• Title/Summary/Keyword: Linking of Project

Search Result 130, Processing Time 0.029 seconds

Project-based CALL Class: Linking the Theory and Practice

  • Yang, Eun-Mi
    • English Language & Literature Teaching
    • /
    • v.10 no.1
    • /
    • pp.53-76
    • /
    • 2004
  • This paper introduces a class model based on a course, Internet English, offered by an English department at a university. The course has dual purposes of developing students I English skills and Internet using skills at the same time. In support of using the Internet for language learning, the advantages of project-based language learning and constructivist learning in relation to CALL are explored. The activities in this course, which are basically project-based under the paradigm of constructivist learning perspective, are explained in detail to show the relationship between second language learning theory and teaching application. The way how the four language skills - speaking, listening, reading, and writing - are integrated in this class is described as well. Finally, judgmental evaluation of the course by the students is noted. The results show that a project-based CALL class could be a promising class model to realize an integrative, constructivist, and authentic learning.

  • PDF

SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF

Integration of the Feasibility Assessment Procedure and EIA of the Big Public Investment Project : In the Case of the Saemangeum Reclamation Project (대규모 공공투자사업의 경제적 타당성 평가와 환경영향평가 통압 방안 - 새만금 간척사업을 사례로 -)

  • Choi, Mi-Hee
    • Journal of Environmental Impact Assessment
    • /
    • v.11 no.2
    • /
    • pp.93-107
    • /
    • 2002
  • The choice of big public investment project needs an appropriate feasibility analysis before it is implemented, bemuse a rot wisely chosen one would bring about big and longrun societal costs. But the feasibility analysis for the big public investment project in Korea has been done without linking the economic benefits and environmental damages. Consequently social conflicts arose frequently during and after project implementation, owing to such concerns asincreasing costs and serious ecological damages. The recent social conflict over the Saemangeum Project is a typical case. This reclamation project began in 1991 and finished 60% of the whole process in 1999, when its feasibility was again assessed under the public pressure by the joint assessment team consisting of both citizen's and government's professionals. Even the assessment report by this joint team could not show the convincing results owing to the improper assessment procedure and failure to set proper feasibility criteria. This paper pointed out the limitations of our current procedure of feasibility assessment and identified the concrete problems that atosee during the recent reassessment process of the Saemangeum reclamation project by the joint team. In order to improve the current problem-ridden practices, it is concluded by the policy recommendation for establishing a right feasibility assessment procedure for the public investment projects.

A Study on Linking IPP with 'Work and Learning Dual Program' (IPP와 일학습병행 과정의 연계 방안에 관한 연구)

  • Cho, Yong-hyung;Lee, Hang-soo
    • Journal of Practical Engineering Education
    • /
    • v.12 no.2
    • /
    • pp.321-329
    • /
    • 2020
  • Most of the curricula of higher educational institutions, including universities, have been operated on a theoretical basis, and as a result, the academic talents have been mismatched with the competencies of industrial demand. Since 2015, the government project called "IPP-type Work and Learning Dual Program(WLDP)" is supporting four-year universities to minimize the academic talents mismatch. The purpose of the project is to improve the working ability of students by linking IPP with WLDP. However, the outcome of linking IPP to WLDP has been frustrating so far. In this study, "WLDP coupled with IPP" is proposed to reduce the perception gap between students and companies. In the suggested progress, student performs IPP first and WLDP second. Two examples have shown that the suggestion can be a quite effective process in matching student with the company.

A Study on National Linking System Implementation based on Linked Data for Public Data (공공데이터 활용을 위한 링크드 데이터 국가 연계체계 구축에 관한 연구)

  • Yoon, So-Young
    • Journal of the Korean Society for information Management
    • /
    • v.30 no.1
    • /
    • pp.259-284
    • /
    • 2013
  • Public information has been collected in various fields with huge costs in order to serve public purposes such as public agencies' policy-making. However, the collected public information has been overlooked as silos. In korea, many attempts have been made to open the public information to the public only to result in limited extent, where OpenAPI data is being presented by some agencies. Recently, at the national level, the LOD(Linking Open Data) project has built the national DB, initiating the ground on which the linked data will be based for their active availability. This study has outlined overall problems in earlier projects which have built up national linking systems based on linked data for public data use. A possible solution has been proposed with a real experience of having set up an existing national DB of Korean public agencies.

