• Title/Summary/Keyword: Leakage safety

Search Result 851, Processing Time 0.025 seconds

Preliminary Review of On-Site Clamping Repair Technology for Welding Part Leakage of Safety Related Valve in the Nuclear Power Plant (원전용 안전등급 밸브의 용접부 누설 클램핑 현장보수 기술 검토)

  • Ki Hong Kim;Ki Su Kim;Hwan Seok Jung;Moo Kyung Jang
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.19 no.1
    • /
    • pp.52-59
    • /
    • 2023
  • The welding part of the valve needs immediate action when leakage occurs due to cracks or damage. In order to repair leakage of the welding part, the valve must be separated from the pipe or replaced with a new valve. However, it is difficult to remove the valve while operating the power plant. This study presents a method to remove leakage by precisely processing the gap between the clamp and the incision part within 0.1mm while installed in the pipe system. If the external leakage is removed using a clamp on the welding part without removing the valve during operation, the time and cost required for maintenance can be reduced.

Development of Electrical Fire Detection System Applying Fuzzy Logic for Main Causes of Electrical Fire in Traditional Market Shops

  • Kim, Doo Hyun;Hwang, Dong Kyu;Kim, Sung Chul;Kim, Sang Ryull;Kim, Yoon Bok
    • International Journal of Safety
    • /
    • v.11 no.2
    • /
    • pp.15-21
    • /
    • 2012
  • This paper is aimed to develop an electrical fire detection system (EFDS) which can analyze the possibility of electrical fire for overcurrent, leakage current and arc signals of panel board in traditional market shop. The EFDS adopted fuzzy logic and precursory data for overcurrent, leakage current and arc signals to evaluate the possibility of electrical fire. The signals are obtained directly from panel board in traditional market shops and fuzzy membership function is obtained from experiment, simulation, expert's advice. The overcurrent data is acquired by thermal data of normal and abnormal states (partial disconnection) on the insulated electrical wire, in accordance with the increase of the current signal, The leakage current data is obtained under various environments. The arc signal is acquisited by waveforms of instantaneous value in time domain and frequency band in frequency domain. The Fuzzy algorithm for DB of EFDS consists of fuzzification, inference engine by Mamdani's method and defuzzification by center of gravity method. In order to verify the performance and reliability of EFDS, it was applied to Jeon-Ju traditional market shops (90 shops) in Korea. Results show that EFDS in this paper is useful in alarming the fire case, which will prevent severe damage to human beings and properties, and reduce the electrical fires in a vulnerable area of electrical disaster.

Effect of multiple-failure events on accident management strategy for CANDU-6 reactors

  • YU, Seon Oh;KIM, Manwoong
    • Nuclear Engineering and Technology
    • /
    • v.53 no.10
    • /
    • pp.3236-3246
    • /
    • 2021
  • Lessons learned from the Fukushima Daiichi nuclear power plant accident directed that multiple failures should be considered more seriously rather than single failure in the licensing bases and safety cases because attempts to take accident management measures could be unsuccessful under the high radiation environment aggravated by multiple failures, such as complete loss of electric power, uncontrollable loss of coolant inventory, failure of essential safety function recovery. In the case of the complete loss of electric power called station blackout (SBO), if there is no mitigation action for recovering safety functions, the reactor core would be overheated, and severe fuel damage could be anticipated due to the failure of the active heat sink. In such a transient condition at CANDU-6 plants, the seal failure of the primary heat transport (PHT) pumps can facilitate a consequent increase in the fuel sheath temperature and eventually lead to degradation of the fuel integrity. Therefore, it is necessary to specify the regulatory guidelines for multiple failures on a licensing basis so that licensees should prepare the accident management measures to prevent or mitigate accident conditions. In order to explore the efficiency of implementing accident management strategies for CANDU-6 plants, this study proposed a realistic accident analysis approach on the SBO transient with multiple-failure sequences such as seal failure of PHT pumps without operator's recovery actions. In this regard, a comparative study for two PHT pump seal failure modes with and without coolant seal leakage was conducted using a best-estimate code to precisely investigate the behaviors of thermal-hydraulic parameters during transient conditions. Moreover, a sensitivity analysis for different PHT pump seal leakage rates was also carried out to examine the effect of leakage rate on the system responses. This study is expected to provide the technical bases to the accident management strategy for unmitigated transient conditions with multiple failures.

