Magazine of the Korean Society of Agricultural Engineers
/
v.40
no.6
/
pp.79-88
/
1998
This study was conducted to measure the moisture content of soil using RF impedance in the range of 1 to 30MHz. Considering the water potential flow in the soils, two types of sensor such as parallel cylinder and perpendicular plate type were fabricated and tested. The capacitance and resistance of sonsors for soil samples having moisture content range of 2 to 27% were measured by Q-meter (HP4342). The higher soil moisture content was and the larger soil bulk density was, the more the capacitance of sensors increased. To eliminate the effect of bulk density on measuring soil moisture content using RF impedance, two kinds of model having the density independent functions such as the ratio of capacitance change to conductance change and weight of water and dry soils respectively were developed and estimated by regression analysis.
This paper presents new service restoration algorithm to deal with multiple faults such as main transformer fault, whole substation fault and simultaneous faults. The most important consideration of restoration planning for multiple outage areas is efficient use of redundant backup feeders. The proposed algorithm tries to restore all outage loads using outage area ordering method and tie switch exchange method that are newly proposed in this paper.
Ha, Bok-Nam;Seol, Ieel-Ho;Jung, Mi-Ae;Shin, Ick-Su;Lee, Heung-Ho
Proceedings of the KIEE Conference
/
2003.07a
/
pp.427-429
/
2003
The reliability performance of distribution networks will be enhanced with the installation of application programs including feeder reconfiguration program for loss minimization and optimization of system capacity. Although the basic functions of remote monitoring and remote control provide no measurable cost benefit the suite of application programs developed and now being commissioned by KEPCO, the future will continue to offer this utility with substantial savings in system operational costs, improve system reliability and customer service.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.49
no.4
/
pp.143-151
/
2000
Electric power distribution feeders are susceptible to faults caused by a variety of situations such as adverse weather conditions, tree contacts, equipment failure, accidents, etc. Distribution circuit faults result in a number of problems related to the reliability of service and customer power quality. In the distribution line, the permanent interruption of customer service resulting from a blown fuse or a recloser lockout was the only factor which was used to determine service reliability. On underground distribution line, the serving of cables by earth-moving equipment is a prevalent cause of faults and the most cable faults quickly develop into bolted current. we introduce th multi-circuit breaker coordination methods in the Underground Distribution Line.
The second project of the development of distribution automation system was started recently in Korea. We will use two algorithms for feeder automation in this project. The one is Yes/No logic and it will be applied in large city. Yes/No logic determined the faulty section by fault current following information of the fault indicators of each switches. The other is automatic closing process of switches, and it will be applied in rural area. In the latter method, each switches close systematically, and it can find and separate the faulty section, the computer system treats only the feeder reconfiguration finally.
F.I(Fault Indicator) is equipped in automatic switchs for Distibution Automation System(DAS), and plays important role of providing the information for picking out a fault section. The restrictive sentence that F.I doesn't react for the inrush current is in the F.I specification. Nevertheless F.I has sometimes mal-functioned on the DAS in Kang-Dong branch office of KEPCO for latest 2 years. This Paper Proved the causes of the mal-function, and proposed the new F.I specification and operation methods against the mal-function causes.
The TC curve of recloser which used in KEPCO's distribution line is a little different in a pattern with the TC curve of sub-station OCR. So it sometimes fails in protection coordination. And the recloser sometimes does mis-open/close owing to the inrush current of CB reclosing when a fault occurred on the source-side of the recloser. The mis-open/close is another trouble maker. This Paper Present a new delay TC curve of recloser which has the same pattern with the TC curve of OCR, and a new instantaneous TC curve of recloser which doesn't mal-function to the inrush current. In addition, this paper present another two TC curves for the serial positioning of 2 reclosers. So we accomplished the simple protection coordination of OCR-recloser-fuse.
Electric power distribution feeders are susceptible to faults caused by a variety of situations such as adverse weather conditions, tree contacts, equipment failure, accidents, etc. Distribution circuit faults result in a number of problems related to the reliability of service and customer power quality. In the past, the permanent interruption of customer service resulting from a blown fuse or a recloser lockout was the only factor which was used to determine service reliability. So we developed KODAS(Korea Distribution Automation System) with successful and had fieid-testing of Distribution Automation System in last three years at Kang-dong Branch Office. In performing the project, KEPRI has gained valuable experience, through dealing with many difficult problem. This paper is depicted about the circuit breaker coordination problems in the Underground for the Distribution Automation Feeder.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.1
/
pp.1-6
/
2012
Five smart grid projects was started with large scale at Jeju Island in South Korea from 2009, and smart-grid test-bed was started in Nov. 2010. The five projects are Smart Power Grid (SPG), Smart Renewable (SR), Smart Transportation (ST), Smart Place (SP) and Smart Electric Service (SES). Korea government constructed the smart grid public relations center at Nov. 2010 in Jeju Island and there will be continued the field operation and interface testing among five smart gird projects until May. 2013.
Kim, June-Ho;Lim, Hee-Taek;Yu, Nam-Cheol;Lim, Il-Hyung;Choi, Myeon-Song;Lee, Seung-Jae;Ha, Bok-Nam
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.11
/
pp.2079-2088
/
2009
The optimal operation in distribution system is to select tie switches considering important elements(Load balance, Loss minimization, Voltage drop, Restoration index..) in distribution system. Optimal Tie Switches Selection is very important in operation of distribution system because that is closely related with efficiency and reliability. In this paper, a new algorithm considering important elements is proposed to find optimal location of tie switches. In the case study, the proposed algorithm has been testified using real distribution network of KEPCO for verifying algorithm and complex network for applying future distribution network.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.