• Title/Summary/Keyword: Life-cycle Cost Analysis

Search Result 582, Processing Time 0.026 seconds

Traffic Demand Forecasting Method for LCCA of Pavement Section (도로포장의 생애주기비용 분석을 위한 장기 교통수요 추정)

  • Do, Myungsik;Kim, Yoonsik;Lee, Sang Hyuk;Han, Daeseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2057-2067
    • /
    • 2013
  • Traffic demand forecasting for pavement management in the present can be estimated using the past trends or subjective judgement of experts instead of objective methods. Also future road plans and local development plans of a target region, for example new road constructions and detour plans cannot be considered for the estimate of future traffic demands. This study, which is the fundamental research for developing objective and accurate decision-making support system of maintenance management for the national highway, proposed the methodology to predict future traffic demands according to 4-step traffic forecasting method using EMME in order to examine significance of future traffic demands affecting pavement deterioration trends and compare existing traffic demand forecasting methods. For the case study, this study conducted the comparison of traffic demand forecasting methods targeting Daejeon Regional Construction and Management Administration. Therefore, this study figured out that the differences of traffic demands and the level of agent costs as well as user costs between existing traffic demand forecasting methods and proposed traffic demand forecasting method with considering future road plans and local development plan.

The Road Subsidence Status and Safety Improvement Plans (도로함몰 실태와 안전관리 개선 방안)

  • Bae, Yoon-Shin;Kim, Kyoon-Tai;Lee, Sang-Yum
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.545-552
    • /
    • 2017
  • Ground subsidence can result in the formation of sinkholes, potholes, settlement of structures, and road subsidence. Road subsidence is described as the sudden collapse of the road surface into subsurface cavities caused by the loss of bearing capacity in the ground, such as the dissolution of limestone by fluid flow in the surface causing the formation of voids leading to subsidence at the surface. Road subsidence occurs about 665 times annually, and this incidence has been increasing until 2013. Damaged underground facilities, management negligence, and lowering of the ground water table have been the causes of road subsidence in Seoul. Seoul metropolitan government announced special management counter plans to relieve the anxieties and make the roads safe for passing. Construction sites, such as excavation works, need to be managed properly because they have strong potential to induce road subsidence. The aim of this study was to identify the main causes of road subsidence and suggest management plans. First, life cycle cost analysis revealed the daytime construction to be more appropriate than nighttime. In addition, by analyzing the limitations of using sand as a backfill material, it is proposed to use a flowable backfill material instead of sand. Finally, to reduce the blind spots, which is a problem in surveying the road pavement conditions of local governments, the road to be managed is divided into several zones, and a specialized agency is selected for each zone and a method of surveying the blind spots through collaboration is suggested.

A study on the efficiency measurement of University's technology transfer by DEA model (DEA 모형을 이용한 국내 대학의 기술이전 효율성 분석)

  • Jin, Gyung-Mi;Yoon, Byun-Gun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.6
    • /
    • pp.2558-2569
    • /
    • 2012
  • While the cost of technology development is increased, the life cycle of products and services that have been developed has become progressively shorter. Open innovation have been increasing by company as a strategy to respond to the rapidly changed market. Technology transfer from universities is one of the typical means of technological innovation. Although a university has invested significant resources in R&D, the results has been neglected. Therefore, at the moment, research is needed about the outcomes and efficiency of technology transfer at universities. In the previous research, since most of studies focus on the analysis of factors that influence the outcome of technology transfer, in this study, targeting domestic universities, the efficiency of technology transfer at the university was analyzed. In addition, differences in the efficiency of different types of university is verified. Consequently, universities specializing in technology and industry has high-efficiency than the others. There is no significant difference between the groups of universities whether or not to participate in Technology Licensing Office(TLO). More efforts are required for successful results of TLO in Korea. This study is expected to be able to provide reasonable indicators on technology transfer for further research.

A Scheme on applying IT technology for TLCSM improvements (TLCSM 개선을 위한 IT기술의 적용방안)

  • Choi, Myoungjin;Kwon, Daeil;Yang, Jeakyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.12
    • /
    • pp.26-33
    • /
    • 2016
  • The cost of preparing munitions in weapon system operation and management has been rapidly increasing and current weapon systems have become complicated and diverse due to new warfare pattern changes and the rapid growth of advanced scientific technology. Moreover, as a part of the execution plans of creative economics, the Korean government is actively reviewing how to minimize the costs of preparing munitions. Accordingly, this study derived the issues of munitions management for decreasing munitions preparing costs. First, the issues of munitions management were introduced through review and analysis with respect to the munitions classification criteria, regulations and systems, and equipment maintenance information systems. Second, we proposed the application and necessity for the real-name system which is responsible for munitions management and the fragmentation of the maintenance instructions status classification criteria.. Also, we were analyzed that the effects depending on the application. Finally, we proposed that the linkage system which is currently military active with equipment maintenance information systems as well as the total life-cycle management system (TLCSM) improvements to the itemized data and records management system by utilizing IT technology CMB that must be done in order to improve the issues.

