• Title/Summary/Keyword: Line balance

Search Result 369, Processing Time 0.028 seconds

Designing Mold Feed Systems for Plug Cover Housing with Filling Analysis (충전해석에 의한 Plug Cover Housing 금형의 피드시스템 설계)

  • Park, Jong-Cheon;Yu, Man-Jun
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.17 no.5
    • /
    • pp.123-130
    • /
    • 2018
  • In this study, the optimum design of mold feed systems is determined for plug cover housing (PCH), which is a cover-assembly product that protects the wiring of automobile connectors. The design goal is to achieve the filling balance of the resin in the left and right covers while avoiding the occurrence of weld lines in the hinge as much as possible. For the optimization, an orthogonal array experiment and a main effect analysis of the design factors are performed, and the factors that cause the interactions with the two design characteristics are selected as the design variables. We present some design alternatives, i.e., some combinations of the design variables, and analyze the filling-simulation results, expected molding risk, and cost economics to select an optimum design solution among the design alternatives. In the optimal solution, the weld line is generated at a position outside the hinge, and the filling balance is also acceptable, showing that both design goals can be satisfied simultaneously despite conflicting with each other.

Narrative Review of Clinical Impact of Head-Hip Offset Following Adult Spinal Deformity Surgery

  • Sunho Kim;Seung-Jae Hyun;Jae-Koo Lee;Ki-Jeong Kim
    • Journal of Korean Neurosurgical Society
    • /
    • v.67 no.2
    • /
    • pp.137-145
    • /
    • 2024
  • In adult spinal deformity (ASD) surgery, mechanical failure (MF) has been a significant concern for spine surgeons as well as patients. Despite earnest endeavors to prevent MF, the absence of a definitive consensus persists, owing to the intricate interplay of multifarious factors associated with this complication. Previous approaches centered around global spinal alignment have yielded limited success in entirely forestalling MF. These methodologies, albeit valuable, exhibited limitations by neglecting to encompass global balance and compensatory mechanisms within their purview. In response to this concern, an in-depth comprehension of global balance and compensatory mechanisms emerges as imperative. In this discourse, the center of gravity and the gravity line are gaining attention in recent investigations pertaining to global balance. This narrative review aims to provide an overview of the global balance and a comprehensive understanding of related concepts and knowledge. Moreover, it delves into the clinical ramifications of the contemporary optimal correction paradigm to furnish an encompassing understanding of global balance and the current optimal correction strategies within the context of ASD surgery. By doing so, it endeavors to furnish spine surgeons with a guiding compass, enriching their decision-making process as they navigate the intricate terrain of ASD surgical interventions.

A Performance Consideration on Conversion Loss in the Integrated Single Balanced Diode Mixer

  • Han, Sok-Kyun;Kim, Kab-Ki
    • Journal of information and communication convergence engineering
    • /
    • v.1 no.3
    • /
    • pp.139-142
    • /
    • 2003
  • In this paper, we consider the factors that affect a conversion loss performance in designing a single balanced diode mixer integrated with IRF(Image Reject Filter), based on the embedded electrical wavelength placed between the IRF and mixer, diode matching and LO drive amplifier. To evaluate the conversion loss performance, we suggest two types of a single balanced mixer using 90 degree branch line coupler, microstrip line and schottky diode. One is only mixer and the other is integrated with IRF and LO drive amplifier. The measured results of a single balance diode mixer integrated IRF show the conversion loss of 8.5 dB and the flatness of 1 dB p-p from 21.2 GHz to 22.6 GHz with 10 dBm LO. The measured input PI dB and IIP3 are 7 dBm and 15 dBm respectively under the nominal LO power level of 10dBm. The LO/RF and LO/IF isolation are 22 dB and 50 dB, respectively.

Compatibility Solution of IC Information for Board Production Automation (보드 생산 자동화를 위한 IC 정보의 호환성 Solution)

  • Kim, Gui-Jung
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2006.11a
    • /
    • pp.512-515
    • /
    • 2006
  • This paper proposes the solution of compatibility problem between heterogeneous by converting automatically CAD data into proper data for the PCB board production process by using IC item information. This paper has a purpose of maximizing work efficiency with NC Programming automation and contributing to maximize productivity by NC program conversion of different Mounters and Mounter Data & Line Balance optimization.

