• 제목/요약/키워드: Leakage verification

검색결과 122건 처리시간 0.024초

RANS Simulation of a Tip-Leakage Vortex on a Ducted Marine Propulsor

  • Kim, Jin;Eric Peterson;Frederick Stern
    • Journal of Ship and Ocean Technology
    • /
    • 제8권1호
    • /
    • pp.10-30
    • /
    • 2004
  • High-fidelity RANS simulations are presented for a ducted marine propulsor, including verification & validation (V&V) using available experimental fluid dynamics (EFD) data. CFDSHIP-IOWA is used with $\textsc{k}-\omega$ turbulence model and extensions for relative rotating coordinate system and Chimera overset grids. The mesh interpolation code PEGASUS is used for the exchange of the flow information between the overset grids. Intervals V&V for thrust, torque, and profile averaged radial velocity just downstream of rotor tip are reasonable in comparison with previous results. Flow pattern displays interaction and merging of tip-leakage and trailing edge vortices. In interaction region, multiple peaks and vorticity are smaller, whereas in merging region, better agreement with EFD. Tip-leakage vortex core position, size, circulation, and cavitation patterns for $\sigma=5$ also show a good agreement with EFD, although vortex core size is larger and circulation in interaction region is smaller.

3-레벨 인버터의 누설전류 제거를 위한 캐리어 기반 MVPWM의 과변조 특성 (Overmodulation Characteristics of Carrier Based MVPWM for Eliminating the Leakage Currents in Three-Level Inverter)

  • 이은철;최남섭;안강순
    • 전력전자학회논문지
    • /
    • 제20권6호
    • /
    • pp.509-516
    • /
    • 2015
  • The overmodulation characteristics of a carrier-based medium vector pulse width modulation (CBMVPWM) are examined in this study. CBMVPWM can completely eliminate leakage currents in a three-phase, three-level inverter using only the switching states with the same common mode voltage even in an overmodulation operation. The analytic equations for the magnitude of the output voltage and the switching frequency are derived for overmodulation operation, and the effect of dead time on the leakage current is demonstrated. This study presents the operating principle of CBMVPWM, basic overmodulation features, and simulations and experiments for operating verification.

상수관망 파일럿플랜트에서의 누수실험 및 누수탐지 알고리즘의 적용 (Leakage experiments and applications of leakage detection algorithm in the pilot plant of water distribution system)

  • 권혁재
    • 한국수자원학회논문집
    • /
    • 제50권9호
    • /
    • pp.609-616
    • /
    • 2017
  • 본 연구에서는 상수관망의 최적 수압모니터링 지점선정 알고리즘과 역추적 계산법을 이용한 누수탐지 알고리즘을 개발하였고 파일럿 플랜트에서 실험을 통해 검증하였다. 먼저 누수탐지를 위한 최적의 모니터링 지점선정을 선정하고 압력계를 설치하여 누수로 인한 압력변위를 측정하였다. 누수탐지를 위한 역추적계산법의 검증을 위하여 누수탐지를 수행하였고 파일럿플랜트에서 실제 재현된 누수의 지점과 누수량을 정확하게 산정하였다. 누수량을 $0.0005m^3/s$로부터 $0.0018m^3/s$까지 변화시키며 누수를 재현하였고 누수지점에 근접한 장소를 찾는데 성공하였다. 본 연구에서는 실험을 통해서 누수탐지기법으로 사용된 역추적계산법이 유효함을 검증할 수 있었다.

단일 안테나를 사용하는 RFID에서의 Phase Shifter를 이용한 TX Leakage 제거 방식 (Tx-Leakage Signal Blocking System in RFID System)

  • 전부원;배재현;노형환;정명섭;박준석
    • 한국전자파학회논문지
    • /
    • 제18권8호
    • /
    • pp.862-865
    • /
    • 2007
  • RFID 시스템에서는 현재 같은 주파수 대역에서 송신 단과 수신 단이 사용되며, 이에 따라 듀플렉서를 사용할 수 없게 되며 커플러를 사용하게 된다. 커플러를 사용함으로써 송신 누설 신호는 수신 단으로 직접적으로 영향을 주며, 이에 따라 태그의 인식 거리가 제한되는 부정적인 영향을 미치게 된다. 본 논문에서는 Rx 단으로 직접 적으로 영 향을 주는 Tx 누설 신호를 감쇄시키는 방법을 소개하고 ADS2006 시뮬레이션으로 이를 검증하였다

NI-9223과 전류프로브를 이용한 전류 및 누설전류 측정장치 개발 (Development of Electric Instrument of Current and Leakage Current based on NI-9223 and Current Prove)

  • 김성철;김운술
    • 한국안전학회지
    • /
    • 제27권6호
    • /
    • pp.48-53
    • /
    • 2012
  • This paper is purposed to develop portable electric instrument to select NI-9223(National instrument comp.) and clamp meter(HIOKI comp.), which can be used in developing electric instrument, to detect leakage current(ZCT) and current(CT) signals. In this paper, The electric instrument that can interface with current and leakage current instrument(HIOKI 9283), is developed by NI-9223 of NI comp.. HIOKI clamp meter can measure current signals certainly by high-sensitivity of 10 ${\mu}A$ resolution(leakage current : at 10 mA range) and current 1~200A range. The NI-9223 use four 16-bit analog-to-digital converters(ADCs) for true simultaneous sampling at up to 1 MS/s per channel. NI-9223 can synchronize all analog input modules installed in the same chassis to share the same start clock and/or sample clocks. The monitoring program is developed by SignalExpress of LabVIEW. The monitoring program are developed to analyze at simultaneous sampling on electrical signals such as leakage current(ZCT) and current(CT). The developed system verification tests were conducted, and portable electric instrument can be used in place which requires analysis of the actual electrical signal.

