• Title/Summary/Keyword: Large Scale Problem

Search Result 948, Processing Time 0.028 seconds

Analysis of Purpose, Effectiveness and Problem of HACCP System Implementation according to Scales of Swine Farm (양돈 농장 규모에 따른 HACCP 적용 목적, 효과, 문제점 분석)

  • Nam, In-Sik
    • Korean Journal of Organic Agriculture
    • /
    • v.25 no.3
    • /
    • pp.643-651
    • /
    • 2017
  • The purpose of this study was to analyze the purpose, effectiveness and problems of HACCP system implementation for small, medium and large scale of swine farms implementing HACCP. Small and medium scale swine farms stated that the primary purpose of HACCP implementation was to receive government funding, but large scale swine farm was answered to improve the farm's competitiveness. In the case of small farms, the effect of HACCP implementation responded to systematic farm management as the top priority, while mid-scale and large-scale swine farms were said to improve farm sanitation. In addition, the biggest problems caused by the implementation of HACCP were the difficulty of improving the consciousness of the employees (small farm) and the records management (medium scale, large farm) by HACCP implementation. In order to solve these problems, it is necessary to adjust the number of HACCP evaluation items of pig farm and HACCP education for employees.

A Compensation Method and Comparative Analysis of Historical Unit Price Considering Work Types for Large and Small-Scale Projects (공종별 특성을 고려한 대·소규모 공사의 실적공사비 비교 및 보정방안)

  • Hong, Sung Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.293-303
    • /
    • 2014
  • Recent historical unit price is presented by the Korea Institute of Construction Technology (KICT) and it is analyzed by data from large-scale projects. Therefore it has problem applying to small-scale projects. To indicate the problem, the study compared historical unit price of large-case project and small-case project in the case of civil engineering work, building construction, and mechanical facility work. As a result, average historical unit price of small-scale project was 26.6% higher than large-scale project. On the other hand, difference on the labor cost was 18.4%, difference on material cost and overheads were 8.18%. Moreover, the study proposed compensation method to correct to apply recent historical unit price to small-scale project.

Efficient Lambda Logic Based Optimisation Procedure to Solve the Large Scale Generator Constrained Economic Dispatch Problem

  • Adhinarayanan, T.;Sydulu, M.
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.3
    • /
    • pp.301-309
    • /
    • 2009
  • A simple and efficient Lambda logic (${\lambda}-logic$) based algorithm is proposed for the solution of the generator constrained economic dispatch problem when the generating units having prohibited zones. The proposed method solves the economic dispatch (ED) problem that takes into account ramprate limits, transmission losses and prohibited operating zones in the power system operation. The proposed method uses a simple heuristic rule based on average power of prohibited operating zones which produces the feasibility of solution for the restricted operating units. The effectiveness of the algorithm is tested on five different test systems and the performance compared with other relevant methods reported in the literature. In all the cases, the proposed algorithm performs better than the previous existing algorithms with a less computational burden.

Emergency Service Restoration and Load Balancing in Distribution Networks Using Feeder Loadings Balance Index (피더부하 균등화지수를 이용한 배전계통의 긴급정전복구 및 부하균등화)

  • Choe, Sang-Yeol;Jeong, Ho-Seong;Sin, Myeong-Cheol
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.5
    • /
    • pp.217-224
    • /
    • 2002
  • This paper presents an algorithm to obtain an approximate optimal solution for the service restoration and load balancing of large scale radial distribution system in a real-time operation environment. Since the problem is formulated as a combinatorial optimization problem, it is difficult to solve a large-scale combinatorial optimization problem accurately within the reasonable computation time. Therefore, in order to find an approximate optimal solution quickly, the authors proposed an algorithm which combines optimization technique called cyclic best-first search with heuristic based feeder loadings balance index for computational efficiency and robust performance. To demonstrate the validity of the proposed algorithm, numerical calculations are carried out the KEPCO's 108 bus distribution system.

Generation of the Orthoimage with the Correction of Building Occlusion

  • Yoo, Hwan-Hee;Sohn, Duk-Jae;Park, Hong-Gi
    • Korean Journal of Geomatics
    • /
    • v.1 no.1
    • /
    • pp.7-13
    • /
    • 2001
  • Geospatial Information Systems (GIS) have been employed to systematically manage and design land use in urban areas. This has increased the need for more accurate vector and raster data. In Korea, l/l,000-scale digital maps are used as vector data for the facility management in urban areas. This has increased the need for large scale orthoimages. Orthoimages generated from aerial imagery can provide accurate information, making possible the more effective city management. However, there is a large problem in using the orthoimages, i.e., currently available conventional orthoimages have not been generated based on Digital Elevation Model (DEM) that takes into account the building heights. So this causes the displacements of building image in large scale orthoimages. The present study is an attempt to generate the large scale orthoimages based on building DEM. The semiautomatic building extraction method can detect building outlines by mouse clicking on either building roofs or corners. Building DEM, based on the outline and calculated building height, was used to produce the large scale orthoimages with the corrected building occlusion.

