• Title/Summary/Keyword: Large dam

검색결과 385건 처리시간 0.023초

Tightly-Coupled GPS/INS/Ultrasonic-Speedometer/Barometer Integrated Positioning for GPS-Denied Environments

  • Choi, Bu-Sung;Yoo, Won-Jae;Kim, Lawoo;Lee, Yu-Dam;Lee, Hyung-Keun
    • Journal of Positioning, Navigation, and Timing
    • /
    • 제9권4호
    • /
    • pp.387-395
    • /
    • 2020
  • Accuracy of an integrated Global Positioning System (GPS) / Inertial Navigation System (INS) relies heavily on the visibility of GPS satellites. Especially, its accuracy is dramatically degraded in urban canyon due to signal obstructions due to large structures. In this paper, we propose a new integrated positioning system that effectively combines INS, GPS, ultrasonic sensor, and barometer in GPS-denied environments. In the proposed system, the ultrasonic sensor provides velocity information along the forward direction of moving vehicle. The barometer output provides height information compensated for the pressure variation due to fast vehicle movements. To evaluate the performance of the proposed system, an experiment was carried out by mounting the proposed system on a test car. By the experiment result, it was confirmed that the proposed system bears good potential to maintain positioning accuracy in harsh urban environments.

조립재료 동적물성 산정을 위한 대형삼축압축시험장비 구축 및 검증 (Development and Verification of Large Triaxial Testing System for Dynamic Properties of Granular Materials)

  • 이성진;김윤기;주연욱;이세현;강태호
    • 한국지반공학회논문집
    • /
    • 제26권12호
    • /
    • pp.5-17
    • /
    • 2010
  • 조립재료는 철도, 도로, 댐 등의 대형 지반구조물의 중요한 성토재료로 활용되고 있다. 따라서 이러한 조립재료에 대한 정확한 물성산정은 합리적인 설계와 시공을 위해 필수적이다. 하지만 대입경의 조립재료를 실험하기 위한 장비가 부족하여 이에 대한 연구가 매우 제한적이었다. 이에 본 연구에서는 직경 500mm, 300mm, 150mm 등의 공시체에 대한 실험이 기능한 대형삼축압축시험장비를 구축하였다. 본 장비에서는 로드셀을 삼축셀 안에 설치하고, 미소변형률 수준에서의 제어와 변위측정의 정확도를 높이기 위해 시편 중간 영역의 변형을 측정하였다. 본 장비의 동적물성실험 검증을 위해 같은 강성으로 직경 300mm와 50mm의 우레탄 5쌍을 제작하였다. 대형삼축압축시험장비를 이용해서는 직경 300mm의 대형 우레탄 시편에 대한 실험을 수행하였으며, 소형(직경 50mm) 우레탄 시편에 대한 RC/TS, 충격반향기법시험 등을 수행하였다. 시험 결과에서 본 장비의 합리적 시험 결과를 확인할 수 있었다.

필댐 제체 재료의 동적 물성치 평가 : II. 비선형 동적 변형특성 (Estimation of Dynamic Material Properties for Fill Dam : II. Nonlinear Deformation Characteristics)

  • 이세현;김동수;추연욱;권혁기
    • 한국지반공학회논문집
    • /
    • 제25권12호
    • /
    • pp.87-105
    • /
    • 2009
  • 정규화 전단탄성계수 감소곡선(G/$G_{max}-\log\gamma$)과 감쇠비 곡선(D-$\log\gamma$)으로 표현되는 비선형 동적 변형특성은 현장 전단파속도 주상도와 함께 필댐의 동적 내진해석시 중요한 입력 물성치로 사용된다. 본 논문에서는 필댐 심벽부와 사력부 각각에 대하여 합리적이고 경제적인 비선형 동적 변형특성 산정 방법을 제시하였다. 심벽부의 경우, 기존 여러 연구 결과로부터 심벽부 구성 재료의 조건을 만족하는 정규화 전단탄성계수 감소곡선 111개, 감쇠비 곡선 98개를 확보하여 3개의 구속응력 영역(0~100kPa, 100kPa~200kPa, 200kPa 초과)에 대한 대표 곡선 및 범위를 제안하였고, 2종의 기존 댐 심벽부 시료에 대한 공진주 시험 결과와 비교하여 신뢰성을 확인하였다. 사력부의 경우, 자갈 등 입자가 큰 사석 재료에 대해 대형 시험장비를 이용하여 시험을 수행한 국외 연구 결과로 부터 정규화 전단탄성계수 감소곡선 135개, 감쇠비 곡선 65개를 획득하였다. 정규화 전단탄성계수 감소곡선은 3개의 구속응력 영역(50kPa 이하, 50kPa~100kPa, 100kPa 초과)에 대해 대표 곡선을 제안하였고, 감쇠비 곡선은 구속응력에 관계없이 하나의 대표 곡선으로 제안하였다. 또한 현재 시공중인 B댐의 사석 재료에 대한 결과와 비교하여 대표 곡선 및 범위에 대한 신뢰성을 검증하였다.

