In 1998, because of the economic crisis called IMF Crisis in Korea, Kyungbu high speed railway project could run by modifying the original plan to open it as a 1st phase only by utilizing the existing railway lines from Seoul to Siheung and the other one from Daegu to Pusan. The modified plan includes that the line from Daegu to Pusan will be constructed as a second phase in next time. Starting railway operation with the changed plan, the combined application operation of high speed rail, passenger rail and freight rail was caused partly from Seoul to Siheung to run into capital area. As a result, the opinion for additional railway line construction is insisted continuously because the operation volume of passenger rail was forced to be reduced, the service quality of it was decreased and it became difficult to add new high speed services. Moreover, with regard to Honam high speed rail, the new construction plan of station in Kangnam metro area as a basement station for starting from Suseo was changed to the plan of turning out at Osong because of the economic effectiveness and this kept resident people in Kangnam metro area and southern Kyungki area unable to get the opportunity of high speed rail service benefit. After beginning of Kyungbu high speed railway operation, national transportation system developments are focused on high speed rail, and when the second phase construction of Kyungbu high speed rail, beginning operation of Kyungjeon line, Jeolla line double track construction, Honam high speed rail in 2014, is completed, the demand for high speed rail will be increased and it is unavoidable to make Kwangmyung station as a basement station and to reduce the number of passenger rail operation. At this moment, it is valuable to consider adding the railway line capacity in capital area to improve the transferring service for citizen who live in area without Kyungbu high speed rail station and to expand the service area from Kangbuk to Kangnam and southern Kyungki area. Accordingly, in this paper, the effective rail operation method, facility plan and the other issue to be reviewed for increasing capital high speed railway lines will be mentioned.
Hakbongjongtaek(The head house of Uisong Kim family, 鶴峯宗宅), firstly built in the early 17th century, was moved to its neighboring place in the late 18th century. The man who led the relocation(移建) of the house was the eldest grandson of the family, Jong-soo, Kim. He made and overall plan and also participated in building the house. There remain four Gados(family paintings, 가도(家圖)) related to the relocation plan. This paper aims to make an analysis of these Gados, and through analysis, to find what was the essential poing of the relocation plan and how the point was represented in the paintings. The result of analysis is as follows: 1. The main focus of relocation plan was the form of Anchae(the inner house). Anchae was designed as asymmetrical form, and restricted to four kan. Only Andaechung needed to be 6 kan size for religious ceremonies. 2. For the design of Sarangchae, the displacement of large Sarangbang and small Sarangbang was an important issue. There were two ways of layout: parallel type and facing type. The latter was chosen. 3. The representation and techniques of Gado is quite concrete, in spite of differences among them. The expression of doors, windows, attic and kitchen was based on the understanding of space. Also the spatial division, which was expressed line on the grid, was based on the scaled ruler. As we've seen before, painting the relocation plan was a kind of endeavors to make the housing type as a realization of Garye. Also, we can find out that role of the eldest grandson of the family was quite important to carry out the plan. As well as, it was meaningful to examine Sadaebu (the aristocrat of Chosun)'s perception of housing.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
v.29
no.1
/
pp.473-478
/
2005
This paper presents a approach to the measurement of efficiency which is trunk route of global liner. Data evelopment analysis(DEA), as it is called, has particular applicability in the service sector. Applying mathematical programming techniques, DEA enables relative efficiency ratings to be derived within a set of analysed units(line services). This paper investigates the efficiency employing DEA Model of line service classified into route(ex. America-asia line, Europe-asia line, Pendulum line etc). Result of this paper, suggests to some plan for improving the performance in the side of operating global liner.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2010.06a
/
pp.109-109
/
2010
On-line partial discharge(PD) diagnostic system is the most prominent systems to diagnose insulation condition for the high voltage rotating machines. Partial discharge measuring system(PDMS) series with ceramic coupler(PD detecting sensor) installed hydro generator and high voltage motor have been measured the PD data for many years. The trend of PD magnitude in the on-line PD system increased for some machines. These machines showed a same result in the conventional off-line PD test and PD magnitude decreased after stator winding insulation cleaning. This case study show that PDMS has been proved to be good results by comparing PD magnitude with on-line and off-line PD test and it is important to plan the maintenance project for the hydro generator stator winding because PD value was decreased after insulation cleaning.