원전 격납건물 누설시험용 무선데이터전송을 적용한 시험장치 개발 (Leakage Rates Measurement System Development of NPP Primary Containment using Wireless Data Communication Method)

  • 류재규;손창호;황희정;김건수;최경식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 학술회의 논문집 정보 및 제어부문 B
    • /
    • pp.916-919
    • /
    • 2003
  • In this paper, we deal with a development of measurement system to apply the leakage rates test of primary containment in nuclear power plant. The measurement test about leakage rates in primary containment is one sort of test to prove safety of nuclear power plant. The parameters which are measured to calculate leakage rates are drybulb temperature, dew point temperature(or relative humidity), absolute pressure and flow. Overall, the measurement system consists of sensor module for data acquisition of the parameters, transfer module for wireless data communication and control module to control system and to calculate leakage rates. Because existing measurement systems are difficult to set in field, we pursued convenience of use, we applied wireless data communication and individual form module using battery. We also changed for the better in confidence. Recently, we are developing a drybulb temperature and a dew point temperature sensor module. We describe about function of developed measurement system, its standard and an plan for verification of measurement system.

  • PDF

Piosk : A Practical Kiosk To Prevent Information Leakage

  • Lee, Suchul;Lee, Sungil;Oh, Hayoung;Han, Seokmin
    • International journal of advanced smart convergence
    • /
    • 제8권2호
    • /
    • pp.77-87
    • /
    • 2019
  • One of important concerns in information security is to control information flow. It is whether to protect confidential information from being leaked, or to protect trusted information from being tainted. In this paper, we present Piosk (Physical blockage of Information flow Kiosk) that addresses both the problems practically. Piosk can forestall and prevent the leakage of information, and defend inner tangible assets against a variety of malwares as well. When a visitor who carries a re-writable portable storage device, must insert the device into Piosk installed next to the security gate. Then, Piosk scans the device at the very moment, and detects & repairs malicious codes that might be exist. After that, Piosk writes the contents (including sanitized ones) on a new read-only portable device such as a compact disk. By doing so, the leakage of internal information through both insiders and outsiders can be prevented physically. We have designed and prototyped Piosk. The experimental verification of the Piosk prototype implementation reveals that, Piosk can accurately detect every malware at the same detection level as Virus Total and effectively prevent the leakage of internal information. In addition, we compare Piosk with the state-of-the-art methods and describe the special advantages of Piosk over existing methods.

MLC leakage를 이용할 Verification의 효용성 고찰 (Verification of set-up accuracy using MLC leakage)

  • 윤인하;홍동기;정왕권;서동린;윤화룡;김정만
    • 대한방사선치료학회지
    • /
    • 제16권1호
    • /
    • pp.11-19
    • /
    • 2004
  • 서론 및 목적 : 세기변조 방사선치료와 전신 정위적 방사선치료에서 5mm이내의 위치 정확성확인 (L-gram)은 환자치료 목적 달성을 위한 중요한 QA과정의 하나이다. 이에 본원에서 제작한 scale point를 이용하여 L-gram 영상을 얻어 환자치료의 정확성을 향상시키고자 한다. 대상 및 방법 : 본원의 MLC 부착장비인 CL2100C/D, CL21EX에서 치료중인 IMRT, SRS환자를 대상으로 기존의 상품화된 port film graticule과 본원에서 제작한 MLC scale pointer를 비교 분석하였다. 결과 : MLC를 이용한 scale pointer는 beam의 확산까지 고려한 정확한 위치를 나타내었고 MLC의 교차로 생기는 pixel 모양의 형성을 통해 어떠한 위치에서도 정확한 확인이 가능했다. 결론 및 고찰 : L-gram 확인시 약간의 시간적 투자($1{\sim}2$분)로서 정확한 위치를 나타냄으로서 L-gram 확인시간 단축과 치료부위의 정확한 위치 확인을 할 수 있었다.

  • PDF

A Type of Subsection Model for a Permanent Magnet Bar and its Leakage Permeance Calculation Method in an Open Magnetic Circuit

  • Liang, Huimin;You, Jiaxin;Yang, Wenying;Zhai, Guofu
    • Journal of Magnetics
    • /
    • 제19권1호
    • /
    • pp.37-42
    • /
    • 2014
  • The equivalent model of a permanent magnet (PM) plays an important role in electromagnetic system calculation. A type of subsection model for a PM bar is established, to improve the accuracy of the traditional equivalent circuit method. The mathematical expression, and its end verification condition, are presented. Based on the analytical method and finite element method, the leakage permeance calculation of a PM bar in an open magnetic circuit is investigated. As an example, for a given certain type of PM bar, the magnetic flux of each section is validated by experiment, and by simulation. This model offers a foundation for building a high accuracy equivalent magnetic PM model in an electromagnetic system.

Development of an automated system for water-hydraulic and leakage test of pressure vessels

  • Kim, Dong-Soo;Lee, Won-Hee
    • International Journal of Precision Engineering and Manufacturing
    • /
    • 제5권1호
    • /
    • pp.55-59
    • /
    • 2004
  • This study developed a fully automated test system for pressure vessels, containing such as oxygen, nitrogen, which is widely used in many industries. The pressure vessel test has three major parts including weight measurement test, water-hydraulic test and leakage test followed by cleaning and drying. The control system for these tests consists of three parts: a PLC, a monitoring system and a database management system. The PLC oversees overall control of test machines, while the monitoring system measures and displays weight, pressure, flow etc. for every situations, and the database management system stores test data. These three modules are designed to communicate with one another at 1 Hz frequency alerting problematic situations to the operator. The system has gone through actual field tests for verification of performances.