• 제목/요약/키워드: Linked Operation

검색결과 323건 처리시간 0.022초

A GENERALIZATION OF ω-LINKED EXTENSIONS

  • Wu, Xiaoying
    • 대한수학회보
    • /
    • 제59권3호
    • /
    • pp.725-743
    • /
    • 2022
  • In this paper, the concepts of ω-linked homomorphisms, the ω𝜙-operation, and DW𝜙 rings are introduced. Also the relationships between ω𝜙-ideals and ω-ideals over a ω-linked homomorphism 𝜙 : R → T are discussed. More precisely, it is shown that every ω𝜙-ideal of T is a ω-ideal of T. Besides, it is shown that if T is not a DW𝜙 ring, then T must have an infinite number of maximal ω𝜙-ideals. Finally we give an application of Cohen's Theorem over ω-factor rings, namely it is shown that an integral domain R is an SM-domain with ω-dim(R) ≤ 1, if and only if for any nonzero ω-ideal I of R, (R/I)ω is an Artinian ring, if and only if for any nonzero element α ∈ R, (R/(a))ω is an Artinian ring, if and only if for any nonzero element α ∈ R, R satisfies the descending chain condition on ω-ideals of R containing a.

하수처리장 연계처리를 위한 가축분뇨 최적 처리공정 선정에 관한 연구 (Determination of Optimal Livestock Wastewater Treatment Process for Linked Treatment in Sewage Treatment Plant)

  • 김충곤;신현곤
    • 유기물자원화
    • /
    • 제20권3호
    • /
    • pp.52-59
    • /
    • 2012
  • 처리공정별 연계처리수질을 검토한 결과 생물학적처리만 거친 생물반응조 처리수의 경우 연계부하율이 $COD_{Mn}$의 경우 1.67%(설계수질 기준), 2.59%(운영수질 기준), T-P의 경우 3.69%(설계수질 기준), 7.67%(운영수질 기준)로 다소 높게 나타났으나 하수처리장 운영에 미치는 영향은 거의 없을 것으로 판단된다. 또한, 고도처리공정인 산화부상분리 처리수 및 생물여과 처리수의 경우 연계부하율은 1% 내외로 고도처리설비 설치 시 과대 설비설치의 우려가 있다. 따라서 S하수처리장의 경제성 및 안정적인 운영을 고려할 경우 생물학적처리인 생물반응조를 거친 처리수를 연계하는 것이 바람직할 것으로 판단된다.

소형 열병합발전 시스템이 연계된 배전계통에 초전도 전류제한기 적용시 리클로져-퓨즈 협조 분석 (Analysis on Recloser-Fuse Coordination in a Power Distribution System linked Small Scale Cogeneration System with Superconducting Fault Current Limiter)

  • 김명후;김진석;문종필;임성훈;김재철;이준규
    • 전기학회논문지
    • /
    • 제59권3호
    • /
    • pp.499-505
    • /
    • 2010
  • This paper analyzed that the coordination of recloser-fuse when a superconducting fault current limiter (SFCL) is installed to a power distribution system linked small scale cogeneration system. As a rule, the recloser to properly protect against both permanent and temporary fault is installed to upstream of fuse. Therefore, in a power distribution system linked small scale cogeneration system, the fault current is increased by adding fault current of small scale Cogeneration system when a permanent fault occurs, and the fuse could melt during the first fast operation of the recloser because of more sufficient heat from the increased current. However, when SFCLs are applied into a power distribution system linked small scale cogeneration system, the coordination of recloser-fuse could be accomplished due to decreased fault current as the effect of the impedance value of the SFCL. Therefore, to solve these problems, we analysed the operation of recloser-fuse coordination in a power distribution system linked small scale cogeneration system with SFCL using PSCAD/EMTDC.

분산전원이 도입된 배전계통에 초전도전류제한기 적용에 따른 보호기기 동작분석 (Analysis on operation of Protective Equipment According to Application of SFCL in a Power Distribution System)

  • 이용석;정상현;임성훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.67-68
    • /
    • 2011
  • This paper analysed a protective equipment in power distribution system linked distribution power system when a superconducting fault current limiter(SFCL) is installed. This paper focused on a recloser, because the recloser is a general protective equipment. When power distribution system linked distribution power system, a fault current is increased by adding fault current of distribution power system. The increased fault current makes many problems. But SFCLs are limiting fault current and help the protective equipment to operate normal process. We analysed the operation of protective equipment in power distribution system linked distribution power system with SFCLs.

