Kim, Sang-Soo;Kim, Ki-Hwan;Park, Choon-Soo;Mok, Jin-Yong;Choi, Sung-Hoon
Proceedings of the KSR Conference
/
2008.06a
/
pp.969-974
/
2008
As the railway becomes higher, the reliable stability and riding comfort of higher railway are required. To improve the riding comfort of high-speed trains, it is very helpful to use active suspension system for railway. In Japan, the high-speed train, Shinkansen has adopted semi-active suspension system and now it is running in the main trunk. In this paper, the authors introduce several technical trends of vibration control methods of Japanese Shinkansen. And the installation of semi-active suspension to HSR 350x and the test result of test run on the Kyoung-Bu high speed ling are also explained. After development of HSR 350x, new R&D national project of high speed train is progressed by Ministry of Land, Transport, and Maritime Affairs. This project is the development of Electric Multiple Unit of high speed train with 400km/h of maximum test speed. These result would be helpful to progress next generation high speed project.
The Netherlands is a human-made country and an extremely well-designed European country as well. The general Dutch spatial planning for the city and environment takes place at a regional level. The local community determines the primary development conditions, and the prospect is included in a legally binding land-use plan. Especially, Rotterdam is a representative port city as the center of world trade and the gateway to western Europe. According to the history of war, the city reconstruction and the movement of the port area have led to a general change in Rotterdam and the regional redevelopment project on the southern port area of Mass river for the expansion of city functions and the balanced development. The research purpose is to understand the spatial development of the Netherlands city-region based on the analysis regarding the Kop van Zuid project, which is a representative implemented case in Rotterdam. The theoretical framework is the five dimensions and twelve indicators of territorial governance from the TANGO research project by the EU. The target case is assessed by planning and social aspect, respectively, and the results are discussed based on the theoretical framework. This research has the possibility to be utilized as advanced research by the European perspective for spatial development in other city-regions with the port area, such as Incheon and Busan in Korea.
Recently, the construction of U-City or of U-City service (U-service) in many kinds of urban development projects becomes the general trend. However, as the construction of U-city comes into the spotlight like the trend of the times, various service constructions are being indiscreetly implemented since it's processed focusing on local specialized projects or local landmark project by a local autonomous entity or an institute in charge being off the original purpose of the improvement of living quality of residents and the efficiency of urban management, which causes a number of problems on the process, maintenance, operation and management of those projects. Therefore, this study is to derive the standard pattern of U-service construction through the analysis of patterns and numbers of U-service and problems during the process of construction in domestic U-City construction case district, and is aimed to suggest the reasonable direction of service construction based on this. 11 projects areas in which data related to U-service are available among U-City construction project areas were selected for the subjects of this study, and it's standardized with 228 detailed unit services that were suggested by U-Eco City R&D and with 11 service domains that are regulated in "the Act of ubiquitous city construction etc.", and it is limited to services that were suggested in U-City case area of which design was completed by July, 2010 based on this. The actual state of various U-service construction is analyzed through case studies as well as reviews on the legal and theoretical concept and the method of pattern classification of U-service, the plan for the standardization (pattern classification) of U-service and the plan for the construction body of service and to share the costs are suggested as the plan to construct reasonable U-service based on this for the method and the procedure of this study For the method to construct U-service, the plan to classify the pattern of U-service into the basic service and additional service is suggested, and whether it has the publicity, whether urban infrastructure is included, whether utilities are included, the body of realization, the recipients, the urgency, the importance and the spreading, etc. are suggested for the index to determine the pattern of service. The method to get the executor of a project to construct the basic service, the method to get the executor of a project to construct the most basic service among the group classification of service and to get a private entity and a local autonomous entity to perform additional service in the future, and the method to construct the whole service and to distribute the construction costs were suggested, and the first one that determines the body of construction after dividing U-service into the basic service and the additional service was evaluated to be the most reasonable one. And the plan to solve the problem that the excessive construction costs of U-service are shifted onto the executor of a project through benefit principle, balanced distribution principle and consultation and mediation between the interested parties was suggested for the criteria to share the costs.
Journal of the Korean Association of Geographic Information Studies
/
v.15
no.4
/
pp.55-64
/
2012
This study developed a mobile application system for serving cadastral information needed to propel diverse cadastral works including cadastral resurvey efficiently. First, BlackPoint-Xr was selected as a spatial client engine to embody the cadastral information system based on mobile device including smart phone and tablet PC. The mobile cadastral information system contains functions such as finding location with GPS based on spatial information such as aerial photo, cadastral map, administrative map, and digital map, parcel search with address and lot number, finding land register including land address, the classification of land, and land price. Especially, this study developed functions which can analyze the measurement of distance, area, slope and cross-section elevation of land to apply construction work and land maintenance project. This system can support efficiently cadastral work and construction project by serving diverse cadastral information to users in field and can be also applied to the field of digital cadastral information.
