• Title/Summary/Keyword: Lease cost

Search Result 70, Processing Time 0.023 seconds

A Study on development of Assesment System for BTL Project;Prediction of Reasonable Construction and Maintenance Cost in Education Facilities. (합리적 교육시설물 유지보수 및 공사비 예측을 위한 BTL 적격성 평가 시스템 개발에 관한 연구)

  • Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.111-116
    • /
    • 2006
  • The objective of this research is to develop an assesment system for BTL Project. A new method for the prediction of construction and maintenance cost in the educational facilities has been considered and under development by the authors. This paper explains the current BTL assesment method used by most local district office of education and lists its potential problems. Main conceptual modules in the new Assesment System are shown in this paper. Also, viable results of each module are discussed in this paper.

  • PDF

Development of Maintenance Management System Module in BTL Project for Educational Facilities (교육시설물 BTL 사업의 유지관리 시스템 모듈 개발)

  • Lee, Eun-Dong;Son, Jae-Ho;Kim, Jae-On
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.132-141
    • /
    • 2007
  • According to the public information of the Ministry of Education & Human Resources Development, the construction project of educational facilities from 2005 to 2007 will use BTL (Build-Transfer-Lease) contract. Budget of those projects will be the worth over 13 trillion won. In this research, the estimation standards for the public health maintenance expenses are established which is the part of the operation and maintenance cost in the total BTL project cost. Also, a system core module using the developed standard was introduced in this paper. A comparative analyses were conducted with the several possible estimation case to validate the system developed.

A Case Study on the Improvement Plan for Cost Prediction of Educational BTL Project based on Running Cost Analysis (교육시설 BTL사업의 유지관리비용 비교분석을 통한 비용추정 개선방안에 관한 사례연구)

  • Park, Moon-Sun;Song, Chang-Youg;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.139-149
    • /
    • 2007
  • The purpose of this study is to examine the problem of BTL(Build Transfer Lease) projects through comparative analysis on running costs, focusing on primary school, junior and senior high school education facilities, and then to provide useful information on the estimation of running costs by suggesting valid cost criteria. For this, eight schools from A and B consulting firms were sampled from capital region and other areas. Sampled schools were classified into four categories according to school grade, and running cost data are collected and analyzed from relative view points. The results of this study are as follows: 1) running costs which are analyzed by categories show some difference among sub-items, 2) major problems related to running cost prediction of BTL projects are revealed and improvement schemes are suggested for two groups (Owner and Project applicants).

Comparative Analysis between GDP Deflator Method and Index Adjustment Rate Method on BTL Sewer Rehabilitation Projects in Jeju (제주도 내 하수관거정비 BTL사업의 GDP 디플레이터 방식과 지수조정률 방식과의 비교 분석)

  • Yang, Du-Suck;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.1
    • /
    • pp.217-227
    • /
    • 2015
  • This study conducted case studies in order to suggest the improvement of GDP (Gross Domestic Product) deflator method which is adopted on calculating fluctuation rate on BTL (Build-Transfer-Lease) sewer rehabilitation projects in Jeju. As a result, because GDP deflator method calculates fluctuation rate by each quarterly, the fluctuation rate of GDP deflator method is higher than it of index adjustment rate method. And GDP deflator method cannot reflect real price because of applying fixed index in whole construction cost for calculating fluctuation rate. Especially, the notification day - the base point influences fluctuation rate and fluctuation amount strongly in GDP deflator method.

A Study on Development of Maintenance Cost Estimation System for BTL Project of Education Facilities Using Optimization Methodology (최적화기법을 활용한 교육시설물 BTL 사업 운영관리비용 비용예측 시스템 개발 기초연구)

  • Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jea-On
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.45-57
    • /
    • 2009
  • BTL (Build-Transfer-Lease) Project for Education Facilities are contracted as a package which consists of several education facilities. The general maintenance period of BTL project for education facilities is 20 years. Thus, total cost variation largely depends on the accuracy of the maintenance cost forecasting in the early stage in the life cycle of the BTL Project. This research develops a cost forecasting system using complete linkage algorithm and branch & bound algorithm to help in finding optimal bundling combination. This system helps owner's decision-making to estimate the total project cost with various constraints changing. The result of this research suggests more reasonable and effective forecasting model for the maintenance facilities package in the BTL project.

A Survey on the Persons in Charge for Economic Estimation Analysis and Improvement of BTL Projects (BTL사업의 경제성 평가 현황조사 및 개선을 위한 실무자 설문조사연구)

  • Lee, Chun-Kyong;Cho, Bong-Ho;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.73-80
    • /
    • 2007
  • As BTL(Build-Transfer-Lease) private investment business benchmarking PHI(Private Finance Initiative) of USA and Japan is introduces to Korea since 2005, as a part of supplying high leveled public service and early expanding required facilities for SOC, Value for Money on private investment business from treasury investment business at the beginning gets to be needed. Accordingly, this survey has been conducted in order to analyse BTL projects status, propriety of economic analysis method(VFM analysis, calculation of estimated business expenses, valuation of bidding price, etc.) by business advance phases from the viewpoint of person in charge, necessity of improvement and alternative plants. As the result of conducting cross tabulation analysis and correlation analysis by occupational group, BTL project advance phases and alternative plans for improvement, it is necessary ye prepare standardized service level against business expense and basis for calculating and evaluation operation expenses. Based on the necessity of quantitative analysis (LCC analysis) of VFM, standard for calculating management, maintenance and administration expenses is required. In addition, reliable economic valuation system considering domestic BTL environment should be setup, for business efficiency.

