Seo, Hun Chul;Han, Joon;Choi, Sun Kyu;Lee, Byung Sung;Rhee, Sang Bong;Kim, Chul Hwan
Journal of Electrical Engineering and Technology
/
v.11
no.1
/
pp.167-174
/
2016
The Korean distribution line currently consists of overhead ground wires (OHGW), overhead distribution lines, neutral wires (NW), and messenger wires (MW). The MW is installed under the NW. The lightning protection system in Korea is focused on OHGW and lightning arrester and the MW are not considered. Therefore, this paper proposes the applicability of MW for purpose of lightning protection. For this, we analyzed the effects of lightning overvoltage according to the existence of OHGW and MW and the grounding conditions of the MW in the Korean distribution system. The grounding conditions of the MW that we took into consideration were the common or separate grounding of the MW and NW. The analysis based on the equivalent circuit of the distribution pole at each condition was performed. The distribution lines and lightning were modeled using the Electromagnetic Transients Program (EMTP). For each of the installation conditions of the OHGW and MW, the various lightning conditions were simulated and analyzed for both direct and indirect lightning. The simulation results showed that, if the OHGW was not installed in the Korean distribution system, the lightning overvoltage could be reduced by the common grounding of the MW and NW.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.50
no.8
/
pp.359-364
/
2001
This paper presents the influence of the lightning overvoltage and the shielding effect of lightning arresters and overhead grounding wires on the DC railroad systems. Modeling of railroad system is established in ATPDraw to perform the simulation and the line constants of railroad were calculated using ATP_LCC. When a direct lightning strikes to the DC railroad, the result of simulation reveals that the shielding effect of arresters is reduced at messenger, trolly-wire, and the shielding effects of overhead grounding wire is over 90% than the case which does not include it. Therefore it is evaluated that overhead grounding wires should be installed in the DC railroad line.
The Transactions of The Korean Institute of Electrical Engineers
/
v.62
no.6
/
pp.737-743
/
2013
This paper describes the overvoltage through lightning surge analysis on underground system in DC combined distribution systems. It is considered that operating micro grid including distributed generation with smart grid can make possibility of composing new distribution system different from existing one. However, there are many papers about low voltage DC distribution in grids or buildings but not many about replacement or distributing 22.9kV AC distribution system to DC system. Among many research need for DC system development, overvoltage is studied in this paper. Overvoltage is simulated on DC cable when lightning strikes to overhead grounding wire which is installed at the nearest location from power cable section. Analysis as well as modeling is performed in EMTP/ATPDraw. It is evaluated that analysis results can be used to design of DC underground distribution power cable system.
This paper investigates the transient characteristics of grounding systems used in under-ground distribution power cables. Recently, two kinds of grounding system are used for underground distribution cables in Korea. The first one is conventional multi-point grounding system, the other is newly proposed non-bundled common grounding system. The non-bundled common grounding system has an advantage the decreasing the power loss due to decrease of the shield circulation current. In this paper, the lightning overvoltage induced in neutral wire (in case of non-bundled common grounding system, overvoltage between opened neural wires and grounding in each phase) of these two kinds of grounding systems are estimated and compared by field tests and EMTP simulations. The EMTP simulation methods are firstly verified by comparison of measurement and simulation. Finally, the insulation level against lightning is expected by EMTP simulation results using verified model.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.52
no.12
/
pp.713-721
/
2003
This paper analyzes the switching overvoltage occurred on 345kV underground power cable system as well as combined transmission system using EMTP. Cable length and closing time, preinsertion resistance have effect on switching overvoltage. Therefore, this paper analyzes the switching overvoltage occurred on conductor and sheath with change of those parameters. Specially, the cross bonding position becomes discontinuity point because of the difference between surge impedance of metal sheath and that of lead cable. Thus, the transmission and the reflection of traveling wave complexly occur at this connection point. According to these influences, voltage between sheath and earth as well as voltage between joint boxes rise. Time to crest point of switching overvoltage is longer than lightning overvoltage. Even though the voltage induced by switching surge is smaller than lightning surge, that voltage may have serious effect on the metal sheath. Therefore, this paper also analyses the reduction effect of switching overvoltage when the preinsertion resistance of circuit breaker is considered.
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.3
/
pp.331-337
/
2014
The Korean distribution system consists of overhead ground wire (OHGW), phase conductors and neutral wire. Especially, OHGW is installed over the phase conductors to protect distribution system from the lightning surge. The flashover rate and the magnitude of lightning overvoltage on distribution system can be affected by grounding condition of OHGW such as grounding resistance and grounding interval. In this paper, we conduct an analysis of lightning overvoltage and flashover rate according to the grounding condition of OHGW. The distribution system and lightning surge are modeled by using ElectroMagnetic Transient Program (EMTP). Also, the Monte Carlo method is applied to consider random characteristics of lightning, and the flashover rate is calculated based on IEEE std. 1410. The simulations are performed by changing the grounding resistance and interval of OHGW and the simulation results are analyzed.
The Transactions of The Korean Institute of Electrical Engineers
/
v.62
no.4
/
pp.474-481
/
2013
It is anticipated that AC distribution system can be replaced by DC distribution system in the near future because of the operation of various distributed source or microgrid system. However DC distribution system replacing 22.9kV AC distribution line is not sufficiently studied still. This paper describes lightning overvoltage analysis among many research fields should be studied to realize DC overhead distribution systems. DC distribution system is modeled using EMTP and overvoltage is analyzed according to interval of arrestor location, earth interval of overhead grounding wire and grounding resistance. It is evaluated that analysis results can be effectively used to design of future DC distribution system.
Kim, H.J.;Choi, S.Y.;Jung, H.S.;Shin, M.C.;Park, N.O.
Proceedings of the KIEE Conference
/
1998.11a
/
pp.279-281
/
1998
This paper present overvoltage induced on distribution power line by lightning surge. It is important problem that overvoltage threatens credit and security of the power system. In this paper induced overvoltage was calculated. From the line being modeled in really actual practice. Also, the proper suppressing effects of a surge arrester against lightning induced voltages were suggested.
This paper analyses the lightning overvoltage with earth of grounding wire and installation types of arresters in double circuits distribution systems. First, the model for analysis is selected severer case between upper line and lower line when the direct lightning surge strikes on the overhead grounding wire. The lightning overvoltage is variously calculated with earth distance between overhead grounding wires. This paper also analyses the effect of the installation distance between arrestors and the earth resistance of overhead grounding wire. From these results, authors examine the rationality of BIL that is applied in distribution system.
Seo, Hun-Chul;Han, Jun;Kim, Chul-Hwan;Choi, Sun-Kyu;Lee, Byung-Sung
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.8
/
pp.1077-1082
/
2012
This paper analyzes the lightning-induced overvoltage and current in buried underground distribution cable. Based on analytical expressions, the lightning-induced overvoltage and current in buried underground distribution cable is calculated by EMTP/MODELS. The modeling is verified by comparing with the results in reference. Also, the type and buried arrangement of cables used in domestic distribution line are modeled by EMTP/ATPDraw. The various simulations according to the type and buried arrangement of cable are performed and the simulation results are analyzed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.