전선로) 손실계산 알고리즘을 개발한다.

  • PDF

유도발전기 역률 보상 콘덴서와 직렬 리액터의 동작 분석 (Operating Analysis of Power Factor Compensation Condenser and Series Reactor in the Induction Generator)

  • 김종겸;박영진
    • 전기학회논문지
    • /
    • 제66권3호
    • /
    • pp.593-598
    • /
    • 2017
  • Induction generator is always required reactive power in order to generate a rotating magnetic field as an inductive load. The reactive power must be continuously supplied to the induction generator as well as load of distribution system from the power supply side. So the power factor of the power supply side during the induction generation operation is low. Condenser is installed in order to raise the low power factor of the induction generator. Switching transients occurs when the power supply of the capacitor is turned on in order to ensure the low power factor. When using the reactor in series with the capacitor in order to reduce the influence of switching transient, it can affect the reactive power by the condenser voltage rises. In this study, we analyzed the operating characteristics for power and power factor of induction generator in accordance with the presence or absence of the application of the serial reactors for switching transients reduction of the condenser and the condenser for power factor correction.

Harmonics Reduction in Load control and Management system

  • Thueksathit, W.;Tipsuwanporn, V.;Hemawanit, P.;Gulpanich, S.;Srisuwan, K.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2003년도 ICCAS
    • /
    • pp.2283-2286
    • /
    • 2003
  • This paper presents conservation of electrical energy in building with harmonics analysis and compensation which occur in electrical system. We use load controlling and management system in order to adjust load factor of system.The maximum demand limiting and controlling are used ,then the system can acquire the prediction and compare it to the maximum demand set point.The electrical signal analysis based on FFT technique. The harmonics are compensated by using harmonic filters.This system consists computer which works as controller, processor , analysis and database unit together with digital power meter in form of multidrop network through serial communication via RS-485.The load control system uses PLC to control load via serial communication RS-485. The A/D converter is used for sampling the electrical signals via parallel port of computer.The harmonic filters are controlled by a computer.The data of measurement such as voltage, current, power, power factor, total harmonic distortion, energy, etc., can be saved as database and analysis. The load factor is adjusted by limiting and controlling maximum demand. The load factor adjustment can reduce the cost of electric consumption and energy generation together with harmonics compensation in order to increase high efficiency of electrical system.

  • PDF

Characterization and uncertainty of uplift load-displacement behaviour of belled piers

  • Lu, Xian-long;Qian, Zeng-zhen;Zheng, Wei-feng;Yang, Wen-zhi
    • Geomechanics and Engineering
    • /
    • 제11권2호
    • /
    • pp.211-234
    • /
    • 2016
  • A total of 99 full-scale field load tests at 22 sites were compiled for this study to elucidate several issues related to the load-displacement behaviour of belled piers under axial uplift loading, including (1) interpretation criteria to define various elastic, inelastic, and "failure" states for each load test from the load-displacement curve; (2) generalized correlations among these states and determinations to the predicted ultimate uplift resistances; (3) uncertainty in the resistance model factor statistics required for reliability-based ultimate limit state (ULS) design; (4) uncertainty associated with the normalized load-displacement curves and the resulting model factor statistics required for reliability-based serviceability limit state (SLS) design; and (5) variations of the combined ULS and SLS model factor statistics for reliability-based limit state designs. The approaches discussed in this study are practical and grounded realistically on the load tests of belled piers with minimal assumptions. The results on the characterization and uncertainty of uplift load-displacement behaviour of belled piers could be served as to extend the early contributions for reliability-based ULS and SLS designs.

배전용 변압기의 합리적인 사양과 그 설계법 (The optimum specifications and design of distributive transformers)

  • 이승원
    • 전기의세계
    • /
    • 제14권4호
    • /
    • pp.8-17
    • /
    • 1965
  • Firstly, this study has analyzed the following factors affecting the optimum specifications and design of distributive transformers: 1. Facilities installation cost per unit power output. 2. Facilities operating & maintenance cost per unit power output. 3. Production cost per unit power output. 4. Load factor. 5. Loss factor. Secondly, it has clarified the relations between the following factors and the specifications and design of distributive transformers; 1. No-load loss., 2. Load loss., 3. Voltage regulation., 4. Exciting current. Finally, it has determined the method of the most economic design for the transformers using the above factors and relations, and, for optimum the illustrative purpose, suggested their optimum specifications, way of evaluation, and merits by means of typical example.

  • PDF

부하역률 제약을 고려한 최적 급전 알고리즘 (The optimal power flow algorithm considering load power factor limits)

  • 김광욱;조종만;김진오
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.98-100
    • /
    • 2003
  • This paper presents the method for computing the power economic dispatch with an optimal power flow (OPF) computation algorithm, considering the power factor limits constraint. Efficient reactive power planning enhances economic operation as well as system security. Accordingly, an adequate level of power factor limits for the load buses should be evaluated for economic operation. The power factor limits are included and described into the OPF's objective function. The proposed method is applied to IEEE 26 buses system.

  • PDF

하중함수를 이용한 전력용 변압기 냉각 시스템 (Cooling System for Power Transformer Using Weighting Function)

  • 조도현
    • 전자공학회논문지 IE
    • /
    • 제49권2호
    • /
    • pp.40-45
    • /
    • 2012
  • 본 논문은 전력용 변압기의 최적화된 온도제어를 위하여 부하율을 이용하여 권선최고점온도를 예측하고 냉각장치를 제어하는 방법을 제안하였다. 전력용 변압기의 최적화된 온도제어를 위하여, 하중함수를 사용하여 부하전류에 따른 부하율과 권선온도, 외기온도, 오일온도 등을 바탕으로 권선최고점온도를 예측하는 상관관계식을 제시한다. 또한, 이를 전력용변압기에 적용하여 제어한 결과를 제시한다.

Induction Motor with Adjustable Windings for High Efficiency Drive in Light Load Operation

  • Zhang, Y.
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권2호
    • /
    • pp.508-513
    • /
    • 2014
  • Heavy load start but light load operation is a common case in practical drive applications. When an induction motor is employed for such applications, its rated power is usually chosen according to the heavy load start. Then, during light load operation, its efficiency and power factor are low. To solve this problem, it is proposed to adjust the motor windings from the startup to the normal operation conditions. In this paper, arrangement of the adjustable windings is introduced, air gap field with different windings is investigated, and steady state operation performance under various loads is examined. It can be seen that by using proper winding arrangement both startup and operation performances are satisfactory.

전압, 전류 및 부하 불평형율에 대한 비교 연구 (The Comparison Study for Voltage, Current and Load Unbalance Factor)

  • 김종겸;박영진;이은웅
    • 전기학회논문지P
    • /
    • 제54권2호
    • /
    • pp.88-93
    • /
    • 2005
  • Most of the LV customer have been applied the distribution system of 3-phase four wire system because of its advantage of supplying both of 1-phase & 3-phase loads simultaneously. Due to its structural simplicity, it is more convenient for use rather than the conventional separated scheme. But uneven load distribution or unclean voltage quality has occurred various problems such as de-rating, losses increase and vibration, etc. In this paper, voltage, current and power waveform in the actual fields have measured and analyzed in relation with internationally allowable voltage unbalance limits and compared the current unbalance factor with the load unbalance factor.