• Title/Summary/Keyword: Line plan

Search Result 888, Processing Time 0.032 seconds

A Fundamental Study for Establishment of Channel Data Base in Power-Line Communications (전력선 통신 채널 Data Base 구축을 위한 기본 연구)

  • Oh Hui-Myoung;Kim Kwan-Ho;Lee Won-Tae;Lee Jae-Jo
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.52 no.2
    • /
    • pp.107-111
    • /
    • 2003
  • In the power-line communication systems, there are many factors of noise and attenuation in the power-line channels, because they were designed for not the communication but the power transmission. Also the transfer function of the channels is highly changed with the topology and the load of the power-lines. To cope with these poor channel situation, channel modeling, one of the many studies in progress, is being studied hard. Channel modeling is essential to apply the active schemes to overcome the bad channel(e.g. modulation technique, channel coding, signal coupling & filtering, etc.) to the power-line communications. In this paper, we have realized the statistical model(this model is suggested as the channel modeling method for the power-line channels) that is combined the transfer function with the various noises. And we have compared and examined the results with the measured data. Also we have studied the plan which can effectively establish the channel data base for the channel information consisted of the parameters that are derived from this modeling, and we have studied the plan to utilize the data base.

Through load prediction and solar power generation prediction ESS operation plan(Guide-line) study (부하예측 및 태양광 발전예측을 통한 ESS 운영방안(Guide-line) 연구)

  • Lee, Gi-Hyun;Kwak, Gyung-il;Chae, U-ri;KO, Jin-Deuk;Lee, Joo-Yeoun
    • Journal of Digital Convergence
    • /
    • v.18 no.12
    • /
    • pp.267-278
    • /
    • 2020
  • ESS is an essential requirement for resolving power shortages and power demand management and promoting renewable energy at a time when the energy paradigm changes. In this paper, we propose a cost-effective ESS Peak-Shaving operation plan through load and solar power generation forecast. For the ESS operation plan, electric load and solar power generation were predicted through RMS, which is a statistical measure, and a target load reduction guideline for one hour was set through the predicted electric load and solar power generation amount. The load and solar power generation amount from May 6th to 10th, 2019 was predicted by simulation of load and photovoltaic power generation using real data of the target customer for one year, and an hourly guideline was set. The average error rate for predicting load was 7.12%, and the average error rate for predicting solar power generation amount was 10.57%. Through the ESS operation plan, it was confirmed that the hourly guide-line suggested in this paper contributed to the peak-shaving maximization of customers.Through the results of this paper, it is expected that future energy problems can be reduced by minimizing environmental problems caused by fossil energy in connection with solar power and utilizing new and renewable energy to the maximum.

A Fundamental Study on the Introduction Result Analysis and Activation Plan Establishment of Coastal Safety Management Code (내항선안전관리규약(CSM Code)의 도입 성과 분석 및 활성화 방안수립을 위한 기초적 연구)

  • Noh Chang-Kyun;Chong Chong-Ho
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2005.05a
    • /
    • pp.23-29
    • /
    • 2005
  • Our country marine transport enterprise the international from competitive power from the hazard which develops at marine transport powerful country the government and marine transport presentation with activation of safety management protection of life Protection and oceanic environment from the sea hazard at the place where compared to it is endeavoring more the activation plan so far regarding the safety management from the coastal line insufficient are and the system and actuality safety management activation plan which is suitable in the coastal line is necessary. From the research which it sees consequently today a result analysis of coastal line safety management and the development direction of activation plan importance from it let in the immediacy which from the marine transport enterprise is important with the international and oceanic environmental protection it presented.

  • PDF

Capacity Planning and Control of Probe Process in Semiconductor Manufacturing (반도체 Probe 공정에서의 생산 능력 계획)

  • Jeong, Bong-Ju;Lee, Young-Hoon
    • IE interfaces
    • /
    • v.10 no.1
    • /
    • pp.15-22
    • /
    • 1997
  • In semiconductor manufacturing, the probe process between fabrication and assembly process is constrained mostly by the equipment capacity because most products pass through the similar procedures. The probe process is usually performed in a batch mode with relatively short cycle times. The capability of the probe process can be determined by the optimal combination of the equipments and the products. A probe line usually has several types of equipment with different capacity. In this study, the probe line is modeled in terms of capacity to give the efficient planning and control procedure. For the practical usage, the hierarchical capacity planning procedure is used. First, a monthly capacity plan is made to meet the monthly production plan of each product. Secondly, the daily capacity planning is performed by considering the monthly capacity plan and the daily fabrication output. Simple heuristic algorithms for daily capacity planning are developed and some experimental results are shown.

  • PDF

A Note on the Hull Form Variational Methods (선형변환 방법에 대한 소고)

  • 이춘주;윤현세;유재문
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.40 no.1
    • /
    • pp.63-68
    • /
    • 2003
  • Systematic geometrical variation method of hull forms, such as "1 -Cp", "Swinging" and "Lackenby" are widely used in the early stage of a new design from those of a similar parent ship, which shows a better performance through the model test and/or sea trials. This method is simple and easy to modify original hull forms without changing the main characteristics. The shape of the prismatic curie can be easily varied by these methods, however, the frame line shape in the body plan can′t be generated easily, when the section shapes are complicated or have discontinuities or the mismatch of the body plan and the stem and stern profiles. To overcome this drawback of the hull form variations, a simple and useful method has been proposed in the present study.

