A Blasting Experience in a Shallow Tunnel Section Overlain by Residential Structures (터널 상부 근접시설물 통과구간의 발파시공사례)

  • Won, Yeon-Ho;Kang, Choo-Won;Kim, Joung-In
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.99-107
    • /
    • 2008
  • This study, to reduce a ground vibration damage of the structures in an area adjacent to housing structures located closely above the tunnel section, is the ground vibration reduction instance of a tunnel blasting selectively applied the ground vibration-controlled blasting method (delay time applied blasting method, large center hole cut method, Line Drilling method, etc) with an originally planned blasting method connected, but with it's workability and economic efficiency is satisfactory, so, the results says the ground vibration-controlled blasting method on a similar condition is very effective, even if the applicability is depend on the blasting method and ground condition of the work area.

A Study on the Optimal Setting of Large Uncharged Hole Boring Machine for Reducing Blast-induced Vibration Using Deep Learning (터널 발파 진동 저감을 위한 대구경 무장약공 천공 장비의 최적 세팅조건 산정을 위한 딥러닝 적용에 관한 연구)

  • Kim, Min-Seong;Lee, Je-Kyum;Choi, Yo-Hyun;Kim, Seon-Hong;Jeong, Keon-Woong;Kim, Ki-Lim;Lee, Sean Seungwon
    • Explosives and Blasting
    • /
    • v.38 no.4
    • /
    • pp.16-25
    • /
    • 2020
  • Multi-setting smart-investigation of the ground and large uncharged hole boring (MSP) method to reduce the blast-induced vibration in a tunnel excavation is carried out over 50m of long-distance boring in a horizontal direction and thus has been accompanied by deviations in boring alignment because of the heavy and one-directional rotation of the rod. Therefore, the deviation has been adjusted through the boring machine's variable setting rely on the previous construction records and expert's experience. However, the geological characteristics, machine conditions, and inexperienced workers have caused significant deviation from the target alignment. The excessive deviation from the boring target may cause a delay in the construction schedule and economic losses. A deep learning-based prediction model has been developed to discover an ideal initial setting of the MSP machine. Dropout, early stopping, pre-training techniques have been employed to prevent overfitting in the training phase and, significantly improved the prediction results. These results showed the high possibility of developing the model to suggest the boring machine's optimum initial setting. We expect that optimized setting guidelines can be further developed through the continuous addition of the data and the additional consideration of the other factors.

A Study on the Behavior of an Existing Tunnel and the Safety Implications on its Facilities from a New Tunnel Blasting (신설 터널 발파 시 기존 터널 거동 및 시설물 안전에 관한 연구)

  • Kim, Sung Hoon;Cho, Woncheol
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.2
    • /
    • pp.57-64
    • /
    • 2010
  • In this study, the behavior and safety of an existing tunnel and its facilities are investigated when a new tunnel adjacent to the existing tunnel is blasted. The design of the new tunnel puts priority on stability of the tunnel itself over the safety of the facilities which are installed within the existing tunnel such as jet fans. And thus, a detailed consideration on securing the safety of the existing facilities has been insufficient. An analysis on the types of traffic accidents in the last ten years shows that most incidents were due to the driver's improper response in emergency situations and unexpected obstacles. In consideration of this analysis, the safety of the facilities in the existing tunnel was secured by minimizing the charging amount for each hangfire and changing the excavation method of evacuation communication shelters to the large center hole cut blasting method to reduce blasting vibration. For a more quantitative analysis, measurement devices were installed inside the existing tunnel, at houses adjacent to the new tunnel, near jet fans in the existing tunnel. This enabled real time measurement of displacements of the existing tunnel, adjacent houses, and jet fans without interrupting traffic flow. Therefore, the improvements of charging amount for each hangfire, the blasting method, and the measurement method are suggested in this paper to secure the safety of the facilities in the existing tunnel when a new tunnel, located on a large city and adjacent to an existing tunnel, is designed.