• Title/Summary/Keyword: Life-Cycle Cost (LCC)

Search Result 319, Processing Time 0.028 seconds

VE/LCC Analysis Models of Breakwaters by Fuzzy Reliability Approach (퍼지 신뢰성 이론에 의한 방파제의 VE/LCC 분석모델)

  • Ahn, Jong-Pil;Park, Ju-Won;Yu, Deog-Chan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.159-167
    • /
    • 2007
  • In this study, the concepts of integrated VE analysis assessment is introduced in order to achieve "Design for Deterioration performance" in design VE phase. For this purpose, a framework for fuzzy reliability based LCC and value analysis model using fuzzy logic based approach for breakwaters Projects is suggested. It is anticipated that the methodology Proposed in this paper can also be utilized in the design and maintenance phase of other facilities where decision making is made for the fuzzy reliability based life cycle cost and value analysis.

A Study on the Correlation between Optimal Safety of Structures and Minimization of Life Cycle Cost(LCC) (구조물의 최적안전지수와 생애주기비용의 상관관계에 관한 연구)

  • Bang, Myung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.94-98
    • /
    • 2014
  • This study was intend to develop the optimal design method of suspension bridge by the reliability analysis based on minimization of life cycle cost(LCC). The reliability analysis was performed considering aleatory uncertainties included in the result of numerical analysis. The optimal design was estimated based on life-cycle cost analysis depending on the result of reliability analysis. As the effect of epistemic uncertainty, the safety index (beta), failure probability (pf) and minimum life cycle cost were random variables. The high-level distributions were generated, from which the critical percentile values were obtained for a conservative bridge design through sensitivity assessment.

Economic Life Assessment of Power Transformer using HS Optimization Algorithm (HS 최적화 알고리즘을 이용한 전력용 변압기의 경제적 수명평가)

  • Lee, Tae-bong;Shon, Jin-geun
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.66 no.3
    • /
    • pp.123-128
    • /
    • 2017
  • Electric utilities has been considered the necessity to introduce AM(asset management) of electric power facilities in order to reduce maintenance cost of existing facilities and to maximize profit. In order to make decisions in terms of repairs and replacements for power transformers, not only measuring by counting parts and labor costs, but comprehensive comparison including reliability and cost is needed. Therefore, this study is modeling input cost for power transformer during its entire life and also the life cycle cost (LCC) technique is applied. In particular, this paper presents an application of heuristic harmony search(HS) optimization algorithm to the convergence and the validity of economic life assessment of power transformer from LCC technique. This recently developed HS algorithm is conceptualized using the musical process of searching for a perfect state of harmony. It uses a stochastic random search instead of a gradient search so that derivative information is unnecessary. The effectiveness of the proposed identification method has been demonstrated through an economic life assessment simulation of power transformer using HS optimization algorithm.

Corrosion-Fatigue Reliability-Based Life Cycle Cost Analysis of High-Speed Railway Steel Bridges (고속철도 강교량의 부식.피로신뢰성 기반 생애주기비용 분석)

  • Jeon, Hong-Min;Sun, Jong-Wan;Cho, Hyo-Nam
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1132-1140
    • /
    • 2007
  • As it recently appears that Life Cycle Cost Analysis may be considered as new methodology for economic valuation of infrastructure many researches have been made to assess LCC(Life Cycle Cost) of each facility based on a reasonable methods. In general, LCC is composed of construction cost and expected maintenance repair cost. And especially, maintenance repair cost must be estimated to enhance the reliability through systematic and reasonable methods. However in Korea, because high speed railway steel bridges are recently constructed no direct statistical data are available for the account of the maintenance cost and then their maintenance characteristics are not linear yet. Therefore, the approach proposed in the paper utilizes a theoretical determination and degradation of the corrosion and fatigue of the bridges based on Rahgozar et al.(2006)'s model on fatigue notch factor considering into the corrosion to incorporate the corrosion effect into the fatigue strength reduction model. And then, the corresponding probability of failure is calculated in terms of the reliability index using S-N curve to formulate the fatigue limit state. Therefore, this paper proposes the minimum Life Cycle Cost through optimum maintenance plan analysis of high-speed railway steel bridges under construction. Finally, this paper reviews the proposed model in oder to confirm the applicability and feasibility by appling it to high speed railway steel bridges under construction

