• Title/Summary/Keyword: Life cycle estimation

Search Result 282, Processing Time 0.025 seconds

The Development of Korean Life Cycle Impact Assessment Index Based on a Damage Oriented Modeling (한국형 피해산정형 전과정 영향평가 지표 개발)

  • Park, Pil-Ju;Kim, Mann-Young
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.32 no.5
    • /
    • pp.499-508
    • /
    • 2010
  • This study proposed a life cycle impact assessment index that can indicate the environment-related information of the product in monetary value such that the national geographical, environmental, and social features are fully reflected based on a damage-oriented model. First, the estimation process was classified into characterization, damage assessment, and integration stages considering the six biggest impact categories: resource depletion, global warming, ozone depletion, acidification, eutrophication, and photochemical oxidant creation. Moreover, this study came up with the 16 category endpoints related to the 6 impact categories, and the damage function, to the 4 largest safeguard subjects. The integration indices of finally identified impact categories were KRW 21.8/kg Sb, KRW 6.19/kg$CO_2$, KRW 53,000/kg CFC-11, KRW 13,100/kg $SO_2$, KRW 2,310/kg ${PO_4}^{3-}$, and KRW 3,030/kg $C_2H_4$. Using the results of this research, environmental impacts based on the environmental load generated throughout the entire life cycle of a product can serve as a single index in monetary value; thus enhancing understanding and utilization of the results of life cycle impact assessments.

A Model of Time Dependent Design Value Engineering and Life Cycle Cost Analysis for Apartment Buildings (공동주택의 시간의존적 설계VE 및 LCC분석 모델)

  • Seo, Kwang-Jun;Choi, Mi-Ra;Shin, Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.133-141
    • /
    • 2005
  • In the resent years, the importance of VE (value engineering) and LCC (life cycle cost) analysis for apartment building construction projects has been fully recognized. Accordingly theoretical models, guidelines, and supporting software systems were developed for the value engineering and life cycle cost analysis for construction management including large building systems. However, the level of consensus on VE and LCC analysis results is still low due to the lack of reliable data on maintenance. This paper presents time dependent LCC model based value analysis method for rational investment decision making and design alternative selection for construction of apartment building. The proposed method incorporates a time dependent LCC model and a performance evaluation technique by fuzzy logic theory to properly handle the uncertainties associated with statistics data and to analyze the value of alternatives more rationally. The presented time dependent VE and LCC analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to design value engineering alternative selection, the estimation of the life cycle cost, and the allocation of budget for apartment building construction projects.

The Present Status and Vision of Virtual Construction System Development (가상 건설 시스템 개발 현황과 비전)

  • Kim, Jae-Jun;Choi, Cul-Ho;Shin, Hyun-Mok;Jin, Sang-Yoon;Lee, Kwang-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.170-175
    • /
    • 2008
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

Study on Estimation Methods of Life Cycle GHGs Emission for the Mine Reclamation Project (광해방지사업의 전과정 온실가스 배출량 산정방법에 대한 연구)

  • Kim, Soo-lo;Kwak, In-Ho;Wie, Dae-Hyung;Park, Kwang-ho;Baek, Seung-Han
    • Economic and Environmental Geology
    • /
    • v.54 no.6
    • /
    • pp.733-741
    • /
    • 2021
  • Globally, in accordance with the goals set forth in the 2015 Paris Climate Agreement, each country has established and declared a reduction target for carbon neutrality by 2050. The roadmaps for establishing long-term greenhouse gas emissions development strategies and setting reduction targets have been announced. As the international community accelerates the transition to the net-zero society, 128 countries have declared net-zero by the end of 2020, and the net-zero declaration continues to expand around G20 member states. In December 2020, Korea announced the "2050 Net-zero Strategy" to establish a foundation for simultaneously achieving carbon reduction, economic growth, and improved quality of life for the people through active response to the net-zero, and pursuing policy tasks in stages to do this. Comprehensive carbon management is insufficient due to the lack of comprehensive carbon management due to the departure from the areas of mandatory reduction, such as the GHG energy target management system and the GHG emissions trading offset system implemented to reduce greenhouse gases in Korea. Currently, there is no cases for estimation or calculation of carbon dioxide emissions for the Mine Reclamation projects. It is reviewed the standard methods proposed by domestic and foreign carbon emission calculation methods and proposed appropriate carbon emission estimation methods for the Mine Reclamation projects in this study.

A Study on the Mid-Long Term Direction for Development of Software Cost Estimation Guidelines (소프트웨어 사업대가기준 중장기 발전 방향에 관한 연구)

  • Kim, Woo-Je;Kwon, Moon-Ju
    • The Journal of Society for e-Business Studies
    • /
    • v.15 no.1
    • /
    • pp.139-155
    • /
    • 2010
  • The purpose of this paper is to develop a framework of software cost estimation guidelines and to derive a mid-long term direction for development of the software cost estimation guidelines. In this paper, all the steps in the software life cycle are researched in the view of cost estimation, and current software cost estimation guidelines and models have been reviewed and analysed first. Second, a plan to separate unit cost per function point from standard procedure in current software cost estimation guidelines is presented to strengthen maket self-regulating function as a mid-long term developmental direction for software cost estimation guidelines. Third, construction of cost repository, making standard procedure for software cost estimation guidelines, development of various kinds of software cost estimation models, and a system for experts on software cost estimation are presented as the prerequisites for the future model framework of software cost estimation guidelines. Finally a roadmap for establishing the future model is proposed.

