• Title/Summary/Keyword: Lead-lag control

Search Result 64, Processing Time 0.028 seconds

Development of flood forecasting system on city·mountains·small river area in Korea and assessment of forecast accuracy (전국 도시·산지·소하천 돌발홍수예측 시스템 개발 및 정확도 평가)

  • Hwang, Seokhwan;Yoon, Jungsoo;Kang, Narae;Lee, Dong-Ryul
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.3
    • /
    • pp.225-236
    • /
    • 2020
  • It is not easy to provide sufficient lead time for flood forecast in urban and small mountain basins using on-ground rain gauges, because the time concentration in those basins is too short. In urban and small mountain basins with a short lag-time between precipitation and following flood events, it is more important to secure forecast lead times by predicting rainfall amounts. The Han River Flood Control Office (HRFCO) in South Korea produces short-term rainfall forecasts using the Mcgill Algorithm for Precipitation-nowcast by Lagrangian Extrapolation (MAPLE) algorithm that converts radar reflectance of rainfall events. The Flash Flood Research Center (FFRC) in the Korea Institute of Civil Engineering and Building Technology (KICT) installed a flash flood forecasting system using the short-term rainfall forecast data produced by the HRFCO and has provided flash flood information in a local lvel with 1-hour lead time since 2019. In this study, we addressed the flash flood forecasting system based on the radar rainfall and the assessed the accuracy of the forecasting system for the recorded flood events occurred in 2019. A total of 31 flood disaster cases were used to evaluate the accuracy and the forecast accuracy was 90.3% based on the probability of detection.

Novel Cylindrical Magnetic Levitation Stage for Rotation as well as Translation along Axles with High Precisions (고정밀 회전 및 축방향 이송을 위한 신개념 원통형 자기부상 스테이지)

  • Jeon, Jeong-Woo;Caraiani, Mitica;Lee, Chang-Lin;Jeong, Yeon-Ho;Kim, Jong-Moon;Oh, Hyeon-Seok;Kim, Sungshin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.12
    • /
    • pp.1828-1835
    • /
    • 2012
  • In this paper, a conceptual design and a detailed design of novel cylindrical magnetic levitation stage is introduced. This is came from planar-typed magnetic levitation stage. The proposed stage is composed of cylinder-typed permanent magnet array and semi-cylinder-typed 3 phase winding module. When a proper current is induced at winding module, a magnetic levitation force between the permanent magnet array and winding module is generated. The proposed stage can precisely move the cylinder to rotations and translations as well as levitations with the magnetic levitation force. This advantage is useful to make a nano patterning on the surface of cylindrical specimen by using electron beam lithography under vacuum. Two methods are used to calculate required magnetic levitation forces. The one is 2D FEM analysis, the other is mathematical modeling. This paper shown that results of two methods are similar. An assistant plate is introduced to reduce required currents of winding module for levitations in vacuum. The mathematical model of cylindrical magnetic levitation stage is used for dynamic simulation of magnetic levitations. A lead-lag compensator is used for control of the model. Simulation results shown that the detail designed model of the cylindrical magnetic levitation stage with the assistant plate can be controlled very well.

A Novel Clustering Method for Increasing Connection Durability in Sensor Network Environment (센서 네트워크에서 연결 지속성 향상 가능한 새로운 클러스터링 기법에 관한 연구)

  • Kim, Dae-Hyun;Kim, Jin-Mook;Lee, Kyung-Oh
    • The KIPS Transactions:PartC
    • /
    • v.15C no.2
    • /
    • pp.119-124
    • /
    • 2008
  • The LEACH is a study method of a clustering base that was representative in many routing techniques that was suggested in sensor network environment. This is suggested technique to manage the sensor network group which consisted of many sensors in efficiency. However, it does not consider energy remaining quantity of the cluster header to manage cluster group, the problem where the cluster group is able to destroyed on the middle which transmits data. We are going to propose to solve such a problem by this paper for new clustering technique to accomplish management for a cluster group. It uses the technique which it proposes from the dissertation which it sees and are to the data transfer and the control also the connection directivity of the cluster group to improve also the lag time diminishes, test result it will lead and the possibility which it will know it was.

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works (공동주택 마감공사 공사주체별 작업지연 요인 분석)

  • Lee, Seung-Hoon;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Junn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.