  • PDF

Optimal Design of PSC-I Girder Bridge Considering Life Cycle Cost (생애주기비용을 고려한 PSC-I형 교량의 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.5
    • /
    • pp.48-56
    • /
    • 2009
  • This paper presents the procedure for the optimal design of a PSC-I girder bridge considering life cycle cost (LCC). The load carrying capacity curves for the concrete deck, PSC-I girder and $\pi$-type pier were derived and used for the estimate of service lives. Total life cycle cost for the service life was calculated as sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The advanced First Order Second Moment method was used to estimate the damage cost. The optimization method was applied to the design of PSC-I girder bridge. The objective function was set to the annual cost, which is defined by dividing the total life cycle cost by the service life, and constraints were formulated on the basis of Korean Standards. The optimal design was performed for various service lives and the effects of design factors were investigated.

A Models of Economic Analysis in Safety Diagnosis for Remodeling Strategies of Apartment Housing (공동주택의 리모델링 전략을 위한 안전진단의 경제성분석 모델)

  • Seo Kwang-Jun;Choi Mi-Ra;Shin Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.164-171
    • /
    • 2005
  • The importance of the life cycle cost analysis(LCCA) for apartment housing remodeling projects has been fully recognized over the last decade. Accordingly theoretical models, guidelines, and supporting software systems were developed for the life cycle cost analysis of apartment housing remodeling systems. However, the level of consensus on LCCA results is still low due to the lack of reliable data on remodeling activities for safety diagnosis. in order to predict the reliability based LCCA of the given case, suggested the remodeling strategies level after reviewing other related materials. Apply the real information of the economic index. And based on such analytical measures, remodeling and operation cost and LCC in remodeling strategies level have been predicted; suggests the basic information about remodeling interventions level for the apartment housing. The LCC analysis models and the fuzzy logic based safety assessment presented in this study can greatly contribute to the value-oriented design alternative selection, estimation of the economic analysis, and the allocation of budget for apartm.

Economic Analysis of the Livestock Manure Treatment System Using Life-Cycle Cost Technique (LCC 기법을 통한 가축분뇨처리시설의 경제성 분석)

  • Kim, J.H.;Cho, S.H.;Kwag, J.H.;Choi, D.Y.;Jeong, K.H.;Chung, U.S.;Chung, M.S.;Park, S.K.
    • Journal of Animal Environmental Science
    • /
    • v.17 no.sup
    • /
    • pp.61-68
    • /
    • 2011
  • To assess the total cost with all stages of facilities, the feasibility of Life Cycle Cost (LCC) analysis was examined in this study to estimate the livestock manure treatment system and optimal decision making process. For the economic evaluation, the plant/equipment investment and annual operation cost of four Public Livestock Recycling Facilities, whose treatment capacity is 100 ton piggery manure per day, was compared. The initial cost was in the range of 2,699 million won to 3,202 million won, where T and E methods were highest and lowest, respectively. The annual operation cost was in the level of 378 million to 498 million won, which decreased in the following order : T method > J method > E method > B method. For the LCC analysis, 4.7% of interest rate, 3.13% of inflation rate, and 1.52% of net discount rate was considered by the data received from Bank of Korea and Statics Korea in the period of 2000 to 2009. Also, for the calculation of present value factor, the durable years of civil engineering & construction, machinery and electric instrument was 30 years, 10 years and 15 years, respectively. Based on these consideration, operation cost was in the range of 17,570 won/ton to 20,661 won/ton, and E method (17,570 won/ton) was economical and B method (20,661 won/ton) was non-economical. Though initial cost of T method was higher than that of B method, LCC analysis of T method was lower than that of T method due to the lower operation cost. Therefore, LCC analysis, which considers both initial cost and operation cost, is more reasonable evaluation method than either initial cost or annual operation cost. For the change of LCC analysis according to the uncertainty, the sensitivity analysis was carried out using fluctuation magnitude of discount rate in the period of 2000 to 2009. As a result, LCC analysis evaluated by discount rate was stable for the uncertain factors since the cost leadership did not change even though the sensitivity analysis varied. In summary, the economic evaluation using LCC analysis could be an efficient reference to choose the suitable livestock manure treatment plants. Furthermore, standardization of statement calculation for the actual cost analysis should be conducted and more detailed study is necessary to validate this summary. Therefore, the application of comprehensive technology evaluation, which considers LCC analysis, should contribute in obtaining objectivity and enhancing reliability for the 'Evaluation of Livestock Manure Treatment System and its Technology'.

