• Title/Summary/Keyword: Land Development Project

Search Result 465, Processing Time 0.029 seconds

A Study on Lateral Vibration Control Method of High-speed Train (고속열차의 횡진동 제어 특성 연구)

  • Kim, Sang-Soo;Kim, Ki-Hwan;Park, Choon-Soo;Mok, Jin-Yong;Choi, Sung-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.969-974
    • /
    • 2008
  • As the railway becomes higher, the reliable stability and riding comfort of higher railway are required. To improve the riding comfort of high-speed trains, it is very helpful to use active suspension system for railway. In Japan, the high-speed train, Shinkansen has adopted semi-active suspension system and now it is running in the main trunk. In this paper, the authors introduce several technical trends of vibration control methods of Japanese Shinkansen. And the installation of semi-active suspension to HSR 350x and the test result of test run on the Kyoung-Bu high speed ling are also explained. After development of HSR 350x, new R&D national project of high speed train is progressed by Ministry of Land, Transport, and Maritime Affairs. This project is the development of Electric Multiple Unit of high speed train with 400km/h of maximum test speed. These result would be helpful to progress next generation high speed project.

  • PDF

The Netherlands Spatial Development for Port Area in City-Region Focusing on the Case of Kop van Zuid in Rotterdam

  • Lee, Hee Jae;Whang, Heejoon
    • Architectural research
    • /
    • v.22 no.4
    • /
    • pp.135-143
    • /
    • 2020
  • The Netherlands is a human-made country and an extremely well-designed European country as well. The general Dutch spatial planning for the city and environment takes place at a regional level. The local community determines the primary development conditions, and the prospect is included in a legally binding land-use plan. Especially, Rotterdam is a representative port city as the center of world trade and the gateway to western Europe. According to the history of war, the city reconstruction and the movement of the port area have led to a general change in Rotterdam and the regional redevelopment project on the southern port area of Mass river for the expansion of city functions and the balanced development. The research purpose is to understand the spatial development of the Netherlands city-region based on the analysis regarding the Kop van Zuid project, which is a representative implemented case in Rotterdam. The theoretical framework is the five dimensions and twelve indicators of territorial governance from the TANGO research project by the EU. The target case is assessed by planning and social aspect, respectively, and the results are discussed based on the theoretical framework. This research has the possibility to be utilized as advanced research by the European perspective for spatial development in other city-regions with the port area, such as Incheon and Busan in Korea.

U-City Service Classification Standard & Cost Sharing Plan through the Case Studies of U-City Construction

  • Yun, Jeong-Ran;Lee, Sang-Hun;Yang, Dong-Suk
    • Land and Housing Review
    • /
    • v.2 no.2
    • /
    • pp.101-109
    • /
    • 2011
  • Recently, the construction of U-City or of U-City service (U-service) in many kinds of urban development projects becomes the general trend. However, as the construction of U-city comes into the spotlight like the trend of the times, various service constructions are being indiscreetly implemented since it's processed focusing on local specialized projects or local landmark project by a local autonomous entity or an institute in charge being off the original purpose of the improvement of living quality of residents and the efficiency of urban management, which causes a number of problems on the process, maintenance, operation and management of those projects. Therefore, this study is to derive the standard pattern of U-service construction through the analysis of patterns and numbers of U-service and problems during the process of construction in domestic U-City construction case district, and is aimed to suggest the reasonable direction of service construction based on this. 11 projects areas in which data related to U-service are available among U-City construction project areas were selected for the subjects of this study, and it's standardized with 228 detailed unit services that were suggested by U-Eco City R&D and with 11 service domains that are regulated in "the Act of ubiquitous city construction etc.", and it is limited to services that were suggested in U-City case area of which design was completed by July, 2010 based on this. The actual state of various U-service construction is analyzed through case studies as well as reviews on the legal and theoretical concept and the method of pattern classification of U-service, the plan for the standardization (pattern classification) of U-service and the plan for the construction body of service and to share the costs are suggested as the plan to construct reasonable U-service based on this for the method and the procedure of this study For the method to construct U-service, the plan to classify the pattern of U-service into the basic service and additional service is suggested, and whether it has the publicity, whether urban infrastructure is included, whether utilities are included, the body of realization, the recipients, the urgency, the importance and the spreading, etc. are suggested for the index to determine the pattern of service. The method to get the executor of a project to construct the basic service, the method to get the executor of a project to construct the most basic service among the group classification of service and to get a private entity and a local autonomous entity to perform additional service in the future, and the method to construct the whole service and to distribute the construction costs were suggested, and the first one that determines the body of construction after dividing U-service into the basic service and the additional service was evaluated to be the most reasonable one. And the plan to solve the problem that the excessive construction costs of U-service are shifted onto the executor of a project through benefit principle, balanced distribution principle and consultation and mediation between the interested parties was suggested for the criteria to share the costs.