하천 만곡부를 고려한 GIS 기반 침수지역 레이어 구축 (The Construction of GIS-based Flood Risk Area Layer Considering River Bight)

  • 이근상;유병혁;박진혁;이을래
    • 한국지리정보학회지
    • /
    • 제12권1호
    • /
    • pp.1-11
    • /
    • 2009
  • 홍수시 댐 방류에 따른 하류하천의 침수지역을 신속하게 가시화하는 것은 댐관리 업무에 매우 중요하다. 하천구간별로 모의된 홍수위를 기반으로 침수지역을 효과적으로 표출하기 위해서는 하천의 만곡부에서 나타나는 중복영역을 제거해야 된다. 본 연구에서는 홍수분석모형 (COSFIM)과 FLDWAV 모델을 연계하여 하천 만곡부를 고려한 침수지역 가시화를 위해 배수강제 알고리듬을 적용하였다. 배수강제 알고리듬은 자동유역추출시 지형상의 함몰점을 제거함으로서 수문학적 처리연구 등에 장점을 주는 보간법의 일종이다. 본 연구에서는 남강댐 하류구간을 대상으로 하천만곡부를 고려한 침수지역 레이어 제작기법을 제시하였으며, 이러한 프로세스를 자동으로 수행하기 위해 Arcobject 컴포넌트 기반의 시스템을 개발하였다. 침수지역레이어 자동추출시스템은 시간측면에서 대용량 데이터를 기반으로 수행되는 홍수범람가시화 업무를 효과적으로 절감시킬 수 있었다. 또한 침수지역 레이어는 IKONOS 위성영상과의 연계를 통해 홍수 재해관련 업무에 실감정보를 제공할 수 있었다.

  • PDF

Bayesian 모형을 이용한 단일사상 강우-유출 모형의 불확실성 분석 (Uncertainty Assessment of Single Event Rainfall-Runoff Model Using Bayesian Model)

  • 권현한;김장경;이종석;나봉길
    • 한국수자원학회논문집
    • /
    • 제45권5호
    • /
    • pp.505-516
    • /
    • 2012
  • 본 연구에서는 국내외에서 범용되고 있는 단일강우사상 모형인 미육군공병단의 HEC-1 모형을 이용하여 대청댐 유역의 실측 강우-유출 사상을 중심으로 강우-유출 모의를 수행하였으며, 매개변수 검정에는 실제 대청댐의 시간당 유입량을 기준으로 검정을 실시하였다. HEC-1 모형에는 매개변수를 자동으로 최적화시키는 프로그램이 내장되어 있으나 본 연구의 대상유역과 같이 다수의 소유역이 있는 경우, 매개변수 추정시 매개변수 중 일부는 수렴되지 못하고 발산하는 문제가 있었으며, 첨두유량의 추정능력 역시 저하되는 문제를 보였다. 따라서 이러한 HEC-1 모형의 매개변수의 불확실성을 고려하기 위한 방안으로 Bayesian 모형을 HEC-1모형에 연동시켜 활용하였으며, 기존 HEC-1 강우-유출 모형에 적용할 수 있는 매개변수 최적화 및 불확실성 정량화를 위해 HEC-1 강우-유출 모형 매개변수는 SCS 1개, Clark 단위도 2개를 Bayesian MCMC 기법을 적용하여 매개변수간 조건부확률로 모의발생을 한 후, Bayesian 모형으로부터 각 매개변수의 사후분포(posterior distribution)를 추정하여 사후분포의 추정이 매개변수의 불확실성 정량화를 수행하였다. 본 연구를 통해 제안된 BHEC-1 모형을 대상으로 대청댐 유역에 실측 강우-유출사상에 대해서 모형의 적합성을 평가한 결과, 7개 유역의 21개의 매개변수가 해의 발산 없이 안정된 매개변수 추정이 가능하였다. 한편, Bayesian 모형을 근간으로 하기 때문에 최종결과로서 매개변수들의 사후분포(posterior)의 추정이 가능하여 향후 홍수빈도곡선 유도, 댐 위험도분석과 기후변화 문제와 같은 다양한 수문학적 문제의 연구에 적용 가능할 것으로 전망된다.