An Urban Regeneration Project for Making New CBD of Northeastern Seoul: The Case Study of the Changdong & Sanggye Project

  • Koo, Ja-Hoon
    • Land and Housing Review
    • /
    • v.8 no.2
    • /
    • pp.73-82
    • /
    • 2017
  • Although Changdong Sanggye area has been developed during 1980s as a new city for the supply of low-income housing, currently it was degraded to a bed town located outside Seoul. However, Changdong Sanggye area is designated as the center of a metropolitan area in '2030 Seoul City Basic Plan' due to a variety of potential factors such as a traffic center for linking metropolitan areas, location of 15 universities, and neighboring natural environment like Jungnang stream and Buckhan mountain. The purpose of urban regeneration plan is to create a new CBD of Changdong Sanggye which is the center of vocational and cultural lives of 3.2 million people in the northeastern metropolitan area. To achieve the purpose, 12 unit projects and 24 sub-unit projects are set up based on the three major goals and core strategies. An enterprise project team of northeastern area was newly founded and then a dedicated organization was established by the Seoul government in 2015 in order to integrate separated urban regeneration related functions. In the Seoul government an administrative council and a project promotion council are operated for consultation and coordination between the administrative divisions and government projects for urban regeneration. Through the success in Changdong Sanggye regeneration project, they are expected to have economic effects such as job creation and increase in tax revenue and to re-vitalize the area as a new economic center in northeastern Seoul having amenities and cultural facilities and waterfront parks.

Analysis of Local Community Spaces Bringing Empty Homes Back into Use in Japan - Focused on Empty Home Utilization Model Project of Kyoto City - (일본의 빈집을 활용한 지역사회 커뮤니티 거점공간 분석 - 교토시 「빈집활용 & 마을만들기」 모델 프로젝트를 중심으로 -)

  • Park, Hae-sun;Eun, Nan-Soon
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.24 no.2
    • /
    • pp.65-77
    • /
    • 2018
  • Purpose: By identifying the contents of the "Empty Home Utilization & Community Revitalization Model Project" which is a pilot project of empty homes back into use in Kyoto City and analyzing the characteristics of the case housing, the purpose of this study is to find out implications and suggest improvements for the domestic empty home utilization project. Methods: The scope of the survey covers seven project sites in the period from 2014 to 2016. The research method is to derive the physical and operational characteristics of the project, through the literature reviews related to bringing empty homes back into use in Kyoto City and the field survey including the space measurement and the operator interview. Results: First, in order to succeed in bringing empty homes back into use for community revitalization, the selection process of the project and the role of the public in and after supporting the project are important. Second, the important features that are required as a physical characteristic of the project are an advantage in location and an interactive space that is available at all time like a community cafe at the entrance. Third, as an operational characteristic of the empty home utilization project, it is advantageous for the local residents to participate as a business actor or an operator, and it is the continuous use of residents and outsiders by implementing an operating program that is suitable for the characteristics of the local community. Implications: The physical and operational activation factors to bring empty homes back into use need to be included as the project screening standards. And it is necessary for the public to develop the Intermediate Support Organization and to participate in linking with residents in order to carry out the empty homes utilization project effectively.

The Project Management Information System for the Work Efficiency Improvement (업무 효율 향상을 위한 사업관리정보시스템)

  • Ryu, Jee-Woong;Song, Jong-Cheol;Moon, Byung-Joo;Jung, Hoe-Kyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.1
    • /
    • pp.18-24
    • /
    • 2014
  • For successful projects, Project Management Information System(PMIS) using the formal systematic processes is necessary. Because the existing PMIS focuses on low-level project management, the life-cycle administration of the projects is required. In this dissertation, I describe not only the processes for managing a project with the top-down approach(a hierarchical goal setting of the project outcome), but also PMIS which can control whole processes of R&D projects. The PMIS described in this dissertation can reduce the workload of project management by providing user-adaptive environments and linking with related systems, so can be helpful to enhance the efficiency of the project management. And, it is expected that these processes can be the standard project management processes which are adaptive to various types of projects.

Design of STEAM Education Process applying 3D Printer for Computational Thinking

  • Kim, Woo Yeol
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.10 no.1
    • /
    • pp.23-30
    • /
    • 2018
  • Many practitioners in educational field, recently, are seeking to improve Computational Thinking through SW education. The purpose of this paper was, for promotion of SW education, to design the STEAM education process utilizing 3D printer. The project-based education process emphasized the cooperation in the process of producing common results and proposed a new STEAM education process. The designed products are expected to be used in the elementary school classes by linking with the camp and teacher training programs and the curriculum.

AUTOMATED CONSTRUCTION PLANNING AND VISUALIZATION

  • M. Kataoka
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.61-68
    • /
    • 2007
  • There has been a lot of research on and release of commercial systems that enable evaluation and visualization of construction methods. These have enabled the selection of good construction plans. However, the process in which engineers build 3D geometry, formulate a schedule and eventually synchronize them is still a time-consuming process. Changing any aspect of the geometry or the schedule and re-linking them is also time-consuming. Therefore, the engineers may compromise on getting the best solution. This paper describes a technique to automate the generation of multiple sets of schedules, quantity takeoffs and 4D visualization from a single 3D model.

  • PDF