Modeling and Analysis of Leakage Currents in PWM-VSI-Fed PMSM Drives for Air-Conditioners with High Accuracy and within a Wide Frequency Range

  • Sun, Kai;Lu, Yangjun;Xing, Yan;Huang, Lipei
    • Journal of Power Electronics
    • /
    • v.16 no.3
    • /
    • pp.970-981
    • /
    • 2016
  • Leakage currents occur in pulse-width-modulated voltage source inverter (PWM-VSI)-fed permanent magnet synchronous motor (PMSM) drives for air-conditioners, which seriously affect system safety and operation performance. High accuracy modeling and prediction of leakage currents are key issues for the design and implementation of air-conditioning products. In this study, the generation mechanism of leakage currents is discussed. A systematic modeling approach of leakage currents is proposed, including the modeling of leakage current sources and leakage current paths. By using the proposed approach, the complete model of leakage currents in PWM-VSI-fed PMSM drives for air-conditioners has been developed based on the extraction of all parameters. A comparison between the simulated leakage currents based on the developed model and measured leakage currents in the outdoor unit of an air-conditioning product is conducted. The comparison verifies the effectiveness of the proposed modeling approach, and the developed model exhibits high accuracy within a wide frequency range.

A Study on the Improvement of Emergency Block and Diffusion Prevention System for Hazardous Chemicals Leakage (화학물질 누출에 따른 긴급 확산 방재시스템 개선 방안 연구)

  • Lee, Deok-Jae;Yun, Jeong Hyeon;Yoo, Byung-Tae
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.5
    • /
    • pp.89-99
    • /
    • 2018
  • In the case of medium and small-sized businesses handling hazardous chemicals, emergency disaster prevention by workers, rather than a disaster prevention system using a safety device equipped with an automation system in case of a leak accident, is highly likely to occur. In order to solve these limitations, in this study investigated an emergency disaster prevention system that can be easily removed and adhered to the expected point of leakage according to the occurrence frequency of the leak during the chemical handling process.

Process Development of a Standard Operating Procedure (SOP) for the Manufacturing of Standardized Distribution Boards (규격화된 분전반 제작을 위한 표준작업절차(SOP)의 공정 개발)

  • Ko, Wan-Su;Lee, Byung-Seol;Choi, Chung-Seog
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.5
    • /
    • pp.21-27
    • /
    • 2018
  • The purpose of this study is to develop a SOP (Standard Operating Procedure) for a distribution board that can monitor the leakage current of a load distribution line in real time. The developed distribution board was fabricated by applying IEC 61439-1. It consists of the distribution board and an alarm device. The work process for making the distribution board was compliant with the KEMC (Korea Electrical Manufacturers Cooperative) regulations. And the AC distribution board range is 1,000 V. In addition, the voltage in DC is less than 1500 V. The distribution board receives a 3-phases and 4-wires power supply system and can supply power to the load of a maximum of 32 single or three phase distribution circuits. Also, leakage current measured on the power distribution board was used by sensors installed. The SOP of the developed distribution board consists of the installation standards for the short circuit alarm device and sensor, the surge protection device, switches and indication lamps, and other devices. The operation procedure was prepared so that each manufacturing step of the distribution board must be confirmed by the persons in charge of preparation, production, quality control and approval before moving forward to the next step.

The Selter Selection Plan due to Formaldehyde Leakage (포름알데히드 누출에 따른 대피장소 선정 방안)

  • SeungJu Oh;Ha-Sung Kong
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.4
    • /
    • pp.117-129
    • /
    • 2023
  • This study tested the effect on the toxicity of formaldehyde to select a shelter site due to formaldehyde leakage. As a result of the experiment, the range of ERPG-2 and 3 is between 2.2km and 9.6km, ASET is 6 minutes at 1km, 15 minutes at 3km, 22 minutes at 5km, and the lethality rate is 99.9% at 1km and 9% at 3km. In areas where refuge time is less than 15 minutes or the lethality rate is more than 2%, a shelter is installed. This is because if there are only a few evacuees, the evacuation time may take longer than the pre-movement time of 15 minutes or less specified in PD 7974-6:2004, and the lethality rate with the lowest number of deaths was calculated to be 2%. The shelter must be equipped with a hepa-filter, positive pressure equipment, air purifier, air respirator, goggles, chemical protective clothing type 4 and sufficient parking space must be secured to ensure the safety of evacuees.

