• Title/Summary/Keyword: Level Assessment

Search Result 5,487, Processing Time 0.035 seconds

Research on the development of green chemistry technology assessment techniques: a material reutilization case

  • Hong, Seokpyo;Ahn, Kilsoo;Kim, Sungjune;Gong, Sungyong
    • Environmental Analysis Health and Toxicology
    • /
    • v.30 no.sup
    • /
    • pp.2.1-2.11
    • /
    • 2015
  • Objectives This study presents a methodology that enables a quantitative assessment of green chemistry technologies. Methods The study carries out a quantitative evaluation of a particular case of material reutilization by calculating the level of "greenness" i.e., the level of compliance with the principles of green chemistry that was achieved by implementing a green chemistry technology. Results The results indicate that the greenness level was enhanced by 42% compared to the pre-improvement level, thus demonstrating the economic feasibility of green chemistry. Conclusions The assessment technique established in this study will serve as a useful reference for setting the direction of industry-level and government-level technological R&D and for evaluating newly developed technologies, which can greatly contribute toward gaining a competitive advantage in the global market.

Characteristics of the Graded Wildlife Dose Assessment Code K-BIOTA and Its Application (단계적 야생동식물 선량평가 코드 K-BIOTA의 특성 및 적용)

  • Keum, Dong-Kwon;Jun, In;Lim, Kwang-Muk;Kim, Byeong-Ho;Choi, Yong-Ho
    • Journal of Radiation Protection and Research
    • /
    • v.40 no.4
    • /
    • pp.252-260
    • /
    • 2015
  • This paper describes the technical background for the Korean wildlife radiation dose assessment code, K-BIOTA, and the summary of its application. The K-BIOTA applies the graded approaches of 3 levels including the screening assessment (Level 1 & 2), and the detailed assessment based on the site specific data (Level 3). The screening level assessment is a preliminary step to determine whether the detailed assessment is needed, and calculates the dose rate for the grouped organisms, rather than an individual biota. In the Level 1 assessment, the risk quotient (RQ) is calculated by comparing the actual media concentration with the environmental media concentration limit (EMCL) derived from a bench-mark screening reference dose rate. If RQ for the Level 1 assessment is less than 1, it can be determined that the ecosystem would maintain its integrity, and the assessment is terminated. If the RQ is greater than 1, the Level 2 assessment, which calculates RQ using the average value of the concentration ratio (CR) and equilibrium distribution coefficient (Kd) for the grouped organisms, is carried out for the more realistic assessment. Thus, the Level 2 assessment is less conservative than the Level 1 assessment. If RQ for the Level 2 assessment is less than 1, it can be determined that the ecosystem would maintain its integrity, and the assessment is terminated. If the RQ is greater than 1, the Level 3 assessment is performed for the detailed assessment. In the Level 3 assessment, the radiation dose for the representative organism of a site is calculated by using the site specific data of occupancy factor, CR and Kd. In addition, the K-BIOTA allows the uncertainty analysis of the dose rate on CR, Kd and environmental medium concentration among input parameters optionally in the Level 3 assessment. The four probability density functions of normal, lognormal, uniform and exponential distribution can be applied.The applicability of the code was tested through the participation of IAEA EMRAS II (Environmental Modeling for Radiation Safety) for the comparison study of environmental models comparison, and as the result, it was proved that the K-BIOTA would be very useful to assess the radiation risk of the wildlife living in the various contaminated environment.

A Study on the Implication of Sustainability and Environmental Assessment (지속가능성과 환경평가의 연계에 관한 연구)

  • Hong, Sang-Pyo
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.3
    • /
    • pp.269-279
    • /
    • 2011
  • Sustainability assessments tend to integrate ecological, social, and economic concerns. Sustainability assessment could be considered the highest rung in the assessment ladder. Broad strategies that seek to integrate individual SEA(Strategic Environmental Assessment) could be subjected to a sustainability assessment. Sustainability assessment could incorporate global and transboundary effects and priorities into SEA and project-level EIA(Environmental Impact Assessment). SEA could provide an environmental context and direction for project-level EIA. Procedural and substantive EIA requirements can be addressed through tiering such as sustainability assessment, SEA, project-level EIA. In Korea, PERS(Prior Environmental Review System) that has been utilized to evaluate administrative plans related with various kinds of development projects should be evolved not only to incorporate environmental impacts into early stage decision-making, but also to implicate sustainability assessments that include social equity and economic efficiency. Integration of SEA and sustainability assessment can be initiated through the application of DPSIR (Driving Force - Pressure - State - Impact - Response ) framework that was developed by European Environmental Agency.