Line planning is to determine the frequency of trains on each line to satisfy origin-destination demand while minimizing total operation cost. However, different from the line planning in passenger transportation, it is more important at which intermediate stations each train should be stopped and shunted because the freight car handling works like drop-off or(and) pick-up can incur much time and high cost so that the delay deteriorates the quality of rail freight transportation service. We present an optimization model for constructing line plan in rail freight transportation to simultaneously minimize the train operation cost and total transportation time of freights. And we suggest a column generation approach for our problem, which can solve the real network instances in reasonable computation times.
The Transactions of The Korean Institute of Electrical Engineers
/
v.66
no.1
/
pp.7-15
/
2017
Ambient Adjusted line Rating(AAR) method for overhead transmission lines considering Risk Tolerance(RT) was proposed in this paper. AAR is suitable for system operators to plan their operation strategy and maintenance schedule because this can be designed as a seasonal line rating. Several candidate transmission lines are chosen to apply the proposed method in the paper. As a result, it is shown that system reliability was significantly enhanced through maximizing transfer capability, solving the system constraints.
This paper is a study of Le Corbusier's trace regulateur of the 1920s, particularly its role in the design of the Villas La Roche-Jeanneret and Stein-de Monzie. It proceeds on the basis of the following three themes: first, the relation between the regulating line and the dom-ino frame; second, its status as a proportional device based not on a module system but one that defines relations; third, its function as an essential practical device in the design process. In the Villa La Roche-Jeanneret, the embedded horizontal planes of the dom-ino frame were constant, but the vortical lines of the columns were altered according to the changes in plan. Initially, a left-hand bay window formed a symmetry with the right-hand bay window, the only constant in the design process. With subsequent changes, mullion sections of the horizontal window and roof elements came to provide the reference points for the regulating line. Eventually, a regulating line different from the one that controlled the bay window and the elongated volume came to control the entrance hall of Villa La Roche, resulting in three different kinds of regulating lines in the final version. In contrast to the Villa La Roche-Jeanneret, a singular and consistent regulation line was anticipated in the earliest design stages of the Villa Stein-de Monzie. The repetition of its A:B grid and the standard $2.5m{\times}1.0m$ sliding window determined the proportions of both its plan and elevation, and thus the regulating line became 'automatic,' losing its viability as a practical tool. Though the regulating titles of the La Roche-Jeanneret look as if they were an afterthought, drawn after the design was complete, they were most active, requiring tenacity and discipline in their application. On the other hand, the seemingly 'redundant' regulating line of the Villa Stein-de Monzie gains its raison d'etre from the dom-ino frame. Its cantilevers and uninterrupted horizontal window could be used in decisive fashion because of the guarantee that the correct proportion would always be maintained. Thus we discover that Le Corbusier's discipline of the 1920s had a certain spectrum of flexibility. His 'parti' ranged from the extremely loose and malleable grid of the Villa La Roche-Jeanneret to the fixed grid of the Villa Stein-de Monzie. In different ways, these projects retain the tension between the dom-ino frame and the regulating line. For Le Corbusier, as much as the grid was an object with fixed attributes, it was also an active medium manipulated by the will of the architect.
Purpose - This thesis is to develop a management plan and checklist by analyzing the prevention of accidents in advance by presenting the management plan for the major causes of railway accidents. Research design, data and methodology - In recent 5 years, we have analyzed the cases of railway accident, presented the management plan for the accident, and made a practical safety checklist focusing on the main measures according to the management plan. Results - The analysis of the cases of near-railway accidents suggests more concrete and practical safety management measures because the similar accidents are continuously occurring due to formal safety management. Conclusions - It is more valuable to apply to the adjacent construction of the railway line by creating a detailed checklist based on cases rather than the existing checklist. This study is written only as a human factor. For future real - time safety management, it is necessary to study more precisely cause analysis and safety equipment as a big data - based safety control system for more systematic safety management.
Journal of the Korea Institute of Information and Communication Engineering
/
v.8
no.5
/
pp.1129-1133
/
2004
The MIC-NET of 3,010 circuits to process on-line business on post, insurance, finance, electromagnetic wave, and so forth has the problems on spending of bandwidth for the lack of flexibility of leased-line service band. In this paper, it is suggested to establish the efficient 3 steps conversion plan through analysis and comparison with economical efficiency on MIC-NET. The promoting policy proposed in this paper, both MIC and local post office will raise image as financial institute and provide high level service with reliability and security as distinguished government organization.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.