  • PDF

Automatic Image Mosaicking

  • Song Nak-hyun;Cho Woosug;Cho Seong-Ik;Yun YoungBo
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.121-124
    • /
    • 2004
  • This paper proposed the method of creating image mosaic in automated fashion. It is well known that geometric and radiometric balance in adjacent images should be maintained in mosaicking process. The seam line to minimize geometric discontinuity was extracted using Minimum Absolute­Gray-Difference Sum considering constraint condition in search width. To maintain the radiometric balance of images acquired at different time, we utilized Match Cumulative Frequency, Match Mean and Standard Deviation and Hue Adjustment algorithm. The mosaicked image prepared by the proposed method was compared with those of commercial software. Experiments show that seam lines were extracted significantly well from roads, rivers. ridgelines etc. and Match Cumulative Frequency algorithm was performed pretty good in histogram matching

  • PDF

PC/ASA blends having enhanced interfacial and mechanical properties

  • Kang, M.S.;Kim, C.K.;Lee, J.W.
    • Korea-Australia Rheology Journal
    • /
    • v.18 no.1
    • /
    • pp.1-8
    • /
    • 2006
  • Blend of bisphenol-A polycarbonate (PC) and (acrylonitrile-styrene-acrylic rubber) terpolymer (ASA) having excellent balance in the interfacial properties and mechanical strength was developed for the automobile applications. Since interfacial adhesion between PC and styrne-acrylonitrile copolymer (SAN) matrix of ASA is not strong enough, two different types of compatibilizers, i.e, diblock copolymer composed of tetramethyl polycarbonate (TMPC) and SAN (TMPC-b-SAN) and poly(methyl methacrylate) (PMMA) were examined to improve interfacial adhesion between PC and SAN. TMPC-b-SAN was more effective than PMMA in increasing interfacial adhesion between PC and SAN matrix of ASA (or weld-line strength of PC/ASA blend). When blend composition was fixed, PC/ASA blends exhibited similar mechanical properties except impact strength and weld-line strength. Impact strength of PCI ASA blend at low temperature was influenced by rubber particle size and its morphology. PC/ASA blends containing commercially available PMMA as compatibilizer also exhibited excellent balance in mechanical properties and interfacial adhesion.

Optimizing Construction Alternatives for Repetitive Scheduling (반복공정 최적 공법대안 선정 방법)

  • Park, Sang-Min;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.132-133
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Element Design of Balancing Shaft for Reducing the Vibration in Engine Module (엔진진동 저감을 위한 밸런싱샤프트의 요소설계 기법 연구)

  • Lee, Bong-Hyun;Kim, Dong-Chul;Jung, In-Oh;Kim, Chan-Jung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.15 no.11 s.104
    • /
    • pp.1268-1275
    • /
    • 2005
  • Vibration in Engine module could be reduced by introducing a balance shaft module which has one or more unbalanced rotors. Since the unbalanced rotor is installed in an opposite direction of the free force or unbalance moment by engine component, the unexpected vibration could be decreased kinematically. The essential equation of the unbalanced rotor was Presented for two cases, 3 in-line and 4 in-line cylinder engine type, And the efficiency of the balance shaft is investigated by the vehicle testing that is focused on measuring the reduced vibration level when adapting a balancing module. With the signal processing of measured signals, some important issues on design the balancing shaft could be derived and the overall design process is explained in the final part including the peripheral component, i.e. housing and bush.

Optimizing Construction Alternatives for Scheduling Repetitive Units

  • Park, Sang-Min;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.158-160
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of existing time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes to cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Stochastic Scheduling for Repetitive Construction Projects

  • Lee, Hong-Chul;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.166-168
    • /
    • 2015
  • Line of Balance (LOB) method is suitable to schedule construction projects composed of repetitive activities. Since existing LOB based repetitive project scheduling methods are deterministic, they do not lend themselves to handle uncertainties involved in repetitive construction process. Indeed, existing LOB scheduling dose not handle variability of project performance indicators. In order to bridge the gap between reality and estimation, this study provides a stochastic LOB based scheduling method that allows schedulers for effectively dealing with the uncertainties of a construction project performance. The proposed method retrieves an appropriate probability distribution function (PDF) concerning project completion times, and determines favorable start times of activities. A case study is demonstrated to verify and validate the capability of the proposed method in a repetitive construction project planning.

  • PDF