중소형 필댐의 정밀점검 우선순위 도출을 위한 간이 위험도 분석 방법 (Risk Analysis Method for Deriving Priorities for Detailed Inspection of Small and Medium-sized Fill Dam)

  • 김진영;강재모
    • 한국지반환경공학회 논문집
    • /
    • 제21권10호
    • /
    • pp.11-16
    • /
    • 2020
  • 우리나라의 농업용 저수지는 국가 주요 기반시설 중 하나로 국민의 삶에 중요한 역할을 수행하고 있다. 하지만 노후화된 저수지가 인명과 재산에 대한 위험 요소로 작용하고 있는 실정이다. 현재 전국에 40년이 넘은 노후화가 진행된 크고 작은 댐과 저수지가 건설되어 있다. 전국에 건설된 댐, 저수지의 관리주체는 여러 기관으로 나눠져 있다. 따라서 비용과 시간적 문제로 모든 댐, 저수지의 관리가 어려운 실정이다. 그렇기 때문에 적은 관리 인력과 전문지식이 부족한 현장의 관리자도 다수의 저수지에 대하여 위험요인을 신속히 파악하고 시설물을 상태를 파악할 수 있는 소규모 저수지에 최적화된 안정성 평가 시스템이 구축되어야 한다. 본 연구에서는 위험인자로 침투, 누수, 침하, 활동, 균열, 침식으로 항목들을 선정하였으며 항목들의 위험도를 평가하기 위해 다기준 의사결정(Multi-Criteria Decision Making : MCDM) 방법 중 하나인 계층적 분석 과정(AHP) 기법을 활용하였다. 분석 결과 침투, 누수, 균열, 활동, 침하, 침식 순으로 나타났다. 산정된 가중치를 활용하여 사전에 간편한 방법으로 댐 저수지 붕괴 위험도를 평가하여 정밀진단 우선순위를 결정 할 수 있을 것으로 판단된다.

필댐 제체심벽(堤體心壁)의 단면변화(斷面變化)에 대한 침투류해석(浸透流解析)에 관한 실험적(實驗的) 연구(硏究) (Experiment on Seepage in Varied Section of Core Wall for Fill Dam Design)

  • 진병익;김재홍
    • 대한토목학회논문집
    • /
    • 제5권1호
    • /
    • pp.55-64
    • /
    • 1985
  • 본(本) 논문(論文)은 필댐에 있어서 최적심벽(最適心壁) 설계(設計)의 기준(基準)이 될 수 있도록 21개(個)의 심벽모형별(心壁模型別) 침투류(浸透流) 해석(解析)에 대한 실험(實驗)을 실시(實施)하여 경사면(傾斜面)의 기울기 변화(變化)로 침투류량(浸透流量)의 증감율(增減率)에 대해서 규명하였고, 특히 경사심벽(傾斜心壁)에서의 적정(適定) 설계경사(設計傾斜)를 찾아 보았다. 그리고 현재(現在)까지 발표(發表)된 근사이론식(近似理論式)에 실험치(實驗値)를 대입(代入)하여 이론침투류량(理論浸透流量)을 구(求)하고 실험치(實驗値)와 비교연구(比較硏究)하였으며, 검토결과(檢討結果) 실험치(實驗値)에 가장 가까운 이론공식(理論公式)도 찾았다. 또한 상류(上流)로 기울어진 경사심벽(傾斜心壁)에서의 침윤선형(浸潤線形)과 유출점(流出點)에 대해서도 고찰(考察)하고 현재(現在)까지 발표(發表)된 이론식(理論式)의 적합유무(適合有無)도 검토(檢討)하였다. 이상(以上)을 연구(硏究)하여 필댐의 심벽설계시(心壁設計時) 최적단면결정(最適斷面決定)을 위한 보다많은 자료(資料)를 제시(提示)하고자 하였다.

  • PDF

석축 산성의 계곡부 체성과 못(池)에 관한 연구 - 거창 거열성과 함안 성산산성을 중심으로 - (A Study on the Wall and Reservoir at the Valley Part of Stone Fortress - Focused on the Fortress of $Geoyeol-seong$ and $Seongsan-seong$ -)

