• Title/Summary/Keyword: Line Start

Search Result 340, Processing Time 0.025 seconds

Development of On-line Displacement Monitoring System for High Temperature Steam Pipe of Fossil Power Plant (화력발전소 고온 증기배관 실시간 변위감시 시스템 개발)

  • Lee Young Shin;Hyun Jung Seob
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.22 no.6 s.171
    • /
    • pp.83-89
    • /
    • 2005
  • Most domestic fossil power plants have exceeded 100,000 hours of operation with the severe operating condition. Among the critical components of fossil power plant, high temperature steam pipe systems have had a many problems and damage from unstable displacement behavior because of frequent start up and shut down. In order to prevent the serious damage and failure of the critical pipe system in fossil power plants, 3-dimensional displacement measurement system was developed for the on-line monitoring. Displacement measurement system was developed with a use of a LVDT type sensor and two rotary encoder type sensors. This system was installed and operated on the real power plant successfully.

A New Starting Potential Fair Queuing Algorithm with O(1) Virtual Time Computation Complexity

  • Kwak, Dong-Yong;Ko, Nam-Seok;Kim, Bong-Tae;Park, Hong-Shik
    • ETRI Journal
    • /
    • v.25 no.6
    • /
    • pp.475-488
    • /
    • 2003
  • In this paper, we propose an efficient and simple fair queuing algorithm, called new starting potential fair queuing (NSPFQ), which has O(1) complexity for virtual time computation and also has good delay and fairness properties. NSPFQ introduces a simpler virtual time recalibration method as it follows a rate-proportional property. The NSPFQ algorithm recalibrates the system virtual time to the minimum virtual start time among all possible virtual start times for head-of-line packets in backlogged sessions. Through analysis and simulation, we show that the proposed algorithm has good delay and fairness properties. We also propose a hardware implementation framework for the scheduling algorithm.

  • PDF

Short-Term Generation Scheduling Considering Transmission Line Capacity Limits (선로용량한계를 고려한 단기 발전계획)

  • 김준현;송현선;유인근
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.35 no.12
    • /
    • pp.594-602
    • /
    • 1986
  • This paper proposes an effective algorithm for short-term generation scheduling for the purpose of economic and secure operation of thermal power systems. Especially, in the procedure of solution by Dynamic Programming, Linear Programming is introduced to promote the possibility of optimal solution and the security of power systems, and evaluation of security function is improved by the application of seven step approximation of normal distribution. Several necessary considerations, that is, time dependent start-up and constant down cost of generating units, demand and spinning reserve constraints, minimum up and sown time constraints, the number of possible start-up of a generating unit in a d and the number of generating units which can be started up at the same time at the same bus, are also incoporated to elevate the usability and flexibility of the algorithm. Finally, the effectiveness of the proposed algorithm has been demonstrated by applying to the 6-gen. 21-bus model power system.

  • PDF

A Study on TRANSYT Model-embedded Parameters (TRANSYT 모델의 내재 모개변수에 관한 연구)

  • 도철웅
    • Journal of Korean Society of Transportation
    • /
    • v.6 no.1
    • /
    • pp.55-64
    • /
    • 1988
  • Prior to using any computer model, the program-embedded palameters showing significant differences from real world should be calibrated. This is especially true when the model is expected to be used fro various roadway and traffic condition. The calibration of TRANSYT model was conducted for the parameters of start-up delay, and lag, stop penalty(K), platoon dispersion factor, and saturation flow rate. The values of the parameters were obtained by theoretical methods from actual field measurements for discharging and arrival pattern. The sites elected for the study was an intersection of Dongil-Ro and Hwarang-Ro, and a 334 meter downstrean section from the intersection stop line on westbound Hwarang-Ro. The study results showed that the start-up delay was 2.6 sec, end lag was 1.0 sec, saturation flow rate was 2287 pcphgpl, platoon dispersion factor was 0.2-03, and stop penalty(K) was 32. However, since these parameters re apt to depend on traffic and roadway condition, it is doubtful whether the obtained values will be applicable to the area-wide situation other than this particular site.

  • PDF

Analysis of Reactive Power Capability for Salient Synchronous Generators, and its Application to Primary Restorative Systems (돌극형 동기 발전기의 무효전력 공급 한계 해석 및 우선공급계통에의 적용)

  • Lee, H.J.;Park, S.M.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.1
    • /
    • pp.14-17
    • /
    • 2007
  • Power system restoration following a massive blackout starts with re-energizing primary restorative transmission systems at first. The comparison of the TLCC(transmission line charging capacity) and the RPC(reactive power capability) of related black-start generator should be considered in this stage because overvoltage can be caused by self-excitation at the generator when the RPC is smaller than the TLCC. The RPC can be decided by two criteria. One is stator end core heating, and the other is steady state stability. RPC in steady state stability area has been found based on a synchronous reactance Xd. This paper presents RPC limit of salient pole machine which is different from that of non-salient pole machine in steady state stability area and shows derivation process about that.

Detailed Analysis of the KAERI nTOF Facility

  • Kim, Jong Woon;Lee, Young-Ouk
    • Journal of Radiation Protection and Research
    • /
    • v.41 no.2
    • /
    • pp.141-147
    • /
    • 2016
  • Background: A project for building a neutron time-of-flight (nTOF) facility is progressing. We expect that the construction will start in early 2016. Before that, a detailed simulation based on the current architectural drawings was performed to optimize the performance of our facility. Materials and Methods: Currently, several parts had been modified or changed from the original design to reflect requirements such as the layout of the electron beam line, shape of the vacuum chamber producing a neutron beam, and the underground layout of the nTOF facility. Detailed analysis for these modifications has been done with MCNP simulation. Results and Discussion: An overview of our photo-neutron source and KAERI nTOF facility were introduced. The numerical simulations for heat deposition, source term, and radiation shielding of KAERI nTOF facility were performed and the results are discussed. Conclusion: We are expecting that the construction of the KAERI nTOF facility will start in early 2016, and these results will be used as basic data.