A Models of Economic Analysis in Safety Diagnosis for Remodeling Strategies of Apartment Housing (공동주택의 리모델링 전략을 위한 안전진단의 경제성분석 모델)

  • Seo Kwang-Jun;Choi Mi-Ra;Shin Nam-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.164-171
    • /
    • 2005
  • The importance of the life cycle cost analysis(LCCA) for apartment housing remodeling projects has been fully recognized over the last decade. Accordingly theoretical models, guidelines, and supporting software systems were developed for the life cycle cost analysis of apartment housing remodeling systems. However, the level of consensus on LCCA results is still low due to the lack of reliable data on remodeling activities for safety diagnosis. in order to predict the reliability based LCCA of the given case, suggested the remodeling strategies level after reviewing other related materials. Apply the real information of the economic index. And based on such analytical measures, remodeling and operation cost and LCC in remodeling strategies level have been predicted; suggests the basic information about remodeling interventions level for the apartment housing. The LCC analysis models and the fuzzy logic based safety assessment presented in this study can greatly contribute to the value-oriented design alternative selection, estimation of the economic analysis, and the allocation of budget for apartm.

Development of Korean Life Cycle Cost Analysis Model for Road Pavement Asset Management (도로포장자산관리를 위한 한국형 생애주기비용 모형 개발)

  • Han, Daeseok;Do, Myungsik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1639-1650
    • /
    • 2013
  • Road pavement management is an important activity that affects to national economy, movement and safety of people, and also demands huge amount of budget. Therefore, its management strategy must be established under objective information. In addition, decision support system that produces the management strategy needs to consider practical benefits from various aspects. Considering these aspects, this paper aimed to develop a customized Korean life cycle cost analysis model estimating various effects on road users and socio-environmental costs based on pavement condition. The suggested LCCA model focused on Korean national highway, and tried to adopt a national guideline recommended by Korean government for securing credibility of estimation results. In the development processes, some of the suggestions that do not fit well in the situations of pavement management field were added, altered, or partially modified. These attempts to develop customized asset management system would be an important step to break away from passive attitudes relying on ready-made software, but also to improve awareness about the social benefits from the better maintenance strategy.

A Study on Railway Transportation Business Cost Estimation & Decision Supporting Methods using Simulation Data (시뮬레이션을 활용한 철도교통사업 비용 추산 및 의사결정 지원 방법 연구)

  • Chang, Suk;Nam, Do Woo;Sim, Jeong Hwan;Kim, Dong Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.29 no.4
    • /
    • pp.85-94
    • /
    • 2020
  • In determining the feasibility of planning and launching railway transportation projects, various decision-making processes are essentially required. LCC(Life Cycle Cost) value including total construction cost and operation cost is estimated in approximation Model with rough guideline. In this study, modeling and simulation-based analysis method is proposed to support the decision making process of railroad transportation and derivation of LCC. Firstly, cost analysis model was constructed by collecting various existing rail transportation business data to enable analyze based on numerical data, and the result were analyzed by DOE(Design Of Experiments) and RSM (Response Surface Method) simulation. Professional commercial software tools were used for effective model construction and simulation. In order to verify the research results, the actual railroad transportation projects were selected, and the results of the analysis were compared.

A Model for Software Maintenance Cost Estimation based on Productivity (생산성 기반의 소프트웨어 유지보수 대가산정 모델)

  • Bae, Joon-Soo
    • IE interfaces
    • /
    • v.17 no.spc
    • /
    • pp.122-130
    • /
    • 2004
  • Since the cost of software maintenance occupies about 50~75% in a general successful organization, the software maintenance plays an important role in software life cycle. In particular, if the managed system needs to be operated in a long term or the system is very large and complex, then the maintenance is especially more important. Software maintenance is defined as software modification activities after customer delivery, such as improvement of performance or functionality, error correction, adaptation to environmental changes, etc. In this paper, software cost estimation models are proposed, that is based on productivity of manpower in maintenance projects. In order to do this, the activities of maintenance are classified into function change, non-function change, user support and application operation. The proposed models are constructed and verified based on the real size and cost information of projects in the real world. The approach in this paper is to discriminate the heterogeneous activities in maintenance projects, and then to calculate the respective cost of each discriminated activity. By using the proposed models, the total cost of maintenance project is summed from the costs of four activities. In addition the number of conflicts between owner and order receiver about the amount of cost will be reduced and the reasonable cost estimation system will be established.

Life Cycle Cost Estimation for Jangbogo-II Submarines based on Modeling and Simulation Methodologies (M&S기법을 활용한 장보고 II급 잠수함 수명주기비용 추정)

  • Ahn, Jae-Kyoung;Choi, Bong-Wan;Lee, Yong-Kyu
    • IE interfaces
    • /
    • v.23 no.3
    • /
    • pp.221-228
    • /
    • 2010
  • With the development of science and technology, modern submarines are equipped with high technology devices and multi-functioned precise armaments, consequently, acquisition cost as well as maintenance cost of the submarines are getting higher and higher. However, tight defense budget forces navy to significantly reduce military operating and maintenance costs. In this study, the maintenance and operating costs of submarine Jangbogo-II are estimated through M&S (Modeling and simulation) methodologies in order to reasonably and consistently work out the requirement verification system of Jangbogo-II. The maintenance and operating costs of Jangbogo-II along the next 25 years are estimated as 312.65 billion won via engineering analysis methods while 312.69 billion won from PRICE Model, which shows only 0.04 billion won differences as a whole. This study is expected to be able to provide meaningful decision making data for not only short and/or mid term operating planning but military budgeting.