• Title/Summary/Keyword: Lapping length

Search Result 8, Processing Time 0.02 seconds

Investigating Structural Stability and Constructability of Buildings Relative to the Lap Splice Position of Reinforcing Bars

  • Widjaja, Daniel Darma;Rachmawati, Titi Sari Nurul;Kwon, Keehoon;Kim, Sunkuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.3
    • /
    • pp.315-326
    • /
    • 2023
  • The design principles and implementation of rebar lap splice in architectural structures are governed by building regulations. Nevertheless, the minimization of rebar-cutting waste (RCW) is often impeded by the mandatory requirements pertaining to the rebar lapping zone as prescribed in design codes. In real-world construction scenarios, compliance with these rules often falls short due to hurdles concerning productivity, quality, safety, time, and cost. This discrepancy between code stipulations and on-the-ground construction practices necessitates an academic exploration. The goal of this research was to delve into the effect of rebar lap splice placement on the robustness and constructability of building edifices. The study initially took on a review of the computation of rebar lapping length and the rules revolving around the lapping zone. Following this, a structural robustness and constructability examination was undertaken, focusing on adherence to the lap splice zone. The interpretations and deductions of the research led to the following insights: (1) the efficacy of rebar lap splice is not solely contingent on the moment, and (2) the implementation of rebar lap splice beyond the specified zone can match the structural integrity and robustness of those confined within the designated area. As a result, the constraints on the rebar lapping zone ought to be revisited and possibly relaxed. The conclusions drawn from this research are anticipated to reconcile the disconnect between building codes and practical construction conditions, furnishing invaluable academic substantiation to further the endeavor of achieving near-zero RCW.

Estimation of production length of PC beam by using splice length of bottom rebar (하부철근 이음길이에 따른 PC 보 제작 길이 산정)

  • Sung, Soojin;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.84-85
    • /
    • 2014
  • Green frame is column-beam structure composed of precast concrete members. Based on Revision of Structural Concrete Design Code, the bottom rebar of beam shall be extend at least 150mm into the support member. However, if the bottom rebar extend to satisfy Revision of Structural Concrete Design Code, the installation fo beam is impossible due to interference between the columns and beams. Thus, the aim of this study is estimation of production length of precast concrete beam by using splice length of bottom rebar. In this study to solve this problem, lap splice were used on the join. This study was calculated length of the reinforcement by the diameter. According to the length of the rebar, the production length of beam concrete was calculated. The results of this study will satisfy the Revision of Structural Concrete Design Code about column-beam connection when green frame will be applied.

  • PDF

Development of an Algorithm for the Automatic Quantity Estimation of Wall Rebar

  • Kim, Do-Yeong;Suh, Sangwook;Kim, Sunkuk;Lwun Poe Khant
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.83-94
    • /
    • 2023
  • In order to devise a rebar usage optimization algorithm, it is necessary to calculate the exact rebar length and revise the arrangement of rebars into special lengths. However, the process of rearranging numerous rebars and manually calculating their quantities is time-consuming and requires significant human resources. To address this challenge, it is necessary to develop an algorithm that can automatically estimate the length of rebars and calculate their quantities. This study aims to create an automatic estimation algorithm that improves work efficiency while ensuring accurate and reliable calculations of rebar quantities. The algorithm considers various factors such as concrete cover, hook length, development length, and lapping length, mandated by the building codes, to calculate the quantity of rebars for wall structures. The effectiveness of the proposed method is validated by comparing the rebar quantities generated by the algorithm with manually calculated quantities, resulting in a difference rate of 1.14% for the hook case and 1.37% for the U-bar case. The implementation of this method enables fast and precise estimation of rebar quantities, adhering to relevant regulatory codes.

Development of Mirror~like Polishing System for Hemispherical High-¬speed Precision Bearing for Digital VTR Drum (디지탈 VTR 드럼용 반구 고속 정밀베어링의 경면연마 시스템)

  • 김정두;최민석;우기명;김영일
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1996.04a
    • /
    • pp.24-28
    • /
    • 1996
  • Mirror-like polishing system of hemisphericall high-speed precision bearing for digital VTR drum was developed. Mechamism of the polishing process was analyzed in the view point of polishing contact range and contact length between the tool and the workpiece surface. It was suggested that the two stage polishing process adoptiong the diamond grinding wheel and polishing tool instead of multistage lapping processes, which enables the mass production of the bearing by reduction of polishing time.

