• 제목/요약/키워드: LOPA

검색결과 13건 처리시간 0.015초

The Mutation that Makes Escherichia coli Resistant to λ P Gene-mediated Host Lethality Is Located within the DNA Initiator Gene dnaA of the Bacterium

  • Datta, Indrani;Banik-Maiti, Sarbani;Adhikari, Lopa;Sau, Subrata;Das, Niranjan;Mandal, Nitai Chandra
    • BMB Reports
    • /
    • 제38권1호
    • /
    • pp.89-96
    • /
    • 2005
  • Earlier, we reported that the bacteriophage $\lambda$ P gene product is lethal to Escherichia coli, and the E. coli rpl mutants are resistant to this $\lambda$ P gene-mediated lethality. In this paper, we show that under the $\lambda$ P gene-mediated lethal condition, the host DNA synthesis is inhibited at the initiation step. The rpl8 mutation maps around the 83 min position in the E. coli chromosome and is 94% linked with the dnaA gene. The rpl8 mutant gene has been cloned in a plasmid. This plasmid clone can protect the wild-type E. coli from $\lambda$ P gene-mediated killing and complements E. coli dnaAts46 at $42^{\circ}C$. Also, starting with the wild-type dnaA gene in a plasmid, the rpl-like mutations have been isolated by in vitro mutagenesis. DNA sequencing data show that each of the rpl8, rpl12 and rpl14 mutations has changed a single base in the dnaA gene, which translates into the amino acid changes N313T, Y200N, and S246T respectively within the DnaA protein. These results have led us to conclude that the rpl mutations, which make E. coli resistant to $\lambda$ P gene-mediated host lethality, are located within the DNA initiator gene dnaA of the host.

공정안전향상을 위한 Safety Integrity Level의 적용 방향 (Towards the Application of Safety Integrity Level for Improving Process Safety)

  • 권혁면;박희철;천영우;박진형
    • 한국안전학회지
    • /
    • 제27권5호
    • /
    • pp.64-69
    • /
    • 2012
  • The concept of SIL is applied in the most of all standards relating to functional system safety. However there are problems for the people to apply SIL to their plants. as these standards don't include sufficient informations. In this regards, this paper will suggest the direction of SIL application and concept based on IEC 61508 and IEC 61511. A Safety Integrity Level(SIL) is the discrete level(one out of possible fours), corresponding to a range of the probability of an E/E/PE (Electric/Electrical/Programmable Electrical) safety-related system satisfactorily performing the specific safety functions under all the stated conditions within a stated period of time. SIL can be divided into the target SIL(or required SIL) and the result SIL. The target SIL is determined by the risk analysis at the analysis phase of safety lifecycle and the result SIL is calculated during SIL verification at the realization phase of safety lifecycle. The target SIL is determined by the risk analysis like LOPA(Layer Of Protection Analysis), Risk Graph, Risk Matrix and the result SIL is calculated by HFT(Hardware Fault Tolerance), SFF(Safe Failure Fraction) and PFDavg(average Probability of dangerous Failure on Demand). SIL is applied to various areas such as process safety, machinery(road vehicles, railway application, rotating equipment, etc), nuclear sector which functional safety is applied. The functional safety is the part of the overall safety relating to the EUC and the EUC control system that depends on the correct functioning of the E/E/PE safety-related systems and other risk reduction measures. SIL is applied only to the functional safety of SIS(Safety Instrumented System) in safety. EUC is the abbreviation of Equipment Under Control and is the equipment, machinery, apparatus or plant used for manufacturing, process, transportation, medical or other activities.

화재폭발지수 개선에 대한 사례 연구 (Case Study on Advanced Fire and Explosion Index)

  • 나건문;서재민;이미정;백종배
    • 한국안전학회지
    • /
    • 제35권6호
    • /
    • pp.78-84
    • /
    • 2020
  • The F&EI technique is one of the risk assessments with many advantages. It can save time and effort compared to quantitative risk assessment (QRA). By using the evaluation result of this technique, it is possible to check the effectiveness of the investment cost. In addition, a relative risk ranking can be created and used to establish the facility management cycle and to prioritize investment. However, evaluating the target process can be evaluated more than the actual risk since the LCCF, a loss prevention measure, is too limited. In addition, calculating premiums via this method can result in excessive premiums, making it difficult to evaluate the risk precisely. Therefore, new safety guard was added to the LCCF of the F&EI risk assessment with reference to HAZOP and LOPA techniques. Newly added LCCFs are Deflagration arrester, Check valve, SIS, and Vacuum beaker, etc. As a case study, F&EI risk assessment was performed on Acetone storage tank of a API (Active pharmaceutical ingredient) plant to compare actual MPPD. The estimated loss amount was 592,558$ for the existing technique and 563,571$ for the improved technique, which was reduced by about 5% compared to the previous one.This proved that a more precise evaluation is possible and that the efforts for safety at the workplace are reflected in the evaluation results.