Development of Mobile Application for Cadastre Information Service (지적정보 서비스 모바일 애플리케이션 개발)

  • Lee, Geun-Sang;Kim, Hyoung-Jun
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.15 no.4
    • /
    • pp.55-64
    • /
    • 2012
  • This study developed a mobile application system for serving cadastral information needed to propel diverse cadastral works including cadastral resurvey efficiently. First, BlackPoint-Xr was selected as a spatial client engine to embody the cadastral information system based on mobile device including smart phone and tablet PC. The mobile cadastral information system contains functions such as finding location with GPS based on spatial information such as aerial photo, cadastral map, administrative map, and digital map, parcel search with address and lot number, finding land register including land address, the classification of land, and land price. Especially, this study developed functions which can analyze the measurement of distance, area, slope and cross-section elevation of land to apply construction work and land maintenance project. This system can support efficiently cadastral work and construction project by serving diverse cadastral information to users in field and can be also applied to the field of digital cadastral information.

Changes of River Morphology in the Mid-lower Part of Nakdong River Basin after the 4 Large River Project, South Korea (4대강 사업 후 낙동강 중·하류의 하중도와 제외지 지형변화)

  • Im, Ran-Young;Kim, Ji Yoon;Choi, Jong-Yun;Do, Yuno;Joo, Gea-Jae
    • Korean Journal of Ecology and Environment
    • /
    • v.48 no.3
    • /
    • pp.188-194
    • /
    • 2015
  • River channel dredging and riparian development have been influenced morphology and quantity of natural river habitat. We compared distribution of riverside land and alluvial island in the Nakdong River with field survey and remote sensing analysis after the 4 Large River Project in South Korea. We digitized geomorphological elements, includes main channel, riverside land, and alluvial island by using georeferenced aerial photos taken in pre-dredging (2008) and post-dredging (2012) periods. Field survey was followed in 2012 for a ground truth of digitized boundaries and identification of newly constructed wetland types such as pond, channel, branch, and riverine type. We found that during the dredging period, riverside land and alluvial island were lost by 20.2% and 72.7%, respectively. Modification rate of riverside land was higher in the section of river kilometer 50~90, 140~180, and 210~270. Alluvial island had higher change rate in the section of river kilometer 50~70, 190~210, and 270~310. Average change rate for the riverside land and alluvial island was $-1.02{\pm}0.14km^2{\cdot}10km^{-1}$ and $-0.05{\pm}0.05km^2{\cdot}10km^{-1}$, respectively. Channel shaped wetlands (72.5%) constituted large portion of newly constructed wetlands.

Decision-Making Process in Rural Reconstruction Project - An Evaluation Technique for Village Planning in Newly Reclaimed Land - (농촌개발사업의 의사결정기구 -간척지 취락계획을 위한 평가체계의 수립-)

  • 최수형;황한철
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.35 no.4
    • /
    • pp.86-94
    • /
    • 1993
  • In this study, a tentative decision-making matrix for village planning in reclaimed land was proposed. The evaluating conditions in the matrix are reclaimed farming acreage and distance. And the indexes for evaluation works are farming acreage required for increasing present farm size to target size in the base of, allowable commuting distance for farming from and effective controlling distance of each village. The village planning strategies are considered into four categories ; upkeep of present village scale, transfer of its superfluous farming acreage to a neighbouring village, enlargement of present village scale and new village construction in reclaimed land. As a case study, the proposed decision-making matrix was applied to 69 villages, which are contiguous to the potential farming area from reclamation works of Yongsan River Basin Comprehensive Development Project Phase Ill and so considered in this study as future farming villages there. From the application results, the following tactics for village planning may be proposed ; principally, upkeep or enlargement of present village scale, but, in an exceptional few cases of standard farming size being 3~5ha, new village construction of normal or satellite scale.