On the Leakage Safety Analysis of Membrane LNG Storage Tank With Thermal Resistance Effects (열저항 효과를 고려한 멤브레인식 LNG 저장탱크의 누설 안전성에 관한 연구)

  • Kim C.K.;Cho S.H.;Suh H.S.;Hong S.H.;Lee S.R.;Kim Y.G.;Kwon B.K.
    • Journal of the Korean Institute of Gas
    • /
    • v.8 no.4 s.25
    • /
    • pp.1-7
    • /
    • 2004
  • In this paper, the FE analysis has been presented for the leakage safety of the membrane LNG storage tank based on the thermal resistance effects between the insulation panel and prestressed concrete structure. The FEM calculated results show that the leakage safety of plywood and polyurethane materials does not guarantee any more due to a strength failure of the insulation structure. But the PC structure of outer tank may delay leaked LNG of 10 days even though the inner tank and insulation structure are simultaneously failed. This means that the membrane LNG storage tank may be safe because of the stiffness of the outer tank.

  • PDF

Consequence Analysis on the Leakage Accident of Hydrogen Fuel in a Combined Cycle Power Plant: Based on the Effect of Regional Environmental Features (복합화력발전소 내 수소연료 적용 시 누출 사고에 대한 피해영향범위 분석: 지역별 환경 특성 영향에 기반하여)

  • HEEKYUNG PARK;MINCHUL LEE
    • Journal of Hydrogen and New Energy
    • /
    • v.34 no.6
    • /
    • pp.698-711
    • /
    • 2023
  • Consequence analysis using an ALOHA program is conducted to calculate the accidental impact ranges in the cases of hydrogen leakage, explosion, and jet fire in a hydrogen fueled combined cycle power plant. To evaluate the effect of weather conditions and topographic features on the damage range, ALOHA is executed for the power plants located in the inland and coastal regions. The damage range of hydrogen leaked in coastal areas is wider than that of inland areas in all risk factors. The obtained results are expected to be used when designing safety system and establishing safety plans.

Development and Safety Evaluation of Earth Leakage Alarm Breaker Equipped with Fire Current (IGR) Alarming Function (화재전류(IGR) 경보 기능이 내장된 누전경보차단기의 개발 및 안전성 평가에 관한 연구)

  • Ko, Wan-Su;Choi, Chung-Seog
    • Fire Science and Engineering
    • /
    • v.34 no.3
    • /
    • pp.43-48
    • /
    • 2020
  • The purpose of this study is to develop an earth leakage alarm circuit breaker, equipped with a leakage alarming function (JER-E2S, ETECKOREA Co., Korea), and to analyze its characteristics. The developed mechanism is exclusively used for single-phase and 220 V circuits, with a rated current of 32 A, 20 A, 20 A (for restrooms), 16 A, etc. It satisfies all characteristics of existing earth leakage circuit breakers (ELB). If a fire current, which is a resistive leakage current (Igr), flows through an electric line, the device detects the leakage current in real time and warns against the leakage through a blinking LED lamp. Since the developed device displays a tolerance to a capacitative leakage current (Igc) that inevitably occurs in LED lamps, communication devices, etc., it ensures a stable power supply. In addition, the earth leakage alarm circuit breaker protects against power failure due to a momentary ground fault. Therefore, it can supply power without the risk of the circuit breaker malfunctioning due to a momentary ground fault caused by water droplets, leaves, etc. Moreover, with a standby power of less than 0.1 W, the developed earth leakage alarm circuit breaker exhibits a power saving performance that is 3~8 times greater than that of other ELBs. Installation of approximately 10 earth leakage alarm circuit breakers in one apartment household, with an area of 120 ㎡, can save 2~5 kWh per month. Therefore, the developed earth leakage alarm breaker not only satisfies the characteristics of existing earth leakage breakers, but also exhibits outstanding power supply quality since it has the functions of electric fire prevention and malfunction prevention. Therefore, this device can innovatively contribute to electric fire prevention.