• Title/Summary/Keyword: Line Design

Search Result 6,821, Processing Time 0.032 seconds

The Design and Characteristics of the Line Coupler for Power Line Modem (전력선 모델을 위한 Line-Coupler의 설계 및 특성)

  • Park, Chong-Yeun;Cho, Gye-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 1999.07g
    • /
    • pp.3132-3134
    • /
    • 1999
  • To realize the power line communication system, the line coupler is one of the most important systems, which must be adjustable to the power line characteristics. In this paper, three kinds of line couplers were designed and simulated with the Pspice, which could be useful to the power line communication systems in C-Band(95kHz-148.5kHz) frequency

  • PDF

An Algorithm of Automatic 2D Quadrilateral Mesh Generation with the Line Constraints (라인(line) 제약조건을 가지는 2차원 사각 메쉬의 자동 생성 알고리즘)

  • 김인일;이규열;조두연;김태완
    • Korean Journal of Computational Design and Engineering
    • /
    • v.8 no.1
    • /
    • pp.10-18
    • /
    • 2003
  • FEM (Finite Element Method) is a fundamental numerical analysis technique in wide spread use in engineering application. As the solving time occupies small portion of entire FEM analysis time because of development of hardware, the relative lime to the whole analysis time to make mesh mod-els is growing. In particular, in the case of stiffeners such as features attached to plate in ship structure, the line constraints are imposed on mesh model together with other constraints such as holes. To auto-matically generate two dimensional quadrilateral mesh with the line constraints, an algorithm is pro-posed based on the constrained Delaunay triangulation and Q-Morph algorithm in which the line constraints are not considered. The performance of the proposed algorithm is evaluated. And some numerical results of our proposed algorithm ate presented.

Manufacturing Line Optimization for Discrete Event Simulation and Genetic Algorithm (이산사건 시뮬레이션과 유전자 알고리즘을 이용한 제조업 공장의 라인 최적화)

  • Jeong, Young-Soo;Yim, Hyun-June;Jee, Hae-Seong;Lee, Kwang-Kook
    • Korean Journal of Computational Design and Engineering
    • /
    • v.13 no.1
    • /
    • pp.67-75
    • /
    • 2008
  • In spite of rapidly increasing interests in digital manufacturing, there still lacks of a systematic approach in manufacturing line flow analysis via modeling and simulation; currently, the parameters for designing manufacturing line are defined by being solely based on engineers experiences. The paper proposes an application of the genetic algorithm to a discrete event line simulation finding optimal set of parameters for manufacturing line balancing problem. The proposed method has been applied to two example problems-one is a simple manufacturing model and the other for shipyard industry-in order to demonstrate its validity and usefulness.

A Design for Dynamic Line Rating System to increase Overhead Transmission Line Capacities (가공송전선의 송전용량을 증가시키기 위한 동적송전용량 시스템의 설계)

  • Kim, Sung-Duck
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.7
    • /
    • pp.72-77
    • /
    • 2011
  • Dynamic Line Rating (DLR) techniques have been greatly worthy of notice for efficiently increasing transmission capacity as well as controlling load-flow in overhead transmission lines, in comparison with the existing power system operating with Static Line Rating (SLR). This paper describes an utilization method to implement DLR control system for old transmission lines built in the first stage using the ground clearance design standard with lower dips. The suggested DLR system is focused on designing as temperature control system rather than current/load control system. Based on several performance for conductor temperatures, it is shown that DLR system with efficiency can be implemented.

Planning and Design of Seoul Subway Line 6 (서울지하철 6호선 건설계획)

  • 박계병;이인근
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.10b
    • /
    • pp.3-30
    • /
    • 1993
  • To ease traffic congestion Seoul Metropolitan Government formulated the 2nd Phase of Seoul Subway Construction Scheme in 1989. The scheme calls for the construction of %60 km of subway which includes addition of 4 more subway lines and extension of 3 existing subway lines in addition to the existing 118 km of subway. As a final stage of the scheme subway line 6 is under planning and design. The line 6 is 36.1 km-long route connecting Ungam-Samgakchi-Changsin-Sinnae. Except for the depot main line wilts be underground and major construction methods are cut and cover and tunnelling. As a tunnelling method New Austrian Tunnelling Method will be adapted. The line will be opened by the end of 1997. With the completion of the line Seoul will have 278 km of subway network and the transport share by subway will be increased from 25% in 1992 to 50% in 1997.