A Study on the Economical Analysis Model for Asphalt Pavementin Congestion Area of Metropolitan (대도시 혼잡구간의 아스팔트 포장에 대한 경제성 분석 모델 연구)

  • Jo, Byung Wan;Tae, Ghi Ho;Kim, Do Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.771-781
    • /
    • 2006
  • This Study is about the development of LCC Analysis Model and Evaluation of VE. It was carried out to help the person's intention decision about choosing the pavement construction method that can deal with 'Pavement Life Factor' like Area Character and Traffic Volume efficiently, by considering the total life cycle cost of pavement life cycle happens according to the numbers of public use year. For this, we developed the new LCC Analysis Model by using the Data of Seoul city the representative city in Korea, and carried out VE Evaluation that reflects the opinions of specialists. This Analysis Model consists of cost items that affects directly the choice of pavement construction, except for the common cost items of the various pavement construction. And we investigated the propriety by applying our model to the example line that are used for the public at present. About the base data of cost items that are used for our analysis, we enhanced our model's confidence by using the statistics data of Seoul and the standard data of unit cost calculation.

A Study on the Life Cycle Cost Analysis of Railroad Bridges (철도교량의 생애주기비용분석에 관한 연구)

  • Park Mi-Yun;Na Ok-Pin;Hwang Young-Min;Kim Dae-Young;Cho Hyo-Nam
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.574-580
    • /
    • 2005
  • Recently, the number of bridges and tunnels in railway is increasing due to the super high-speedy of train. Also, because of successively accidents of civil structures such as bridges and dams, the importance of maintenance become influential. The purpose of this study is to show the probabilistic life cycle cost analysis technique(PLCC) of the railroad bridge as pubic-infrastructures, and reasonably to indicate the economy in life cycle cost(LCC) through a case study. Rationally for life cycle cost analysis, the data gathered through many materials considered the uncertainty such as covariance. As a result, it is indicated that prestressed concrete bridge is pretty more cost-effective during life-cycle than preflex as well as steel box bridge. In future, if the construction of database and maintenance materials for railroad infrastructure is actualized, the life cycle cost analysis for railroad can be conducted easily and practically.

  • PDF

A Study on the Life Cycle Cost Calculation of the Railroad Vehicle Based on the Maintenance Information (철도차량 유지보수정보를 이용한 수명주기비용 계산 연구)

  • Kim, Jae-Hoon;Jun, Hyun-Kyu;Park, Jun-Seo;Jeong, Hyun-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.88-94
    • /
    • 2009
  • Life cycle costing is one of the most effective approaches for the cost analysis of long-life products such as the railroad vehicle. Life cycle costing includes the cost of concept design, development, manufacture, operation, maintenance and disposal. Especially, life cycle costing in the railroad industry has been focused on the maintenance cost. In this paper, the standard, guide and maintenance information of railroad vehicle were investigated, and the unique corrective and preventive maintenance templates of railroad vehicle were proposed. Maintenance cost of an auxiliary power supply system of EMU was predicted by using the proposed templates. The results show that the preventive maintenance, PM, cost is much higher compare to corrective maintenance, CM, cost because of daily and monthly maintenance tasks which require lots of labor work. It is expected that these templates can help railroad operators make maintenance strategies with consideration of the cost parameter.