In this paper, We investigate the number of 795 transformer in the private electrical facilities and analyze the annual load factor. The results show that the annual load factor of transformer is 20.16% in manufacturing industry, education services(school) is 9.59%, retail and wholesale services is 19.68%, resort and leisure industry is 10.93%, office building is 13.10%, and apartment houses is 14.69%. Education services, resort and leisure industry are being operated with a very low annual load factor. The relatively small capacity of less than 500kVA transformer also been analyzed that is being operated with a low load factor. Therefore, In order to minimize the power loss of the transformer, it is advisable to complement the Transformer Efficiency Management system to be designed the efficiency is good transformer when the load is low. Analysis results will be used as the basis for the provision of transformer efficiency management system and be used High-efficiency transformers promotion system.
The contracted electric power and the demand factor of customers are used to predict the peak load in distribution transformers. The conventional demand factor was determined more than ten years ago. The contracted electric power and power demand have been increased. Therefore, we need to prepare the novel demand factor that appropriates at present. In this paper, we modify the demand factor to improve the peak load prediction of distribution transformers. To modify the demand factor, we utilize the 169 data acquisition devices for sample distribution transformers in winter, spring summer. And, the peak load currents were measured by the case studies using the actual load data, through which we verified that the proposed demand factors were correct than the conventional factors. A newly demand factor will be used to predict the peak load of distribution transformers.
Generally, the low-voltage customer has been used with a linear load and nonlinear load in the 3-phase 4-wire distribution system. Linear load has usually configured the resistance and inductance, current phase is slower than the voltage phase, so power factor is low. It is required for the power factor correction device prior to the phase of the current than the voltage. The capacitor is connected in parallel to the load in order to ensure a low power factor. Power converter such as an inverter is a typical non-linear load. Non-linear load generates harmonic currents in the energy conversion process. Many electrical equipment may be adversely affected by the harmonic current. There, passive or active filter have been used to reduce these harmonics current. Passive filter consisting of inductor and capacitor generates a reactive power. According to the combination of filter inductor and capacitor, reactive power can be adjusted. In this paper, we analyzed how the combination of inductor and capacitor affects the overall power factor by simulation and measurement.
The effect of cutting off fibers on transient load in a polymeric matrix composite lamina was studied in this paper. The behavior of fibers was considered to be linear elastic and the matrix behavior was considered to be linear viscoelastic. To model the viscoelastic behavior of matrix, a three parameter solid model was employed. To conduct this research, finite difference method was used. The governing equations were obtained using Shear-lag theory and were solved using boundary and initial conditions before and after the development of break. Using finite difference method, the governing integro-differential equations were developed and normal stress in the fibers is obtained. Particular attention is paid the dynamic overshoot resulting when the fibers are suddenly broken. Results show that considering viscoelastic properties of matrix causes a decrease in dynamic load concentration factor and an increase in static load concentration factor. Also with increases the number of broken fibers, trend of increasing load concentration factor decreases gradually. Furthermore, the overshoot of load in fibers adjacent to the break in a polymeric matrix with high transient time is lower than a matrix with lower transient time, but the load concentration factor in the matrix with high transient time is lower.
In this paper, the way that input voltage and input line current as a control variable is provided as one unit is projected. Till no, have denied with three phase balanced load. But, in that case, total power factor compensation is difficult, for to control each phase at unbalanced load. Therefor, in this paper suggest of the scheme that three phase unbalanced load is controlled by each phase and input total power factor is compensated unit input factor. therefore, in this paper suggest that three phase unbalanced load is controlled and the method in compensation of unit input factor to be attended by unbalanced load. Besides, the object of control is calculating quantity for input voltage and input line current for the point at issuse make to improve of control method at unbalanced load. As a result, control system of each phase could maintain as a unit input total power factor has been state diviation error of 2% with unbalanced load.
무공케이슨 방파제의 한계상태설계를 위한 하중저항계수를 제시하였다. 전국 항만의 16개 방파제에 대한 신뢰성해석을 수행하여 부분안전계수를 산출하였으며 이를 하중과 저항계수로 전환하였다. 개별적으로 구한 하중저항계수에 최적화기법을 적용하여 최종 하중저항계수를 보정하였다. 최종적으로 얻은 하중저항계수를 이용하여 방파제를 재설계한 후 목표수준을 만족하는지 검증하였다. 목표신뢰도수준의 변화에 따른 하중저항계수를 제시하여 한계상태설계가 용이하도록 하였다.
이 연구에서는 국내 도로교량 평가에서도 설계와 일관성이 있도록 한계상태설계법에 상응하는 평가방법을 마련하고, 선진국과 같이 평가에서 목표신뢰도지수를 감소시키는 경우 신뢰도분석을 통하여 보정하여 평가 활하중계수를 제안한다. 국내 대표 교량형식을 대상으로 수집한 실교량 자료를 활용하여 각 설계기준 별 설계활하중에 대한 하중효과를 산정하여 비교한다. 현행 설계법에 의해 산정된 하중효과를 바탕으로 최소요구강도를 산정하여 이에 대한 신뢰도분석을 통해 활하중계수 보정을 수행한다. 설계수준에 비하여 낮춰진 평가수준의 활하중계수를 교량 안전성평가를 수행하고, 이전 설계법의 안전성평가 결과와 비교하여 평가결과가 증가함을 확인하였다.
This paper presents a scheme on the characteristics of voltage and current unbalance factor under the load variation at the three phase 4-wire system. The voltage unbalance factor of the three-phase 4-wire system is approved by the field measurement. This system is composed of three one-phase transformer with each other capacity. Current unbalance factor is measured by the power quality measurement apparatus and compared by the load unbalance factor. Each phase has an impedance each other by the unbalanced load operation pattern and give rise to voltage unbalance.
The purpose of this paper is to develop new Z-Factors to evaluate the behavior of circumferential surface crack in ferritic steel piping including base metal and Submerged Arc Weld(SAW) metal in nuclear power plant. The Z-factor is a load multiplier to convert plastic load to elasto-plastic load. However the current Z-Factor is a load multiplier to convert plastic load to elasto-plastic load. However the current Z-Factor gives too conservative results. In this study, a J-estimation method, SC.TNP method, which is based on GE/EPRI expression, is used to develop new Z-Factors. The desirabilities of both the SC.TNP mehtod and the new Z-Factors are examined using the previous experimental results for the circumferential surface crack in ferritic steel pippings. The results are as follows ; (1) The SC.TNP mehtod is good for describing the circumferential surface crack behavior in farritic steel pipings, while the well-known R6 mehtod and DPFAD method give too conservative results. (2) The ASME-Z-Factor method using nwe Z-Factors well predicts the behavior of circumferential surface crack in ferritic steel pipings including base emtal and SAW metal.
This paper computes the regional, seasonal and hourly representative model of load power factor considering load characteristics of all 154/22.9 kV substations. An accurately computed representative model of load power factor is studied to present a precision improvement of power system analysis and the security of the system. The method to compute representative model of load utilizes the method of applicable moving average based on the method of flow average. The EMS data are used as the source to assess the load power factor.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.