Analysis on the Risk-Based Screening Levels Determined by Various Risk Assessment Tools (III): Proposed Methodology for Lead Risk Assessment in Korea (다양한 위해성평가 방법에 따라 도출한 토양오염 판정기준의 차이에 관한 연구(III): 우리나라 납 오염 위해성평가 방법 제안)

  • Jung, Jae-Woong;Nam, Kyoungphile
    • Journal of Soil and Groundwater Environment
    • /
    • v.20 no.6
    • /
    • pp.1-7
    • /
    • 2015
  • The most critical health effect of lead exposure is the neurodevelopmental effect to children caused by the increased blood lead level. Therefore, the endpoint of the risk assessment for lead-contaminated sites should be set at the blood lead level of children. In foreign countries, the risk assessment for lead-contaminated sites is conducted by estimating the increased blood lead level of children via oral intake and/or inhalation (United States Environmental Protection Agency, USEPA), or by comparing the estimated oral dose to the threshold oral dose of lead, which is derived from the permissible blood lead level of children (Dutch National Institute for Public Health and the Environment, RIVM). For the risk assessment, USEPA employs Integrated-Exposure-Uptake-Biokinetic (IEUBK) Model to check whether the estimated portion of children whose blood lead level exceeds 10 µg/dL, threshold blood lead level determined by USEPA, is higher than 5%, while Dutch RIVM compares the estimated oral dose of lead to the threshold oral dose (2.8 µg/kg-day), which is derived from the permissible blood lead level of children. In Korea, like The Netherlands, risk assessment for lead-contaminated sites is conducted by comparing the estimated oral dose to the threshold oral dose; however, because the threshold oral dose listed in Korean risk assessment guidance is an unidentified value, it is recommended to revise the existing threshold oral dose described in Korean risk assessment guidance. And, if significant lead exposure via inhalation is suspected, it is useful to employ IEUBK Model to derive the risk posed via multimedia exposure (i.e., both oral ingestion and inhalation).

Integrated Level 1-Level 2 decommissioning probabilistic risk assessment for boiling water reactors

  • Mercurio, Davide;Andersen, Vincent M.;Wagner, Kenneth C.
    • Nuclear Engineering and Technology
    • /
    • v.50 no.5
    • /
    • pp.627-638
    • /
    • 2018
  • This article describes an integrated Level 1-Level 2 probabilistic risk assessment (PRA) methodology to evaluate the radiological risk during postulated accident scenarios initiated during the decommissioning phase of a typical Mark I containment boiling water reactor. The fuel damage scenarios include those initiated while the reactor is permanently shut down, defueled, and the spent fuel is located into the spent fuel storage pool. This article focuses on the integrated Level 1-Level 2 PRA aspects of the analysis, from the beginning of the accident to the radiological release into the environment. The integrated Level 1-Level 2 decommissioning PRA uses event trees and fault trees that assess the accident progression until and after fuel damage. Detailed deterministic severe accident analyses are performed to support the fault tree/event tree development and to provide source term information for the various pieces of the Level 1-Level 2 model. Source terms information is collected from accidents occurring in both the reactor pressure vessel and the spent fuel pool, including simultaneous accidents. The Level 1-Level 2 PRA model evaluates the temporal and physical changes in plant conditions including consideration of major uncertainties. The goal of this article is to provide a methodology framework to perform a decommissioning Probabilistic Risk Assessment (PRA), and an application to a real case study is provided to show the use of the methodology. Results will be derived from the integrated Level 1-Level 2 decommissioning PSA event tree in terms of fuel damage frequency, large release frequency, and large early release frequency, including uncertainties.