Daegu Urban Railroad Line No.3 Vehicle System Selecting (대구도시철도 3호선 차량시스템 선정)

  • Jeon, Bae-Un;Yoo, Je-Nam;Lee, Ung-Hee
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1105-1114
    • /
    • 2007
  • Recently the urban railroad which is under plan and construction in domestic is under consideration Light Rail Transit mostly with the alternative against excess of working expenses of Midium Rail Transit(subway), inefficient transportation problem etc. It come to a conclusion that the application of the light rail transit is proper from reserve feasibility study and approval process of Master plan in Daegu urban railroad Line No.3 Based on hereupon, carried out the detail investigation for optimum system selection which suitable for Daegu urban circumstance in process of master plan can satisfy the working expenses decided in national expenditure support project.

  • PDF

Development of Scheduling System for Production of the Hydraulic Control Valve of Construction Equipment (건설기계 유압밸브 생산을 위한 일정계획 시스템 개발)

  • Kim, Ki-Dong;Lee, Bo-Hurn
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.61-67
    • /
    • 2007
  • The construction machine is the composite machine assembled by about 30,000 parts. Excavator, one kind of a construction machine, plays the leading role for export of construction equipment. It is generally impossible to produce all of the items within one company. Especially the supply of hydraulic control valves, one of the core part of the construction equipment, depends on the import heavily. So it is important to make an efficient production plan of hydraulic control valves in the company. The most important thing for the production scheduling of a hydraulic control valve is to make production schedule keeping the start date for assembly line for an excavator and to make minimization of the stock level. The production plan of hydraulic control valve includes the decision of the quantity supplied by subcontractor. This paper presents a scheme for a scheduling system of the hydraulic control valve considering the schedule of the assembly line for excavator production. This paper provides a methodology, which can make a plan of supply and production and generate a detailed schedule for daily production.

  • PDF

A primary study of Rail Station Selection and Train Operation Management Plan with Transportation Demand (철도수송수요를 고려한 정차역 선정과 열차운행방안 -경부선 서울~조치원구간을 중심으로-)

  • 문대섭;정병현
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.80-87
    • /
    • 2001
  • The purposes of this primary study are the selection of rail station and train operation management techniques for express-rail operation service at the convectional railway electrification. For these analyses, we used the KNR statistics and KROIS data of rail stations and train users by rail line. Therefore, we chose the important stations for express-rail operation of Kyongbu conventional rail line (esp. Seoul-Jochiwon section) through the rail transportation demand. and then, suggested primary operational management plan thorough the effects analyses of decreasing total travel time and increasing transportation demand by train speed-up. This study has some bounds and limits for proceeding, as it does, we excluded as followings: the conditionals of fate system, headways and train diagram, economic/financial analysis and technological assessment, and other railway technological infrastructures and a certain railcar specification, etc. . We propose to enlarge this study into a feasibility study of express or skip-stop operation service and compatible vehicle system decision considering with the best possible investment rail line, furthermore. in front of Kyongbu (Seoul-Busan) high-speed rail open in 2004, we have to try to progress the efficiencies of railway operation applying various train operation management plan.

  • PDF

Database Development Guideline for the Effective Management of Underground Facilities in Seoul (GIS를 이용한 지하매설물의 효율적 관리방안 : 데이터베이스 설계 및 구축방안을 중심으로)

  • 강영옥;조태영
    • Spatial Information Research
    • /
    • v.5 no.1
    • /
    • pp.115-131
    • /
    • 1997
  • Effective management of underground facilities which include water line, sewer line, electric line, telephone line, gas line etc., is very important for people's safety as well as administrative efficiency. The purpose of this study is four-fold: first, investigate management status of utility information of each utility companies, second, develope classification system of underground facilities and use this classification system for guidelines of database construction and for the exchange of database among utility companies, third, construct database using existing utility maps in pilot study area and identify accuracy of the existing maps and suggest strategy of database construction, fourth, suggest strategy of database maintenance and its organizational plan in connection with national plan.

  • PDF

An Efficient Model and Algorithm to Allocate Rail Track Capacity Considering Line Plans (노선 계획을 고려한 철도 선로 용량 배분 최적화 모형 및 해법)

  • Park, Bum Hwan;Chung, Kwang Woo
    • Journal of the Korean Society for Railway
    • /
    • v.17 no.6
    • /
    • pp.466-473
    • /
    • 2014
  • Recently, there is has been significant interest in the allocation systems of rail track capacities with considerations of the multiple train operating companies. The system indicates both a well-defined procedure and an algorithmic method to allocate the rail track capacities. Among them, this study considers the algorithmic method to derive the optimal timetable for the trains, which the companies propose together with their arrival and departure times at each station. However, most studies have focused on the adjustment of the departure and arrival times without conflicts, which could result in incompatible allocations with the line plan, which would result in an insufficient number of trains on each line to satisfy the demands. Our study presents a new optimization model and algorithm for the allocation problem in order to reflect the predetermined line plan. Furthermore, we provide the experimental results that were applied to the Korean high-speed railway network including the Suseo lines.