• Title/Summary/Keyword: LOAD CELL

Search Result 1,188, Processing Time 0.03 seconds

A Study on the Utility Interactive Photovoltaic System using a Chopper and a PWM Inverter (쵸퍼와 PWM 전압형 인버터를 이용한 계통연계형 태양광발전시스템에 관한 연구)

  • 유택빈;성낙규;이승환;김성남;이훈구;한경희
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.3 no.2
    • /
    • pp.131-137
    • /
    • 1998
  • The solar cells should be operated at the maximum power point because its output characteristics are greatly fluctuated on the variation of insolation, temperature and load. Photovoltaic system needs an inverter which can interface the dc output power of solar cell with the residential ac load. The inverter has to supply a sinusoidal current and voltage to the load and the utility line with a high power factor. This paper proposes an utility interactive photovoltaic system designed with a step-up chopper and a PWM voltage source inverter. The step-up chopper operates in continuous mode by adjusting the duty ratio so that the photovoltaic system tracks the maximum power points of solar cell without any influence on the variation of insolation and temperature. The voltage source inverter operates in a manner that its output voltage is in phase with the utility voltage. The inverter supplies an ac power with high factor and low level of harmonics to the load and the utility power system.

Efficiency Analysis of Compact Type Steam Reformer (컴팩트형 수증기 개질장치 효율분석)

  • Oh, Young-Sam;Song, Taek-Yong;Baek, Young-Soon;Choi, Lee-Sang
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.13 no.4
    • /
    • pp.304-312
    • /
    • 2002
  • In this study, the performance of the $5Nm^3/hr$ compact type steam reformer which was developed for application of fuel cell or hydrogen station was evaluated in terms of gas process efficiency. For these purposes, reforming efficiency and total efficiency with system load change were analyzed. The reforming efficiency was calculated from the total molar flow of hydrogen output over total fuel flow input to the reformer and the burner on the higher heating value(HHV). In the case of the total efficiency, recovered heat at the heat recovery exchanger was considered. From the results, it was known that system performance was stable, because methane conversion showed the a slight decline which is about 2% though increasing system load to full. Reforming efficiency was increased from 20% to 58%, respectively as increasing system load from 10% to 90%. It was found that total efficiency was higher then reforming efficiency because of terms of heat recovered. As a results, it was known that total efficiency was increased form 75% to 83% at the 10% and 90% system load, respectively. From these results, it is concluded that compact steam reformer which is composed of stacking plate-type reactors is suitable to on-site hydrogen generator or to fuel cell application because of quick start within 1 hr and good performance.

The Effect of the Bolted Joint Stiffness on the Thrust Measurement Stand (볼트의 체결 강성이 추력 시험대에 미치는 영향)

  • Lee, Kyujoon;Jung, Chihoon;Ahn, Dongchan
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.20 no.5
    • /
    • pp.31-39
    • /
    • 2016
  • This paper is studied on the effect of the bolt joint stiffness on the Thrust Measurement Stand(TMS). TMS is a test stand for thrust performance of the propulsion system, which depends on two factors: The $1^{st}$ is the parallel degree between directions of the thrust vector and action lines of the corresponding measuring load cells for the vector, and the $2^{nd}$ is the orthogonality between action lines of the measuring load cells. Therefore, it is essential to maintain the original shape of the TMS under operating conditions. In this paper, it is examined how the geometric tolerance of the bolt joints and threads of the load cell trains affect the performance of the TMS. Also, some techniques to overcome related problems are proposed.

A Power Management Unit for Solar Energy Harvesting (빛 에너지 하베스팅을 위한 전력관리회로)

  • Yoon, Eun-Jung;Hwang, In-Ho;Park, Jong-Tae;Yu, Chong-Gun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2012.10a
    • /
    • pp.267-271
    • /
    • 2012
  • In this paper a power management unit for solar energy harvesting is proposed. If solar energy is sufficient, Power Management Unit(PMU) directly supplies load with solar energy. By contrast, if solar energy is insufficient to operate sensor nodes, voltage booster(VB) boosts the solar cell's output voltage, and then PMU supplies load with the harvested energy. The designed circuit had been fabricated using a 018um CMOS process. In the first case, the PMU supplies load with more energy than in the second case. In the second case where a VB is used, the PMU operates to supply load with solar energy even when illumination is low and minimum solar cells with very low output voltage are used.

  • PDF

A Study for Improving Performance of ATM Multicast Switch (ATM 멀티캐스트 스위치의 성능 향상을 위한 연구)

  • 이일영;조양현;오영환
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.24 no.12A
    • /
    • pp.1922-1931
    • /
    • 1999
  • A multicast traffic’s feature is the function of providing a point to multipoints cell transmission, which is emerging from the main function of ATM switch. However, when a conventional point-to-point switch executes a multicast function, the excess load is occurred because unicast cell as well as multicast cell passed the copy network. Additionally, due to the excess load, multicast cells collide with other cells in a switch. Thus a deadlock that losses cells raises, extremely diminishes the performance of switch. An input queued switch also has a defect of the HOL (Head of Line) blocking that less lessens the performance of the switch. In the proposed multicast switch, we use shared memory switch to reduce HOL blocking and deadlock. In order to decrease switch’s complexity and cell's processing time, to improve a throughput, we utilize the method that routes a cell on a separated paths by traffic pattern and the scheduling algorithm that processes a maximum 2N cell at once in the control part. Besides, when cells is congested at an output port, a cell loss probability increases. Thus we use the Output Memory (OM) to reduce the cell loss probability. And we make use of the method that stores the assigned memory (UM, MM) with a cell by a traffic pattern and clears the cell of the Output memory after a fixed saving time to improve the memory utilization rate. The performance of the proposed switch is executed and compared with the conventional policy under the burst traffic condition through both the analysis based on Markov chain and simulation.