  • PDF

일학습병행 PBL 확대에 따른 학위연계형 고숙련마이스터 과정의 과제와 개선방향 제안 (Suggestion of Challenges and Improvement Direction for the Degree-Linked High-Skilled Professional Course in Accordance with the Full Expansion of the Work-Study Combination PBL)

  • 이승준;김승희
    • 실천공학교육논문지
    • /
    • 제14권1호
    • /
    • pp.179-194
    • /
    • 2022
  • 2018년 일학습병행에 PBL(Project Based Learning) 방식이 P-Tech 유형에 처음 도입된 이후 2020년 시범사업으로 운영되고 있는 학위연계형 고숙련마이스터 과정에도 도입되면서 각 학과에서는 PBL 운영 규정에 맞게 표준이수체계를 개편하며, 그에 맞게 PBL 기반의 학습 및 훈련과정을 개발하여 운영하고 있다. 2021년 일학습병행 PBL의 확대 시행에 따라 그 운영 규정은 더욱 정교하게 개정되었다. 본 논문에서는 문헌연구를 통해 일학습병행 PBL의 특성, 학위연계형 고숙련마이스터 과정의 운영 절차 별 PBL 운영 규정과 가장 최근 시행된 PBL 운영 규정의 변경 내용을 상세히 고찰하였다. 이러한 사전 연구를 기반으로 한국기술교육대학교 IT융합SW공학과의 PBL 기반 표준이수체계 도출 과정 및 개발 결과, 운영 이후 표준이수체계의 적합성 검증을 위해 수행한 설문 조사 결과 사례를 소개하고, 변경되고 있는 일학습병행 PBL 운영 규정과 관련한 학위연계형 고숙련마이스터 과정의 도전 과제와 바람직한 개선 방향을 제시하였다. 본 연구는 대학에서 일학습병행 PBL을 원활하게 적용하기 위한 훈련과정개발의 참조를 제공할 수 있다. 또한 고숙련마이스터 과정을 포함하여 일학습병행의 PBL이 어떻게 발전해 나아가야 하는지에 대한 담론을 제시함으로써 일학습병행의 특성이 잘 반영된 고유의 PBL 제도 정착 및 안정적 확산에 기여할 것으로 사료된다.

A STUDY OF LINKED STAR OPERATIONS

  • Paudel, Lokendra;Tchamna, Simplice
    • 대한수학회보
    • /
    • 제58권4호
    • /
    • pp.837-851
    • /
    • 2021
  • Let R ⊆ L ⊆ S be ring extensions. Two star operations ${\ast}_1{\in}Star(R,S)$, ${\ast}_2{\in}Star(L,S)$ are said to be linked if whenever $A^{{\ast}_1}= R^{{\ast}_1}$ for some finitely generated S-regular R-submodule A of S, then $(AL)^{{\ast}_2}=L^{{\ast}_2}$. We study properties of linked star operations; especially when ${\ast}_1$ and ${\ast}_2$ are strict star operations. We introduce the notion of Prüfer star multiplication extension ($P{\ast}ME$) and we show that under appropriate conditions, if the extension R ⊆ S is $P{\ast}_1ME$ and ${\ast}_1$ is linked to ${\ast}_2$, then L ⊆ S is $P{\ast}_2ME$.