  • PDF

Formability Study on Weld Line Location and Movement of Laser-Tailor Welded Blanks

  • Hong, Joo-Pyo;Kim, Heon-Young;Oh, Soo-Ik
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 1997.03a
    • /
    • pp.19-24
    • /
    • 1997
  • The weld line location and the weld line movement in stamping with laser-tailor welded blanks(TWB) were investigated through square cup deep drawing tests. The step blank holder was introduced to form TWB of different thicknesses without wrinkling, and the non-uniform blank holding force(BHF) was enforced to control weld line movement. Test results of the blanks with shifted weld lines showed that the large portion of the thinner area could result in a large weld line movement. Careful selection of the weld line location and the BHF control should be adapted in TWB design to avoid failures and to ensure its formability.

  • PDF

A Control System Design for the Line-of-Sight Stabilization based on Low-Cost Inertial Sensors (저가 관성센서 기반의 시선안정화 제어시스템 설계)

  • 위정현;홍성경
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.9 no.3
    • /
    • pp.204-209
    • /
    • 2003
  • The line-of-sight stabilization system is an equipment which is loaded on a vehicle and stabilizes the direction of the line-of-sight of the vision sensor to obtain a not-swayed image in the existence of external disturbances. To obtain accurate Euler angles and angular velocities simultaneously we usually need a control system which uses high-price inertial sensors including Vertical Gyro(VG) or Rate Integrating Gyro(RIG). In this paper, we design and implement a control system of a gimbal, which is a line-of-sight stabilization system using a low-cost mixed algorithm of a rate gyro and an accelerometer instead of a VG and a RIG. In the experiment where we laid the implemented line-of-sight stabilization system on the rate table. we can see the stabilized performance to external disturbances.

Transferred OverVoltages on LV sides in Multigrounded Neutral during Line to Ground Fault on Distribution Systems (배전계통의 고저압 혼촉고장시 중성선 전위상승에 따른 저압기기 스트레스 전압)

  • Choi, Sun-Kyu;Choi, Jong-Kee;Kim, Kyoung-Hun;Choi, Myeong-Ho;Lee, Byung-Sung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.6
    • /
    • pp.910-915
    • /
    • 2012
  • In this paper we propose multi-grounded neutral design method which was considered of transferred transient overvoltage when line to neutral fault occurs. Specially, In order to confirm the actual transient overvoltage magnitude which occurs on neutral line, we considered some screening(shielding) effects. The screening coefficient was deducted from field test results and calculation in a distribution line which is identical with an actual power line. The purpose of this paper is to attempt to suggest the guidance for grounding skystem design considering limitation of overvoltage for LV side in IEC 61936. The result is based on EMTP simulation and real field faults situation in distribution lines.

A Study on Optimized Layout Design of FAS Line Through Production Flow Analysis (생산 흐름 분석을 통한 FAS라인의 최적 배치 설계에 관한 연구)

  • Ga, Chun-Sik;Jung, Jin-Hwi;Jang, Bong-Choon;Eom, Yong-Gyun
    • Proceedings of the KSME Conference
    • /
    • 2004.04a
    • /
    • pp.1070-1075
    • /
    • 2004
  • Many mid-sized companies in Korean automotive industry have attempted to solve the lack of human power, to control the quality of components, to improve the production rate, and to innovate the manufacturing line. The goals of this study are to analyze the production rate of an automotive component manufacturing line using simulation software, to construct a Flexible Automation Subassembly (FAS) system and to suggest an optimized layout design using FAS line. In this research, the simulation model for manufacturing line was developed and used the realistic data (production planning, component type, working order, process time, queue time, line rules, etc) of a medium sized company in Korean automotive industry. To complete this research, a simulation software 'ARENA' was used.

  • PDF

A Study on Optimized Layout Design of FAS Line Through Production Flow Analysis (생산 흐름 분석을 통한 FAS라인의 최적 배치 설계에 관한 연구)

  • Ga Chun Sik;Jang Bong-Choon;Eom Yong-Gyun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.29 no.1 s.232
    • /
    • pp.38-44
    • /
    • 2005
  • Many mid-sized companies in Korean automotive industry have attempted to solve the lack of human power, to control the quality of components, to improve the production rate, and to innovate the manufacturing line. The goals of this study are to analyze the production rate of an automotive component manufacturing line using simulation software, to construct a Flexible Automation Subassembly (FAS) system and to suggest an optimized layout design using FAS line. In this research, the simulation model for manufacturing line was developed and used the realistic data of a medium sized company in Korean automotive industry. To complete this research, a simulation software 'ARENA' was used. This research analyzed the work distribution strategy and cycle time element for production flow and proposed an optimized layout to resolve line balancing problem which would bring the improved production rate.