  • PDF

Development of an Improved Point Load Apparatus (개량형 점하중강도시험기의 개발)

  • Kim, Yong-Phil;Um, Jeong-Gi
    • Tunnel and Underground Space
    • /
    • v.19 no.6
    • /
    • pp.473-478
    • /
    • 2009
  • The accuracy of point load apparatus is depend on point to point coaxial fitting. Also, the estimation of applied point load using the pressure gauge frequently lead to erroneous results. An improved point load apparatus has been developed in this study by mounting linear bearing on polished support rod, and eccentric error of point to point axis has been sustained less than 0.1 mm even under series of extreme work load conditions. Two digital displacement gauges are attached to measure the distance from point to point with sample specimen. A load cell mounted at the end of upper conical platen measure the applied net load on sample instead of preassure gauge. Total of 107 point load tests has been achieved to assure the quality and performance of developed apparatus. This exercise turned out to be successful.

Design of Drilled Shafts Foundation by LRFD in Incheon Bridge Project (인천대교 민자구간의 대구경 현장타설 말뚝기초의 LRFD 설계 적용 사례)

  • Kim, Jeong-Hwan;Lee, Hyun-Gun;Shin, Hyun-Yang;Youn, Man-Geun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.551-561
    • /
    • 2006
  • Incheon bridge project is to construct total 12km long bridges on the sea consist of 800m span length cable stayed bridge, approach bridge and viaduct bridge based on LRFD design specification. To design pile foundations by RCD of each bridge unit, total 4 number of preliminary full scale pile load tests with Osterberg cell method were carried out on the piles for testing. The test load was planned to more than the expected design ultimate capacity and about 29,000tons maximum load was recorded. From the interpretation of test results, design parameters are evaluated and applied to the design. Preliminary pile load test plan and detailed execution of pile load tests are introduced and summarized. The resistance factors are presented for pile design of Incheon Bridge Project in LRFD considering variation of ground conditions and number of test piles.

  • PDF

Interference Cancellation and Load Balancing in Heterogeneous Cellular Networks (이기종 셀룰러 네트워크에서 간섭 제거와 로드 밸런싱)

  • Lee, Kyoung-Jae;Jo, Han-Shin
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.51 no.10
    • /
    • pp.45-49
    • /
    • 2014
  • In this paper, the performance of the interference cancellation using multiple receive antennas is evaluated for heterogeneous cellular systems when user association and load balancing problems are optimized for cell edge users. The simulation results show that the interference cancellation method remarkably improves the rate performance of load-balanced cells.

Performance Tests and Development of the Cyclic Load Device Using a Bellows (벨로우즈를 이용한 반복 하중부과장치의 개발 및 성능시험)

  • Choi, Myoung-Hwan;Cho, Man-Soon;Park, Sung-Jae;Kim, Bong-Goo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.31 no.9
    • /
    • pp.903-909
    • /
    • 2007
  • A fatigue capsule is one of the special capsules to investigate the fatigue characteristics of the nuclear materials during an irradiation test in a research reactor, HANARO. In this study, the performance test and the preliminary fatigue test results by using a cyclic load device newly developed for a fatigue capsule are described. In order to obtain the characteristics such as a realization and a controllability of the periodic wave shape and the relationship between the pressure and the load, a spring and rigid bar specimens are used. The fatigue test for the 316L stainless steel specimen with 1.8mm in diameter and 12.5mm in gage length is also performed under the same conditions as the temperature($550^{\circ}C$) of the specimen during irradiation tests. As a result of the test, the fracture of the specimen occurs at a total of 70,120 cycles(about 12 days), and the displacement in this case is 2.02 mm. It is expected that these results will be used for determining test conditions and a comparison of the in-pile fatigue test results.

The Study of Single Phase Source Stability consider for The DSC Cell's Operation Character by Controlled Feed-back Circuit

  • Lee, Hee-Chang
    • Journal of information and communication convergence engineering
    • /
    • v.4 no.4
    • /
    • pp.170-173
    • /
    • 2006
  • Recently, with increasing efficiency of DSC (photo-electrochemical using a nano-particle), The Performance of DSC solar generation system also needs improvement. The approach consists of a Fly-back DC-DC (transfer ratio 1:10) converter to boost the DSC cell voltage to 300VDC. The four switch (MOSFET) inverter is employed to produce 220V, 60Hz AC outputs. High performance, easy manufacturability, lower component count., safety and cost are addressed. Protection and diagnostic features form an important part of the design. Another highlight of the proposed design is the control strategy, which allows the inverter to adapt to the: requirements of the load as well as the power source. A unique aspect of the design is the use of the DSP TMS320LF2406 to control the inverter by current and voltage feed-back. Efficient and smooth control of the: power drawn from the DSC Cell is achieved by controlling the front end DC-DC converter in current mode.