A Trolley line is a very important equipment among electric railway equipments since it contacts directly with pantograph and supplies electricity on the electromotive. Such it was thought that a trolley line need not to consider fatigue since the replace cycle by wear is shorter than the replace cycle by fatigue breakage. But, the bending fatigue breakage accidents occurred several times at the Shinkansen trolley line in East Japan Railway Company. Therefore, in case of a new developed trolley line, the evaluation for bending fatigue life became more important, But, since there are not an authorized fatigue test method and a testing device for the trolley line, the quantitative evaluation is difficult. In this study, we analyzed the load and environment condition of trolley line used in the actual spot and the developed testing device that can evaluate bending fatigue properties of the trolley line as simulating the real condition. The bending fatigue test of the trolley line was achieved using the developed testing device and estimated the fatigue life of trolley line and also, established the fatigue test process.
The Transactions of the Korean Institute of Electrical Engineers D
/
v.49
no.12
/
pp.675-682
/
2000
When a system is composed of multi-boards, an efficient bus arbitration method for the data transfer bus must be provided for guaranteeing proper operations. In this paper, a new test methodology is developed which is used for testing on-line bus arbitration. In the new test methodology, events that are occurred during bus arbitration are defined, and expected signals during fault-free bus arbitration are compared with the signals captured during on-line bus arbitration using boundary-scan cells. For this, a new test architecture is proposed which is efficient for the maintenance and the repair of multi-board systems. In addition, the new methodology can be used with off-line interconnect test using boundary-scan.
Kim, Young-Kyu;Park, Se-Young;Song, Jeong-Hun;An, Cheon-Heon;Lee, Han-Min
Proceedings of the KSR Conference
/
2010.06a
/
pp.2215-2222
/
2010
Advanced EMU have been enhanced in terms of safe transport and maintainability. It is a new urban railway technology that enables an operation institution to cut repair and maintenance costs and customers to use convenient service at lower costs based on IT technology. If a development vehicle of Advanced EMU is completed, it will be used to test the entire advanced EMU system through sufficient performance check and reliability check prior to operation in commercial line. It will also verify efficiency, safety, punctuality and energy efficiency of transport. Accordingly, it is necessary to figure how to repair and maintain vehicles to enhance safety of Advanced EMU system in cooperation with operation during the period of comprehensive evaluation on the operation of a development vehicle in a test line. In this paper, we investigated the maintenance program of Advanced EMU on test operation in Dabul line. The test condition and operation environment of Advanced EMU in Daebul line was analyzed.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2008.04c
/
pp.111-114
/
2008
The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.
In this paper, we introduce the on-line test plan of high speed rail development, which will be carried out at the test section of Seoul-Pusan high speed line from May to October, 2002. The test items are decided focused on the verification of the perofrmace and acquirement of the technical data of the high speed rail system development. The running time and distance of the train are calculated for several limited maximum speed cases. The detailed test scenario shall be developed according to the process of development and design of the system.
Kim, Jeong-Boo;Jo, Seong-Sae;Shin, Goo-Yong;Lee, Dong-Il;Yang, Kwang-Ho;Ahn, Hee-Sung;Bae, Jeong-Hyo;Koo, Ja-Yoon;Min, Seok-Weon
Proceedings of the KIEE Conference
/
1994.07b
/
pp.1517-1519
/
1994
This paper describes electrical environmental study of a 765kV double circuit test line. Corona performance on several candidate conductor bundles has been investigated in the corona cage (single phase simulation facility) since 1984. We have known that six RAIL conductor bundle is the most suitable for the 765kV transmission Line, [3] To investigate electrical environmental impact of the future commerciale line, we build a full sacle 765kV test line in 1993. The test results of Audible Noise, Radio Interference, TV Interference from August, 1993 to Jan. 1994 were measured as $48.7[dBA](L_{50})$. $57.4[dB{\mu}V/m]$(Fair weather, $L_{50})$. $14.5[dB${\mu}$V/m]$(Fair weather, $L_{50}$). We have found that the Audible Noise data were very close to the predicted(48.5 [dBA]) by BPA Corona and Field Effects Computer program, however, the RI and TVI data were much higher than predicted(42 [dBmV/m], $7.9[dB{\mu}V/m)$ by the BPA program. We have investigating the reason of the difference. In the constructing of full scale test line, we developed the tubular tower, 765kV test transformer and hardwares of 765kV transmission line insulator strings. Also we will investigate the effects of plants under the 765kV test Line.
Shin, Kooyong;Kwon, Gumin;Ju, Munno;Woo, Jeong Min
KEPCO Journal on Electric Power and Energy
/
v.5
no.4
/
pp.249-256
/
2019
A full-scale test line was established to verify the electrical environmental interferences caused by the HVDC ±500 kV Double Bipole overhead transmission line with metallic return conductor, which is scheduled for construction in Korea and the fullscale test was conducted for one year. And through the human perception test of the DC electric-field under the HVDC Double Bipole line, the threshold value at which the human detects DC electric field was investigated to verify the validity of the design guide for the HVDC ±500 kV Double Bipole overhead transmission line. The polarity configuration of the HVDC ±500 kV Double Bipole test line was arranged diagonally with the same polarity in terms of the electrical environment disturbance and operation. The test line utilized the 6-bundle arrangement to prevent the corona discharge taking into account the domestic social acceptability. The test results show that the HVDC ±500 kV Double Bipole transmission line generated very little corona discharge from the conductors. Therefore, both DC electric field and ion current density met the domestic design guide for DC overhead transmission lines. Also, the human perception test of DC electric fields under the test line showed that 70% of participants did not recognize the DC electric field even when exposed to 23 kV/m.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.12
/
pp.2091-2097
/
2007
This paper described the verification of modeling technique of underground distribution from comparison between field test and simulation. It needs more exact transient phenomenon analysis model to establish lightning protection of underground distribution line. Although, there were a lot of transient phenomenon researches, nobody could has verified the confidence of modeling from field tests in interior until now. So, simulation model verified field test is needed to analyse transient phenomenon of underground distribution system. The examination must be accomplished in many different condition before suggesting these verified analysis model. In this paper, the conditions were examined and the various data results on the different line composition was compared with the EMTP simulation, when the lightning impulse test was accomplished at underground distribution line. Also the value between field test and simulation was very closed and the method of modeling has demonstrated confidence, when the method is used to analyse domestic transient phenomenon of underground distribution.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2004.11a
/
pp.97-100
/
2004
This paper introduced an artificial fault generator which was operated in the Go-Chang field-test center and explained the result of single line-to-ground fault by AFG. The AFG can basically experiment line-to-line and line-to-ground faults. This facility directly connected distribution transmission lines, so the test results are very useful for power system analysis and protection. Using the function of the AFG, we briefly said the test methods ud results for the 22.9[kV-v] and $6.6[kV-{\Delta}]$ system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.