  • 권순강;이호열;박운정
    • 건축역사연구
    • /
    • 제20권3호
    • /
    • pp.7-22
    • /
    • 2011
  • With the accumulations of outcomes from archaeological excavations of mountain fortress of three kingdoms period, there have been studies about time-periodic territory range of mountain fortress, difference in the way(method) of construction, defence system and so on from various points of view. This is an empirical study on the construction method of the valley part of stone fortress. First of all, it is required to secure large quantity of fresh water for those who lived at mountain fortress. Especially when builders of fortress construct a fortification at the valley part of stone fortress, in advance they must sufficiently consider several options including the establishment of sustainable water resources. First, when it comes to build a fortification on a ridge[or a slope] of a mountain, you have only to consider a vertical stress. However, when it comes to build a fortification at the valley part of a mountain, You must have more sufficient preparations for the constructing process. Because there are not only a vertical stress but also a horizontal pressure simultaneously. Second, a fortification of mountain fortress built by using unit building stone is a structure of masonry construction like brick construction, and the valley part of it is where the construction of the fortification begins. Third, when it comes to build a fortification at the valley part of a mountain, it seems that they use a temporary method such as coffer dam in oder to prevent the collapse of the fortification due to heavy rain. Furthermore, in response to a horizontal pressure a fortification is built by the way of its plane make an arch, or by piling up the soil with the plate method(類似版築) and earthen wall harder method(敷葉) they increase cross-sectional area of the fortification and its cutoff capacity. In front direction they put the reservoir facility for the fear that the hydraulic pressure and earth pressure are directly transmitted to the fortification. The process of constructing the fortification at the valley part of a mountain is done in the same oder as follows; leveling of ground(整地) ${\Rightarrow}$ construction of coffer dam ${\Rightarrow}$ construction of the fortification between the both banks of the valley ${\Rightarrow}$ construction of the fortification at bottom part of spill way(餘水路) between the both banks of the valley ${\Rightarrow}$ construction of spill way(餘水路) & reservoir facility ${\Rightarrow}$ construction of the fortification at upper part of spill way between the both banks of the valley. Coffer dam facility seems to be not only the protection device on occasion of flood but also an important criterion to measure the proper height of spill way or tailrace(放水路). This study has a meaningful significance in that it empirically examines the method of reduction of the horizontal pressure which the fortification at the valley part of a mountain takes, the date the construction was done, and wether the changes in climate such as heavy rainfall influence the process of construction.

농업용 저수지 수질개선을 위한 국내 인공습지 설계 및 시공실태 조사 (Investigation on Design Aspects of the Constructed Wetlands for Agricultural Reservoirs Treatment in Korea)

  • 김영철;최혜선;김이형
    • 한국습지학회지
    • /
    • 제23권2호
    • /
    • pp.189-200
    • /
    • 2021
  • 인공습지는 농업용 저수지의 수질개선을 위하여 많은 곳에 적용되고 있다. 인공습지는 수심분포, 유입량 및 유출량, 물흐름 분포, 체류시간, 수질 처리효율, 종횡비, 개방수역/폐쇄수역 구성비 등이 중요한 설계인자이다. 특히, 인공습지 높은 효율 증대를 위해서는 취입보 형식, 유입보, 인입수로 길이, 셀(Cell) 형태, 셀 연결 형태 등의 설계는 매우 중요하다. 본 연구는 농업용 저수지에 조성되어 운영중인 23개 인공습지의 현장조사를 통하여 설계시 고려하여야 할 인자 및 효율적 운영방안을 제시하고자 수행되었다. 인공습지 중에서 비정상적 운영이 나타나는 습지는 수위센서 미작동, 취입보 내부의 유사퇴적 및 기계식 수문틀의 협잡물 문제가 중요한 원인으로 나타났다. 또한, 인입수로의 길이가 길어질수록 취입보 하류부와 상류부의 생태적 단절구간이 늘어나는 것도 문제점으로 분석되었다. 습지 대부분은 2~5개의 셀로 조성되었으며 셀의 크기가 지나치게 클 경우 수리학적 효율이 떨어지고 관리가 어려운 것으로 평가되었다. 작은 규모의 습지에 많은 셀이 존재하는 경우 큰 수두손실로 인하여 적절한 유수흐름이 나타나지 않는 것으로 평가되었다.

Management of Reproduction on Small, Medium and Large Rabbit Farms: A Review

  • Szendro, Zs.;Szendro, K.;Zotte, A. Dalle
    • Asian-Australasian Journal of Animal Sciences
    • /
    • 제25권5호
    • /
    • pp.738-748
    • /
    • 2012
  • One of the main goals of small, medium and large farms is to improve the reproductive performance of rabbit does. Stocks of lower productivity can be improved by crossing with intensive breeds. A better nutritional status of both foetuses and suckling kits has a positive effect on their later productivity. Overfeeding young females before first mating can lead to conditions of fattiness. Using restricted feeding or higher fibre content in the feed and changing it for a higher level ad libitum feeding about one week prior to first mating leads to longer lifespan and higher productive level. Intensive reproductive rhythm creates a negative energy balance in does : they are unable to consume enough feed (energy) for the nutritional requirements of foetus and lactation, and therefore lose most of their fat reserves. Furthermore, primiparous does also expend energy because they are still growing. Under intensive conditions, the 42-d reproductive rhythm (re-mating 11 days after parturition) is recommended. Under extensive conditions, the 18 or 25-d mating interval with 35 to 42-d weaning could be suitable. On small farms, natural mating is favoured; on large farms AI is commonly employed. The main advantage of AI is the all-in, all-out system. Hormonal (PMSG) treatment is used with AI to increase receptivity on d 11. Frequent and high level PMSG use can lead to higher anti-PMSG antibody rates. Lower level (max. 20 IU) and less frequent PMSG injection or non-hormonal alternative methods (short dam-litter separation, changing nursing method or lighting programs) are recommended for this reason.