Im, Ran-Young;Kim, Ji Yoon;Choi, Jong-Yun;Do, Yuno;Joo, Gea-Jae
Korean Journal of Ecology and Environment
/
v.48
no.3
/
pp.188-194
/
2015
River channel dredging and riparian development have been influenced morphology and quantity of natural river habitat. We compared distribution of riverside land and alluvial island in the Nakdong River with field survey and remote sensing analysis after the 4 Large River Project in South Korea. We digitized geomorphological elements, includes main channel, riverside land, and alluvial island by using georeferenced aerial photos taken in pre-dredging (2008) and post-dredging (2012) periods. Field survey was followed in 2012 for a ground truth of digitized boundaries and identification of newly constructed wetland types such as pond, channel, branch, and riverine type. We found that during the dredging period, riverside land and alluvial island were lost by 20.2% and 72.7%, respectively. Modification rate of riverside land was higher in the section of river kilometer 50~90, 140~180, and 210~270. Alluvial island had higher change rate in the section of river kilometer 50~70, 190~210, and 270~310. Average change rate for the riverside land and alluvial island was $-1.02{\pm}0.14km^2{\cdot}10km^{-1}$ and $-0.05{\pm}0.05km^2{\cdot}10km^{-1}$, respectively. Channel shaped wetlands (72.5%) constituted large portion of newly constructed wetlands.
Magazine of the Korean Society of Agricultural Engineers
/
v.35
no.4
/
pp.86-94
/
1993
In this study, a tentative decision-making matrix for village planning in reclaimed land was proposed. The evaluating conditions in the matrix are reclaimed farming acreage and distance. And the indexes for evaluation works are farming acreage required for increasing present farm size to target size in the base of, allowable commuting distance for farming from and effective controlling distance of each village. The village planning strategies are considered into four categories ; upkeep of present village scale, transfer of its superfluous farming acreage to a neighbouring village, enlargement of present village scale and new village construction in reclaimed land. As a case study, the proposed decision-making matrix was applied to 69 villages, which are contiguous to the potential farming area from reclamation works of Yongsan River Basin Comprehensive Development Project Phase Ill and so considered in this study as future farming villages there. From the application results, the following tactics for village planning may be proposed ; principally, upkeep or enlargement of present village scale, but, in an exceptional few cases of standard farming size being 3~5ha, new village construction of normal or satellite scale.
This investigation aims to examine whether there is currently the proper use of pedestrian malls created in the Land Development Project areas and to come up with some suggestions for the upcoming plan to build them. The Project areas were designated as the subject of a case study to this end and, on the basis of the findings on the pedestrian movement, Stepwise Regression Analysis was performed. These can be summed up as follows. Firstly, the most important factor which had a decisive effect on the activation of pedestrian malls turned out to be the directions of the exits to the buildings adjoining the pedestrian walkways. Hence, careful consideration should be given to the facade of buildings and the obligation to install the exits to the pedestrian malls for the activation of the pedestrian walkways. Secondly, according to the findings, the use of the buildings adjoining the pedestrian malls could be a second-most-important variable. The introduction of the facilities that encourage walking and the location restriction on the facilities(accommodation facilities) that do not encourage walking should be done aggressively. Thirdly, securing the continuity between the pedestrian malls could affect the reinvigoration of the pedestrian malls. To achieve this, the crosswalks should be actively built in the early stage of development.
This study is to derive a project model based on potential demand for Korean-style houses, focusing on new town detached housing sites that LH supplies and to test validity of the derived model and to present the direction and supply methods of the projects. The existing high-class new town Korean-style housing developments that have been considered were found to have little business value due to problems in choice of location and discordance of demand, so 6 types of projects were established through the methods of changes in planned scale, combined use, and subdivision of plot of land based on the results of survey. The type that has the highest business value among the project models was block-type multifamily houses, and this can be interpreted as the increase in total construction area leading to increase inrevenues of allotment sales due to economies of scale. The feasibility of mass housing model in which small-scale Korean-style houses are combined with amenities was found to be high, and if the same project conditions as those of the block-type multifamily houses are applied, the business value of the Korean-style tenement houses was found to be high. Besides, the high-class housing models within block-type detached housing areas are typical projects that the private sector generally promotes, and the construction cost was found to be most expensive with 910 million won per house. In order to enhance the business value of the Korean-style housing development, collectivization such as choice of location, diversification of demand classes, optimization of house sizes, and combination of uses is needed. And in order to adopt Korean-style houses in the detached housing sites, the adjustments and division of the existing planned plots are needed, and the strategies to cope with new demand through supplying Korean-style housing types of sites can be suggested. Also breaking away from the existing uniform residential development methods, the development method through supplying original land that is natural land not yet developed besides basic infrastructures (main roads and water and sewage) can be considered, and as the construction of more than 1~2 stories building is impossible due to the structure of Korean-style house roof and furniture. So it can be suggested that original land in the form of hilly land is considered to be most suitable to large-scale development projects.
The energy consumption of residential sectors is given a sizable portion in total energy consumption. So, improvement of building performance can be as a part of principal energy strategy. For this reason, an evaluation tool for estimation of energy consumption was developed and supportive policies were considered in this study. In particular, energy saving technology were examined to practice the green home project, among them 7 items were selected as a factor for estimating energy consumption. In addition, to the simulation study on energy consumption, heating load, hot water demand and electric consumption was also studied with actual measured value. Further more, several supportive policies were discussed to encourage green home project in Korea.
"The Plan for the Development of the National Geographic Information System" designates the following six major thematic maps as the main subject of digital mapping project: topographic-cadastral maps; administrative boundary maps; land use maps; road network maps; national land zoning maps; and urban planning maps. Carrying out the digital mapping project requires standards and guidelines for digitizing process. However, there is neither standards nor guidelines with regard to thematic map production. This study describes the steps involved in producing thematic maps and provides the best procedural alternative for the production of thematic maps. Based on procedural alternative suggested by this study, actual digital maps have been experimentally produced for the selected area, Anyang-Si Dongan-Gu. The results of this experimental work have been utilized to government for not only making the guidelines but also initiating plans for the development of thematic map production.roduction.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.