Assessment System of Safety Level of High Voltage Electrical Facilities Considering Environmental Factors (환경영향 요소를 고려한 특고압 전기설비의 안전등급 평가시스템)

  • Kim, Dong-Woo;Lim, Young-Bea;Lee, Ki-Yeon;Moon, Hyun-Wook
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.1
    • /
    • pp.249-254
    • /
    • 2017
  • This paper presents an assessment system of safety level of 22.9kV grade high voltage electrical facilities considering environmental factors. The assessment system was developed based on the following procedure. Firstly, assessment structure was determined by consulting standards regarding inspection and diagnosis of electrical facilities. Secondly, contents of items and sub items of assessment system were developed. Thirdly, in order to quantify the importance of the assessment system, the weight was calculated using Analytic Hierarchy Process(AHP). Lastly, assessment table of safety level was developed including environmental factors such as period of use and load factor. The developed system can evaluate the safety level of high voltage facilities in an objective way. Therefore it can be applicable to electrical safety management system based on Internet of Things(IoT).

Reflections on Framework for Mathematics Assessment in Realistic Mathematics Education -Focusing on Jan de Lange's Framework- (RME의 수학 학습 평가틀에 대한 고찰 -Jan de Lange의 수학 학습 평가틀을 중심으로-)

  • Chong Yeong Ok
    • Journal of Educational Research in Mathematics
    • /
    • v.14 no.4
    • /
    • pp.347-366
    • /
    • 2004
  • Recently, there have been many assessment researches in Korea. The aim of this study is to reflect on framework for mathematics assessment in RME which is based on Jan de Lange's assessment theory and to induce desirable directions for our mathematics assessment in nation-level and class-level. In order to attain these purposes, the present paper reflects the philosophy of RME, Jan de Lange's framework for mathematics assessment, assessment framework of the unit 'Side Seeing', one of Mathematics in Context textbook series, as an exemplar to which Jan de Lange's framework is applied. Based on these reflections, it is discussed that it needs to specify achievement standards presented in mathematics curriculum more particularly in order to have framework including mathematical abilities of level 2 and level 3 in Jan de Lange's framework appropriate to our situations, to apply the framework to nation-level and class-level consistently, and to enhance abilities of teachers and student teachers for mathematics assessment.

  • PDF

An Information Technology Usage Level Assessment Model for Service Industry (서비스산업의 IT활용수준 평가모델 개발)

  • Kim, Hyun-Soo
    • Journal of Information Technology Services
    • /
    • v.7 no.1
    • /
    • pp.255-274
    • /
    • 2008
  • The purpose of this research is to develop an information technology (IT) usage level assessment model for service industry. It is necessary to develop an assessment model for service industry's IT usage to improve service productivity. However, it is not easy to develop assessment models due to service industry's diversity. In this paper a generic IT usage assessment model for service industry has been developed and validated through a descriptive approach. Key factors affecting service productivity have been identified and analysed. A pilot test on IT usage level has been performed to investigate the relevance and importance of IT usage indicators (factors). As a result, a set of effective IT usage indicators for service industry have been found. A short-cut model and a full scale model have been proposed for efficient and effective usage. The results of this study can be used for enhancement of service industry productivity through the increase of IT usage level.

A two-step interval risk assessment method for water inrush during seaside tunnel excavation

  • Zhou, Binghua;Xue, Yiguo;Li, Zhiqiang;Gao, Haidong;Su, Maoxin;Qiu, Daohong;Kong, Fanmeng
    • Geomechanics and Engineering
    • /
    • v.28 no.6
    • /
    • pp.573-584
    • /
    • 2022
  • Water inrush may occur during seaside urban tunnel excavation. Various factors affect the water inrush, and the water inrush mechanism is complex. In this study, nine evaluation indices having potential effects on water inrush were analysed. Specifically, the geographic and geomorphic conditions, unfavourable geology, distance from the tunnel to sea, strength of the surrounding rock, groundwater level, tidal action, cyclical footage, grouting pressure, and grouting reinforced region were analysed. Furthermore, a two-step interval risk assessment method for water inrush management during seaside urban tunnel excavation was developed by a multi-index system and interval risk assessment comprised of an interval analytic hierarchy process, fuzzy comprehensive evaluation, and relative superiority analysis. The novel assessment method was applied to the Haicang Tunnel successfully. A preliminary interval risk assessment method for water inrush was performed based on engineering geological conditions. As a result, the risk level fell into a risk level IV, which represents a section with high risk. Subsequently, a secondary interval risk assessment method was performed based on engineering geological conditions and construction conditions. The risk level of water inrush is reduced to a risk level II. The results agreed with the current tunnel situation, which verified the reliability of this approach.