풍력발전단지 연계 전용선로 보호계전방식의 향상에 대한 연구 (A Study on the Improved Protective Relaying Algorithm Applied in the Linked System Interconnecting Wind Farm with the Utilities)

  • 장성일;김광호;권혁완;김대영;권혁진
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권12호
    • /
    • pp.675-683
    • /
    • 2003
  • This paper describes the correction strategy of an overcurrent relay applied in the linked line for interconnecting wind farm with utility power networks in order to improve the capability of a fault detection. The fault current measured in a relaying point might vary according to the fault conditions. Generally, the current of the line to line fault or the line to ground fault in the linked line is much higher than the set value of protective relay due to the large fault level. However, when the high impedance fault occurs in the linked line, we can't detect it by conventional set value because its fault level may be lower than the generating capacity of wind farm. And, the protective relay with conventional set value may generate a trip signal for the insertion of wind turbine generators due to the large transient characteristics. In order to solve above problems and improve protective relaying algorithms applied in the linked line, we propose a new correction strategy of the protective relay in the linked line. The presented method can detect the high impedance fault which can't be detected by conventional relay set value and may prevent the mis-operation of protective relay caused by the insertion of wind farm.

풍력 발전시스템의 효율적인 연계운전을 위한 1MVA급 STATCOM 개발 (STATCOM research for the efficient operation linked of wind power)

  • 이충우;오승훈;이윤재;최은식;강병관;류강열;김희중
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2013년도 추계학술대회 논문집
    • /
    • pp.119-120
    • /
    • 2013
  • Wind turbines as a power distribution system linked to the driving operation according to the characteristics of the distribution system can be adversely affected by a change of circumstances, depending on Distribution Systems with driving characteristics of a wind turbine can be affected. Thus according to the grid-tied wind turbines and transient suppression of the distribution lines and distribution lines outside of the accident in order to maintain stable power supply to supply reactive power efficient system is necessary to keep the voltage constant. In this paper, we substantiated in Jeju Hangwon 12 Unit Level 1MVA STATCOM system configuration, control, configure, and test results will be introduced.

  • PDF

OVERRINGS OF THE KRONECKER FUNCTION RING Kr(D, *) OF A PRUFER *-MULTIPLICATION DOMAIN D

  • Chang, Gyu-Whan
    • 대한수학회보
    • /
    • 제46권5호
    • /
    • pp.1013-1018
    • /
    • 2009
  • Let * be an e.a.b. star operation on an integrally closed domain D, and let $K\gamma$(D, *) be the Kronecker function ring of D. We show that if D is a P*MD, then the mapping $D_{\alpha}{\mapsto}K{\gamma}(D_{\alpha},\;{\upsilon})$ is a bijection from the set {$D_{\alpha}$} of *-linked overrings of D into the set of overrings of $K{\gamma}(D,\;{\upsilon})$. This is a generalization of [5, Proposition 32.19] that if D is a Pr$\ddot{u}$fer domain, then the mapping $D_{\alpha}{\mapsto}K_{\gamma}(D_{\alpha},\;b)$ is a one-to-one mapping from the set {$D_{\alpha}$} of overrings of D onto the set of overrings of $K_{\gamma}$(D, b).

하수처리 전산모사 프로그램을 통한 연계처리시 하수처리장 영향 평가 (Evaluation of the impact of sewage treatment plants in the Linked treatment through the sewage treatment computer simulation program)

  • 김성지;길경익
    • 한국습지학회지
    • /
    • 제22권4호
    • /
    • pp.321-327
    • /
    • 2020
  • 산업발전과 인구증가, 생활수준의 향상으로 하·폐수 발생량 및 하수처리장 연계처리수가 매년증가 하고 있다. 연계처리수는 저유량 고농도의 특징을 가지고 있다. 따라서 하수처리장 운영에 큰 영향을 미치고 연계처리수를 처리하기 위해 많은 비용도 사용되는 것으로 나타났다. 본 연구에서는 연계처리수의 유입 유량을 개별 반응조로 전량 유입시킬 경우 방류수 수질이 적게 상승한 시나리오를 도출했고, 모델링 결과 유입하수, 무산소조에 유입시킬 경우 방류수 수질이 가장 적게 상승하는 것을 확인할 수 있었다. 이와 같은 결과를 바탕으로 연계처리수의 유입 유량을 유입하수와 무산소조로 분배하여 유입시킬 경우에 대하여 분배 비율에 대한 다양한 시나리오를 생성했다. 다양한 시나리오를 통해 모델링을 진행한 결과 유입하수(80%), 무산소조(20%)의 비율로 연계처리수의 유입유량을 분배 유입 시킬 경우 TN, TP의 수질이 가장 적게 상승하는 것으로 나타났다.