A Strategy for Developing New Road Projects (경관도로 등 신개념의 도로사업 개발에 관한 연구)

  • Kim, Eung-Cheol
    • International Journal of Highway Engineering
    • /
    • v.9 no.2 s.32
    • /
    • pp.115-127
    • /
    • 2007
  • Developed countries, especially in road construction and management fields, introduce new road porjects such as National Scenic Byways Program(NSBP program) in USA and the Eco-road project in Japan. This study develops a conceptual model for deploying new road projects in Korea. The four step approach is suggested to create new road projects, including foundation of an act based on the existing Road Act, creation of new road project ideas, development of evaluation process and guidelines, and enhancement of an administrative scheme. To create new road projects, three different ways are devised; (1) designation of national roads having uniqueness in overall spectrum, (2) designation of roads having intrinsic values in a different aspect, (3) designation of single structures of engineering outcomes such as bridges, tunnels, new design techniques, considerable Value Engineering output, and well analyzed Life Cycle Cost Analysis practices. For the evaluation process, NSBP program of USA and/or Sustainable City Award program of Korea would be recommended. An administrative scheme and integrated funding process for the new road projects are also suggested based on evaluation of tasks of each team or division of Korea Ministry of Construction and Transportation.

  • PDF

Evaluation of Performance and Construction the New National Test Road Sites of Modified Asphalt (신설국도의 시험시공을 통한 표층용 개질 아스팔트 공용성 평가)

  • Cho, Gyu-Tae
    • International Journal of Highway Engineering
    • /
    • v.4 no.3 s.13
    • /
    • pp.43-49
    • /
    • 2002
  • Asphalt pavements have to perform under the conditions of heavily-loaded vehicles due to the industrialization and large temperature variance between the summer and the winter. Due to these factors, a characteristics change of early permanent deformation becomes a big issue, and to remedy this problem many research to use modified asphalt are being widely conducted. However, most of the modified asphalt is being paved after milling the surface course and applying tackcoating, and it is being used mostly for the repair and maintenance purpose rather than pavement of new national road. The purpose of this investigation is to obtain some fundamental data for the evaluation of the performance and long-term performance of the construction material mixtures by the laboratory test and field experiments. For the field experiment, 200m of two-lanes national road, that is being paved for the new national road under the direction of Pusan Regional Construction Management Office, was paved with SBS PMA and PSMA asphalt mixtures, which are an modified asphalt mixtures used for the surface course, on top of the base course paved with other modified asphalt mixtures. The remaining section of the new national road was paved with dense grade mixture. The laboratory tests assessed and analyzed the mixture characteristics by Marshall's stability test, strength tests and wheel-tracking test. On the basis of the evaluation result of the temperature control and roughness of the newly constructed road at the field experiment site, it is desired to evaluate and identify the most economic modified asphalt mixtures by long-term performance evaluation and LCC(Life Cycle Cost) analysis in order to apply the test result to the design of new road construction in the future.

  • PDF

Economic Evaluation System for Deteriorated Military Facilities (노후 군시설물의 경제성 평가 시스템)

  • Jang, Won-Suk;Lim, Tae-Kyung;Lee, Dong-Eun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.181-192
    • /
    • 2013
  • Given both structural safety and economic benefits of aging facilities, remodelling of the existing facilities is preferable to reconstruction. This recognition provides an opportunity to reduce the commitment of resources and national budget. However, when a subordinate troop asks for remodeling or reconstruction of a deteriorated facility, it is difficult to ensure the consistency and objectivity in the process of decision making for the alternatives due to the absence of systematic and quantitative rating methodology. Their economic evaluation methodology only exists in a manual format. Thus, further research is required for converting the methodology into an automated system in view of practicality such as rapid and accurate data processing. The contributions of this study are as follows: 1) Literature review found out a representative economic evaluation model focused on military facilities, and comparative analysis with a similar study identified the strength and weakness. 2) this study presented how to convert the theoretical framework which enables to solve a specific subject matter into an automated system. 3) it developed a user friendly interfaces which consist of four functional modules by considering the usability and accessibility of the system user. 4) the developed system was verified by a case study in terms of four kinds of performance indicators.