  • PDF

Factors Affecting the Use of the Pedestrian Malls -A Case Study on Gwangju-Sangmu Land Development Project- (보행자전용도로 이용에 영향을 미치는 요인 분석 -광주광역시 상무택지개발사업지구를 중심으로-)

  • An, Hyung-Soon;Lim, Tae-Hyeong
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.7
    • /
    • pp.406-416
    • /
    • 2013
  • This investigation aims to examine whether there is currently the proper use of pedestrian malls created in the Land Development Project areas and to come up with some suggestions for the upcoming plan to build them. The Project areas were designated as the subject of a case study to this end and, on the basis of the findings on the pedestrian movement, Stepwise Regression Analysis was performed. These can be summed up as follows. Firstly, the most important factor which had a decisive effect on the activation of pedestrian malls turned out to be the directions of the exits to the buildings adjoining the pedestrian walkways. Hence, careful consideration should be given to the facade of buildings and the obligation to install the exits to the pedestrian malls for the activation of the pedestrian walkways. Secondly, according to the findings, the use of the buildings adjoining the pedestrian malls could be a second-most-important variable. The introduction of the facilities that encourage walking and the location restriction on the facilities(accommodation facilities) that do not encourage walking should be done aggressively. Thirdly, securing the continuity between the pedestrian malls could affect the reinvigoration of the pedestrian malls. To achieve this, the crosswalks should be actively built in the early stage of development.

The Business Model & Feasibility Analysis of the Han-Ok Residential Housing Block (한옥주거단지 사업모델구상 및 타당성 분석)

  • Choi, Sang-Hee;Song, Ki-Wook;Park, Sin-Won
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.453-461
    • /
    • 2011
  • This study is to derive a project model based on potential demand for Korean-style houses, focusing on new town detached housing sites that LH supplies and to test validity of the derived model and to present the direction and supply methods of the projects. The existing high-class new town Korean-style housing developments that have been considered were found to have little business value due to problems in choice of location and discordance of demand, so 6 types of projects were established through the methods of changes in planned scale, combined use, and subdivision of plot of land based on the results of survey. The type that has the highest business value among the project models was block-type multifamily houses, and this can be interpreted as the increase in total construction area leading to increase inrevenues of allotment sales due to economies of scale. The feasibility of mass housing model in which small-scale Korean-style houses are combined with amenities was found to be high, and if the same project conditions as those of the block-type multifamily houses are applied, the business value of the Korean-style tenement houses was found to be high. Besides, the high-class housing models within block-type detached housing areas are typical projects that the private sector generally promotes, and the construction cost was found to be most expensive with 910 million won per house. In order to enhance the business value of the Korean-style housing development, collectivization such as choice of location, diversification of demand classes, optimization of house sizes, and combination of uses is needed. And in order to adopt Korean-style houses in the detached housing sites, the adjustments and division of the existing planned plots are needed, and the strategies to cope with new demand through supplying Korean-style housing types of sites can be suggested. Also breaking away from the existing uniform residential development methods, the development method through supplying original land that is natural land not yet developed besides basic infrastructures (main roads and water and sewage) can be considered, and as the construction of more than 1~2 stories building is impossible due to the structure of Korean-style house roof and furniture. So it can be suggested that original land in the form of hilly land is considered to be most suitable to large-scale development projects.

Development of an Evaluation Method and Support Policy for the Green Home Project (친환경주택평가기법개발 및 지원방안에 관한 연구)

  • Lee, Jong-Sung;Yoo, Jung-Hyun;Rhim, Joo-Ho;Kim, Hyo-Jin
    • Land and Housing Review
    • /
    • v.1 no.1
    • /
    • pp.27-34
    • /
    • 2010
  • The energy consumption of residential sectors is given a sizable portion in total energy consumption. So, improvement of building performance can be as a part of principal energy strategy. For this reason, an evaluation tool for estimation of energy consumption was developed and supportive policies were considered in this study. In particular, energy saving technology were examined to practice the green home project, among them 7 items were selected as a factor for estimating energy consumption. In addition, to the simulation study on energy consumption, heating load, hot water demand and electric consumption was also studied with actual measured value. Further more, several supportive policies were discussed to encourage green home project in Korea.

A Study on Production and Digitalization of Thematic Maps (주제도 수치지도 제작방법에 관한 연구)

  • 김영표;조윤숙
    • Spatial Information Research
    • /
    • v.6 no.1
    • /
    • pp.103-120
    • /
    • 1998
  • "The Plan for the Development of the National Geographic Information System" designates the following six major thematic maps as the main subject of digital mapping project: topographic-cadastral maps; administrative boundary maps; land use maps; road network maps; national land zoning maps; and urban planning maps. Carrying out the digital mapping project requires standards and guidelines for digitizing process. However, there is neither standards nor guidelines with regard to thematic map production. This study describes the steps involved in producing thematic maps and provides the best procedural alternative for the production of thematic maps. Based on procedural alternative suggested by this study, actual digital maps have been experimentally produced for the selected area, Anyang-Si Dongan-Gu. The results of this experimental work have been utilized to government for not only making the guidelines but also initiating plans for the development of thematic map production.roduction.

  • PDF