  • PDF

Structural Behavior of Strengthened RC Beams (보수.보강된 철근 콘크리트보의 구조적 거동에 관한 연구)

  • 오병환;조재열;강동옥
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1996.10a
    • /
    • pp.501-507
    • /
    • 1996
  • The final objectives of this study are to present the theoretical formula for reasonable structural analysis and practical codes on the repair/strengthening of damaged reinforced concrete structrues. For that purpose, in last year, preliminary experiments for flexure and shear of beam structure using carbon sheet and steel plate were performed, and in sequence, in this year, using aramid fiber sheet and steel plate more extensive experiment were performed. Repair for the performance of flexure and shear was focused on, and main variables were selected considering aplicablilty for practical field, such as, spacing of anchor bolt, lapping, jacking up, preloading level, and fiber difection as well as length of repairing plate and thickness. so new results from various angles are to be presented.

  • PDF

A Study on the Expression of Clothin & Textiles Recorded in $\ulcorner Makuranosorsi(枕草子) \lrcorner$ ("침초자"의 복식자료 연구)

  • 문광희
    • Journal of the Korean Society of Costume
    • /
    • v.28
    • /
    • pp.47-64
    • /
    • 1996
  • This paper is a study on the expression of Clothing and Textiles recorded in $\ulcorner Makuranosorsi(枕草子) \lrcorner$ This book was written by a Japanese servant in the Royal Court about the year 10000. In this book many kinds of clothing ornament color and materials were mentioned. The discoveries of this paper were as follows. 1. There were 85 different kinds of name In detail there were 46 Clothing and Accessories 32 Clors 11 Materials Patterns the method of Dyeing. 2. All the Clothing and Textiles in Makur-anosorsi were reflections of the reality of that times. 3. From ancient times japanse Costume was much influenced by Korea. but around the 7th century the influence increased. 4. Almost all clothing and Accessories used in Japan in the 10th century had been pre-viosly used in neighboring countries Korea and China But after they were imported to japan some of them were changed to japans hybrids especially in name and shape. 5. In Japan Clothing Colors were used in various ways sometimes colors coordinated by over lapping dress and othertimes the colors were weaved together Namely the width and length of these colorful fibres are also signifi-cant meaning. This meas that the Japanese was much more interested in color than other countries and this also proves Clothing Colors were very developed in japan by the 10th cen-tury. 6. The Materials discovered in this book were almost all silk This is the reason why $\ulcorner Makuranosorsi \lrcorner$ was the expression of the Royal Court.

  • PDF

AlGaAs/InGaAs/GaAs PHEMT power PHEMT with a 0.2 ${\mu}{\textrm}{m}$ gate length for MIMIC power amplifier. (MIMIC 전력증폭기에 응용 가능한 0.2 ${\mu}{\textrm}{m}$ 이하의 게이트 길이를 갖는 전력용 AlGaAs/InGaAs/GaAs PHEMT)

  • 이응호
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.27 no.4B
    • /
    • pp.365-371
    • /
    • 2002
  • In this paper, the fabricated power PHEMT devices for millimeter-wave that is below a gate-length of 0.2 $\mu\textrm{m}$ using electronic beam lithography technologies, and the DC and frequency characteristics and an output power characteristics were Measured at the various bias conditions. The unit process that is used in PHEMT's manufacture used that low-resistance ohmic contact, air-bridge and back-side lapping process technologies, and so on. The fabricated power PHEMT have an S521 gain of 4 dB and a maximum transconductance(gm) of 317 mS/mm, an unilateral current gain(fT) of 62 GHz, a maximum oscillation frequency(fmax) of 120 GHz at 35 GHz, and a maximum power output(Pmax) of 16 dBm, a power gain(GP) of 4 dB and a drain efficiency(DE) of 35.5 %.

Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar (슬래브 철근 물량 산출 자동화 알고리즘 개발)

  • Kim, Suhwan;Kim, Sunkuk;Suh, Sangwook;Kim, Sangchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.52-62
    • /
    • 2023
  • The objective of this study is to propose an automated algorithm for precise cutting length of slab rebar complying with regulations such as anchorage length, standard hooks, and lapping length. This algorithm aims to improve the traditional manual quantity take-off process typically outsourced by external contractors. By providing accurate rebar quantity data at BBS(Bar Bending Schedule) level from the bidding phase, uncertainty in quantity take-off can be eliminated and reliance on out-sourcing reduced. In addition, the algorithm allows for early determination of precise quantities, enabling construction firms to preapre competitive and optimized bids, leading to increased profit margins during contract negotiations. The proposed algorithm not only streamlines redundant tasks across various processes, including estimating, budgeting, and BBS generation but also offers flexibility in handling post-contract structural drawing changes. In particular, the proposed algorithm, when combined with BIM, can solve the technical problems of using BIM in the early phases of construction, and the algorithm's formulas and shape codes that built as REVIT-based family files, can help saving time and manpower.