HCA AND TWC HYBRID SYSTEM FOR REDUCING COLD-START EMISSION

  • Lee, S.C.;Jang, J.H.;Lee, B.Y.;Bae, J.H.;Choung, S.J.
    • International Journal of Automotive Technology
    • /
    • v.5 no.1
    • /
    • pp.1-7
    • /
    • 2004
  • In line with the Super Ultra Low Emission Vehicle (SULEV) regulation, the main idea in this study has been focused on the utilization of hydrocarbon adsorber (HCA) to adsorb the excess hydrocarbons emitted during a period of engine cold-start, As main recipes of HCA materials, many types of zeolite as well as the combination of alumina and precious metals were used, Representative physico-chemical factors of zeolite such as acidic and hydrophobic properties were characterized. The optimum recipe of HCA materials was also determined. Among the acid properties of zeolites, the Si/Al ratio was found to be the most important factor to get higher hydrocarbon adsorption capacity.

Development of Shortest Path Searching Network Reduction Algorithm (최단경로 탐색영역 축소 알고리즘 개발)

  • Ryu, Yeong-Geun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.12 no.2
    • /
    • pp.12-21
    • /
    • 2013
  • This study developed searching network reduction algorithm for reduce shortest path searching time. Developed algorithm is searching nodes that have the including possibility of less weights path than temporal path that consists minimum number of nodes and minimum sum of the straight line distances. The node that has the including possibility of shortest path is the node that the sum of straight line distance from start node and straight line distance to target node is less than the value that temporary path's weights divided by minimum weights units. If searching network reconstitutes only these nodes, the time of shortest path searching will be reduced. This developed algorithm has much effectiveness that start node and target node is close in large network.

Waterhammer for the In-Line Intake Pumping Station with Air Chamber (에어챔버가 설치된 인라인 취수펌프장에서 수격현상)

  • Kim, Kyung-Yup;Ahn, Cheoul-Hong;Kim, Bum-Jun
    • The KSFM Journal of Fluid Machinery
    • /
    • v.15 no.6
    • /
    • pp.70-76
    • /
    • 2012
  • Recently, because people are taking a great interest in the water supply system and the related facilities are getting larger, the surge suppression is very important problem. The waterhammer occurs when the pumps are started or stoped for operation or tripped due to the power failure. As the waterhammer problems as a result of the pump power failure were very serious, these situations were carefully investigated. Accordingly, we carried out both numerical simulations and field tests to confirm the safety of Juam intake pumping station in which had the in-line pumps. In this paper, it was reviewed that the water supply system has the reliability on the pressure surge, in case the air chambers were installed at both the inlet and the oulet of the in-line pumping station. From the numerical simulations, we found that negative pressure occurred at the inlet disappeared and high pressure occurred at the outlet reduced due to the air chambers. And these results of numerical simulations verified by the field tests. The field tests carried out in case of normal start, normal stop, one and two of pumps emergency stop. By results of simulations and field tests, we are sure that Juam intake pumping station in which have the air chambers is safe for the waterhammer. In addition, we suggested the operation methods of facilities for safe maintenance of the pumping station.

Third-line Hormonal Therapy to Treat Prostate Cancer Relapse after Initial and Second-line Hormonal Therapy: Report of 52 Cases and Literature Review

  • Matsumoto, Kazuhiro;Hagiwara, Masayuki;Hayakawa, Nozomi;Tanaka, Nobuyuki;Ito, Yujiro;Maeda, Takahiro;Ninomiya, Akiharu;Nagata, Hirohiko;Nakamura, So
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.15 no.8
    • /
    • pp.3645-3649
    • /
    • 2014
  • The aim of this study was to evaluate the efficacy of third-line combined androgen blockade (CAB) therapy for castration-resistant prostate cancer that relapsed after primary and second-line CAB. We retrospectively reviewed the medical records of 52 patients who received first-, second-, and third-line CAB therapy (medical or surgical castration, plus steroidal antiandrogen of chlormadinone acetate, or nonsteroidal antiandrogen of flutamide or bicalutamide). For cumulative analysis, we searched the PubMed database and identified a total of 50 cases published in English. Including our cases, this provided a total of 102 cases for analysis. In our study cohort, 11 cases (21.2%) achieved more than 50% reduction of serum prostate-specific antigen (PSA) on initiation of third-line CAB. We found that third-line CAB with nonsteroidal antiandrogen after second-line CAB with steroidal antiandrogen exhibited favorable results, with a positive response in six of 13 patients (46.2%). Cumulative analysis findings were comparable. Regarding the timing of third-line CAB administration, 15 patients had started at a PSA equal to or less than 4.0 ng/ml, and eight of them (53.3%) showed a positive response to treatment, compared to only three of 37 patients (8.1%) whose PSA at the initiation of third-line therapy was higher than 4.0 ng/ml (p<0.001). We conclude that third-line CAB with nonsteroidal antiandrogen would be particularly useful for patients whose cancer progressed after second-line CAB with steroidal antiandrogen. The timing of treatment seems to be important because the higher the PSA at the start of third-line therapy, the lower the PSA response rate.