Analysis of Modeling Errors for BIM-based Facility Management Systems (BIM기반 시설물유지관리시스템을 위한 모델링 오류 분석)

  • An, Hyokyung;Lee, Seulki;Yu, Jungho;Son, Bosik;Jang, Hyounseung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.35-45
    • /
    • 2013
  • Facility Management is the longest in the building of life cycle. Because it occupies more than 80% of cost, the phase of Facility Management has to be managed and has to be perceived as important as design and construction phase. The method to manage building more efficiently is the introduction of Facility Management System used by CAD and database. But information Requirement is now input by hand in the most Facility Management System. This study aims to analyze the example of applying BIM in the Korea or abroad and the errors of this were deducted by many phase. Lastly, the possible solution is suggested in order to be used in the Facility Management System. This study's benchmarking is COBIE which is developed by the COE(Corps of Engineers) and now popular in the world. The suggestion in this study is the method that I have already mentioned is helpful for a designer to do modeling when a designer uses BIM S/W(software). To be more specific, the method plays a side role in helping data input considering the phase of Facility Management.

System Architecture of the Integrated Data Safety Zone for the Secured Application of Transportation-specific Mobility Data (교통 분야 모빌리티 데이터의 안전한 활용을 위한 통합데이터안심구역 시스템 아키텍처 개발)

  • Hyoungkun Lee;Keedong Yoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.22 no.3
    • /
    • pp.88-103
    • /
    • 2023
  • With the recent advancement of 4th Industrial Revolution technology, transportation systems are generating large amounts of mobility data related to the individual movement trajectories of vehicles and people. There are many constraints on utilizing mobility data containing personal information. Thus, in South Korea, the processing and generation of pseudonymized information and the analysis and utilization of this information have been managed in a dual manner by applying separate agencies and technologies through the revision of the Data 3 Act and the enactment of the Data Basic Act. However, this dual approach fails to securely support the entire data lifecycle and suffers from inefficiencies in terms of processing time and cost. Therefore, to compensate for the problems of the existing Expert Data Combination System and Data Safety Zone, this study proposes an Integrated Data Safety Zone Framework that integrates and unifies the process of generating, processing, analyzing, and utilizing mobility data. The integrated process for data processing was redesigned, and common requirements and core technologies were derived. The result is an architecture for a next-generation Integrated Data Safety Zone system that can manage and utilize the entire life cycle of mobility data at one stop.

A Study on the Revitalization of BIM in the Field of Architecture Using AHP Method (AHP 기법을 이용한 건축분야 BIM 활성화 방안 연구)

  • Kim, Jin-Ho;Hwang, Chan-Gyu;Kim, Ji-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.473-483
    • /
    • 2022
  • BIM(Building Information Modeling) is a technology that can manage information throughout the entire life cycle of the construction industry and serves as a platform for improving productivity and integrating the entire construction industry. Currently, BIM is actively applied in developed countries, and its use at various overseas construction sites is increasing This is unclear. due to air shortening and budget savings. However, there is still a lack of institutional basis and technical limitations in the domestic construction sector, which have led to the lack of utilization of BIM. Various activation measures and institutional frameworks will need to be established for the early establishment of these productive BIMs in Korea. Therefore, as part of the research for the domestic settlement and revitalization of BIM, this study derived a number of key factors necessary for the development of the construction industry through brainstorming and expert surveys using AHP techniques and analyzed the relative importance of each factor. In addition, prior surveys by a group of experts resulted in 1, 3 items in level, 2, 9 items in level, and 3, 27 items in level, and priorities analysis was performed through pairwise comparisons. As a result of the AHP analysis, it was found that the relative importance weight of policy aspects was highest in level 1, and the policy factors in level 2 and the cost-based and incentive system introduction factors were considered most important in level 3. These findings show that the importance of the policy guidance or institutions underlying the activation of BIM rather than research and development or corporate innovation is relatively high, and that the preparation of policy plans by public institutions should be the first priority. Therefore, it is considered that the development of a policy system or guideline must be prioritized before it can be advanced to the next activation stage. The use of BIM technologies will not only contribute to improving the productivity of the construction industry, but also to the overall development of the industry and the growth of the construction industry. It is expected that the results of this study can provide as useful information when establishing policies for activating BIM in central government, relevant local governments, and related public institutions.