  • PDF

Multipath Routing Based on Opportunistic Routing for Improving End-to-end Reliability in Large-scale Wireless Sensor Networks (대규모 무선 센서 네트워크에서 종단 간 전송 성공률 향상을 위한 기회적 라우팅 기반 다중 경로 전송 방안)

  • Kim, SangDae;Kim, KyongHoon;Kim, Ki-Il
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.14 no.4
    • /
    • pp.177-186
    • /
    • 2019
  • In wireless sensor networks, the transmission success ratio would be decreased when the scale of the WSNs increased. To defeat this problem, we propose a multipath routing based on opportunistic routing for improving end-to-end reliability in large-scale wireless sensor networks. The proposed scheme exploits the advantages of existing opportunistic routing and achieves high end-to-end success ratio by branching like a multipath routing through local decision without information of the whole network. As a result of the simulation result, the proposed scheme shows a similar or higher end-to-end transmission success ratio and less energy consumption rather than the existing scheme.

Large-scale 3D fast Fourier transform computation on a GPU

  • Jaehong Lee;Duksu Kim
    • ETRI Journal
    • /
    • v.45 no.6
    • /
    • pp.1035-1045
    • /
    • 2023
  • We propose a novel graphics processing unit (GPU) algorithm that can handle a large-scale 3D fast Fourier transform (i.e., 3D-FFT) problem whose data size is larger than the GPU's memory. A 1D FFT-based 3D-FFT computational approach is used to solve the limited device memory issue. Moreover, to reduce the communication overhead between the CPU and GPU, we propose a 3D data-transposition method that converts the target 1D vector into a contiguous memory layout and improves data transfer efficiency. The transposed data are communicated between the host and device memories efficiently through the pinned buffer and multiple streams. We apply our method to various large-scale benchmarks and compare its performance with the state-of-the-art multicore CPU FFT library (i.e., fastest Fourier transform in the West [FFTW]) and a prior GPU-based 3D-FFT algorithm. Our method achieves a higher performance (up to 2.89 times) than FFTW; it yields more performance gaps as the data size increases. The performance of the prior GPU algorithm decreases considerably in massive-scale problems, whereas our method's performance is stable.

The Control of Large Scale System by Sliding Mode (슬라이딩 모드를 이용한 대규모 계통의 제어)

  • Chun, Hee-Young;Park, Gwi-Tae;Kuo, Chun Ping;Kim, Dong-Sik;Im, Hyeong-Yong
    • Proceedings of the KIEE Conference
    • /
    • 1987.07a
    • /
    • pp.190-194
    • /
    • 1987
  • This paper describes a new method for control of large-scale system by sliding mode. The concepts of control to large-scale system on the basis of VSS(Variable Structure System) control theory are used to decompose a large control problem into a two-level algorithm such that each subsystem is stabilized with local discontinuous controllers and higher level corrective control is designed to take into account the effect of interaction among the subsystems. In this paper, we show that each subsystem is controlled with repect to local continuous and higher level corrective control. This algorithm can be easily applied to multi-variable control system and obtained a continuous control in comparison With variable structure control systems. Two numerical examples are discussed as illustrations.

  • PDF

The Study of Development and Calibration for the Real Scale Fire Test Facility (실대형화재평가장치의 개발 및 안정화에 관한 연구)

  • Yoo, Yong-Ho;Kim, Heung-Youl;Shin, Hyun-Jun
    • Fire Science and Engineering
    • /
    • v.22 no.1
    • /
    • pp.37-44
    • /
    • 2008
  • The reduced scale fire test provides basic data but it is not enough to analysis real fire problem directly because there is no exact analogy theory between a real fire and the reduced scale model. Therefore, we have developed the 10 MW large scale calorimeter in order to real scale fire test. This advanced large scale calorimeter used for physical properties such as a heat release rate, based upon consumption of $O_2$ method. Using the heptane pool fire, we carried out the calibration in order to evaluation for heat release rate. It is approve that this facility has the reliability and it is capable of applying to the advance fire research in the future.

Performance Analysis of Gas Turbine for Large-Scale IGCC Power Plant

  • Joo, Yong-Jin;Kim, Mi-Yeong;Park, Se-Ik;Seo, Dong-Kyun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.3
    • /
    • pp.415-419
    • /
    • 2016
  • As the need for clean coal technology has grown, so has the global research and development efforts into integrated gasification combined cycle (IGCC) plants. An IGCC plant couples a gas turbine to a gasification block. Various technical and economic problems exist in designing such a system. One such problem is the difficulty in realizing economies of scale because the single-train flow capacity of commercial IGCC synthetic gas turbine plants is limited; the capacity does not exceed a net power rating of 300 MW. To address this problem, this study modeled and simulated a synthetic gas turbine with the goal of evaluating the feasibility of a 500 MW or larger IGCC plant. First, a gas turbine with the best output and efficiency was chosen for use with natural gas. The turbine was modeled using GateCycle (a simulation tool), and the integrity of the model validated by comparing the result to the design value. Next, off-design modeling was carried out for a gas turbine with synthetic gas based on its on-design model, and the result was compared with the study result of the gas turbine manufacturer. The simulation confirmed that it is possible to create a large capacity IGCC plant by undertaking the remodeling of a gas turbine designed to use natural gas into one suitable for synthetic gas.