Development of Evaluation Methodology on the Performance of BTL Sewer Rehabilitation Projects (하수관거정비 BTL사업의 효과분석 및 방안 수립 연구)

  • Song, Ho-Myeon;Cho, Jeong-Il;Ahn, Choong-Hee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.6
    • /
    • pp.743-751
    • /
    • 2010
  • It requires an interim performance assessment for BTL business of the sewerage rehabilitation which continues from 2005 till now. Means, It is necessary to make an interim performance assessment and an analysis of an business effect of the sewerage rehabilitation BTL projects which still continues, and we presented an improvement method of the new sewerage rehabilitation project in future. This paper has conducted an analysis of the business effect for 3 local government BTL projects which are completed and under operation as of now in Jincheon-Gun, Cheongju-Si and Gangjin-Gun. As a method of business effect analysis, we conducted a business effect of the 3 places using the index set which we previously set for the business effect analysis. The index set in this research was sectionalized to an improvement effect of operating wastewater treatment plant, an benefit effect of the direct cost, an benefit effect of the indirect cost and an environment friendly effect. We, in this paper, conducted an business effect analysis for 3 sewerage rehabilitation BTL projects which are completed or under operation recently as a demonstration, however we judge that an business effect analysis shall be conducted in a stage that a significant time for operation has passed since the completion of the construction in order to induce an actual business effect of the sewerage rehabilitation BTL project.

Development of Cam Die for Processing Four Lateral Switch Box (스위치 박스 4측면 가공용 캠금형 개발)

  • 김세환
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.4 no.3
    • /
    • pp.121-125
    • /
    • 2003
  • A switch box is metal box for electric wire pipes in building. In manufacturing this box, the first press is used to mold and the second to fifth presses are used to process four-sides of a box. So four presses, four molds and four workers are needed. This leads to raise the manufacturing cost including machine lease rent, molding fee, and wages. To make matters worse, the roaring sound, vibration, and dangers of safety accidents make employees avoid from working that job. To solve this problem, a new Handling Mechanism and a cam die which combined four-die-involving processes into one die process were developed. That results job automation of the Job with one press and one die. The job avoidance problem is solved and manufacturing cost is reduced as well.

  • PDF

하청형 중소기업의 전략적 기업혁신 -기술베이스의 동태적 다각화를 중심으로 -

  • 류태수
    • Journal of Technology Innovation
    • /
    • v.8 no.2
    • /
    • pp.97-117
    • /
    • 2000
  • TOEM strategy is widely used in Japan and Korea because of the diverse advantages such as cost sharing, technology transfer, equipment lease and base technology acquisition between parent company and OEM supplier. There are, however, some disadvantages that (1)OEM suppliers are likely to be reactive to environmental changes and (2) may have difficulty in building competitive position and long-term growth. When the parent company relocates its plant to foreign countries to achieve lower labor cost or to enhance value added this change will affect directly the OEM supplier's outcome. The parent company's divestiture from existing businesses will also affect the OEM supplier. For the OEM supplier to survive in face of these strategic changes it must enter the new countries with the parent company. Alternatively, the OEM supplier must actively diversify its technologies based on its core capabilities of existing product and process technologies and seek new business arenas. The strategy of aligning its businesses with the parent company's new business strategy allows the OEM supplier to share the new market while it requires the OEM supplier to develop core capabilities. In Korea many small and medium sized OEM suppliers are dependent on a few large companies. For the industry structure in Korea where industry concentration is extremely high OEM suppliers should move away from the past strategy, where they are dependent on the parent company's low profitability businesses. They should actively enter new businesses for which parent companies enter to achieve long-term growth.

  • PDF

A Study of Servitization Strategy for Electric Vehicles

  • Lee, Sang-Hyun
    • Journal of Distribution Science
    • /
    • v.14 no.9
    • /
    • pp.5-13
    • /
    • 2016
  • Purpose - This study proposes a framework for service innovation strategy to cope with the emergence of electric vehicles. Research design, data, and methodology - This study designs an electric-vehicle lease program and collects the resulting data to analyze. By analyzing the previous studies on the electric-vehicle market with cases, a theoretical framework based on existing theories is to be set. Results - This study proposes a strategy for the rapid diffusion of electric vehicles. First, a partitioned-pricing system is proposed to create an advantage for electric vehicles in terms of initial purchasing cost relative to traditional internal combustion vehicles. Second, focusing on reducing switching costs is important because electric vehicles have relatively low resale values due to the uncertainty of battery life. Third, a battery-leasing strategy is supposed to reduce the cost of switching from a traditional internal combustion vehicle to an electric vehicle. Conclusions - This paper can provide strategic guidance for decision makers in firms that have already entered the electric-vehicle leasing market by making a recommendation such as a service innovation strategy. The proposed strategy can be considered as an electric vehicle market in the future and can contribute to the wider diffusion of electric vehicles.