• Title/Summary/Keyword: LNG fuel

Search Result 248, Processing Time 0.023 seconds

Study on the Improvement of Efficiency in Dehydration Process of LNG Liquefaction Plant Using Molecular Sieve (분자체를 이용한 LNG 액화 플랜트 탈수 공정의 효율성 향상에 관한 연구)

  • JONGHWA PARK;DONSANG YU;DAEMYEONG CHO
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.35 no.1
    • /
    • pp.105-113
    • /
    • 2024
  • The natural gas dehydration process plays a central role in liquefying LNG. This study proposes two natural gas dehydration process systems applicable to liquefied natural gas (LNG) liquefaction plants, and compares and analyzes energy optimization measures through simulation. The fuel gas from feed stream (FFF) case, which requires additional equipment for gas circulation, disadvantages are design capacity and increased energy. On the other hand, the end flash gas (EFG) case has advantages such as low initial investment costs and no need for compressors, but has downsides such as increased power energy and the use of gas with different components. According to the process simulation results, the required energy is 33.22 MW for the FFF case and 32.86 MW for the EFG case, confirming 1.1% energy savings per unit time in the EFG case. Therefore, in terms of design pressure, capacity, device configuration, and required energy, the EFG case is relatively advantageous. However, further research is needed on the impact of changes in the composition of regenerated gas on the liquefaction process and the fuel gas system.

New reliquefaction system of Boil-Off-Gas by LNG cold energy (LNG냉열이용 BOG 재액화긍정 해석연구)

  • 윤상국;최형식
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.26 no.2
    • /
    • pp.256-263
    • /
    • 2002
  • The Boil-Off-Gases(BOG) in the LNG production terminal are continuously generated during the unloading, storage and supply processes by the heat penetration. In order to use these gases as useful fuel, the reliquefaction process should be installed to put the reliquefied BOG in the main LNG supply line before the secondary pump in terminal. The current reliquefaction method of BOG in LNG terminal is the direct contact one between LNG and BOG in the absorption column. But the system has severe disadvantage, which is the 10 times of LNG circulation needed for unit mass of BOG reliquefaction. It causes, therefore, high power consumption of LNG circulation pump and excessive city-gas supply, even if short demand of NG is needed in the summer time. In this paper, the new reliquefaction system of BOG by using LNG cold energy with indirect contact in precooler was suggested and analysed. The result showed new indirect contact method of BOG reliquefaction system between LNG cold energy and BOG is much more effective than the current direct contact one because of only about 1.3 times of LNG circulation needed and higher energy saving by pump power reduction.

Analyses of GHG Reduction Effectiveness and Economic Feasibility in the Wood Pellet Fuel Switching Project (목재 펠릿 연료전환 사업의 온실가스 감축 효과 및 경제성 분석)

  • Lee, Jin-Chul;Kang, Kyu-Young
    • Journal of the Korean Wood Science and Technology
    • /
    • v.41 no.6
    • /
    • pp.594-605
    • /
    • 2013
  • This study was performed to analyze GHG (Greenhouse gas) reduction effectiveness and economic feasibility in the wood pellet fuel switching project using JCDM (Japan Clean Development Mechanism) and KVER (Korea Voluntary Emission Reduction)data. The major data for the analyses consist of investment costs, annual GHG reductions, fuel prices and GHG credit prices. The wood pellet fuel switching projects are the $CO_2$-zero projects. Therefore, these projects are essential to accomplish the GHG mitigation target, especially in Korea. In order to raise the economic feasibility of the wood pellet fuel switching project, the results of this study suggest that the Korean government should reduce the price of wood pellet through the supply on a large scale and raise the KCER price of wood pellet fuel switching project.

Crash Safety Evaluation of LNG Fuel Containers for Vehicles using ANSYS Explicit Dynamics (ANSYS Explicit Dynamics 해석을 활용한 차량용 LNG 용기의 충돌안전성 평가)

  • Nam, SuHyun;Kim, JiYu;Kim, EuiSoo
    • Journal of the Korean Institute of Gas
    • /
    • v.26 no.4
    • /
    • pp.58-63
    • /
    • 2022
  • With the emergence of environmental problems caused by fine dust worldwide, LNG, which is cheaper and less pollution than diesel, is attracting attention as the next generation energy of automobiles and is expanding its supply. However, it is difficult to operate smoothly due to the lack of infrastructure for LNG charging stations in Korea and the limited size of containers that can be installed according to regulations. In Korea, research and development on the contents of containers for the smooth operation of natural gas vehicles are underway, but there is a problem that the container directly receives the impact of the vehicle collision and explodes, causing a major disaster. Therefore, in this study, the safety of the container was verified by deriving the strain and stress values through ANSYS Explicit Dynamics analysis. As a result, a maximum stress of 565.37MPa occurred in the container, and it is expected that plastic deformation will occur as it exceeds the yield stress of STS304 used as a material for the container, which is beyond 505MPa. When an impact caused by a collision between a vehicle and a container is applied, it is considered necessary to design a support or reinforcement because the container may be damaged or defective.

A Study on the 'Extended' DSM Programs in Korean LNG Market (산업용 천연가스 수요관리 프로그램 최적화를 위한 동태적 시뮬레이션에 관한 연구)

  • Chang, Han-Soo;Choi, Ki-Ryun
    • Environmental and Resource Economics Review
    • /
    • v.11 no.2
    • /
    • pp.211-231
    • /
    • 2002
  • This paper summarizes the results of a study that assess how a demand side management (DSM) system addresses key economic and environmental challenges facing in the Korean natural gas sector considering; ${\bullet}$ high discrepancies of seasonal consumption volume and of load factor in unmatured domestic LNG market, ${\bullet}$ unfavorable and volatile international LNG market, imposing with the contestable "take-or-pay" contract terms, ${\bullet}$ low profile of LNG and existence of market barriers against an optimal fuel mix status in the industrial energy sector. A particular focus of this study is to establish an 'extended' DSM system in the unmatured gas market, especially in industry sector, that could play a key role to assure an optimum fuel mix scheme. Under the concept of 'extended' DSM, a system dynamics modeling approach has been introduced to explore the option to maximize economic benefits in terms of the national energy system optimization, entailing different ways of commitments accounting for different DSM measures and time delay scenarios. The study concludes that policy options exist that can reduce inefficiencies in gas industry and end-use system at no net costs to national economy. The most scenarios find that, by the year 2015, it is possible to develop a substantial potential of increased industrial gas end-uses under more reliable and stable load patterns. Assessment of sensitivity analysis suggests that time delay factor, in formulating DSM scenarios, plays a key role to overcome various market barriers in domestic LNG market and provides a strong justification for the policy portfolios 'just in time' (time accurateness), which eventually contribute to establish an optimum fuel mix strategy. The study indicates also the needs of advanced studies based on SD approach to articulate uncertainty in unmatured energy market analysis, including gas.

  • PDF

Planning research for Floating Power Plant by modifying LNG carriers (LNG선 개조 발전플랜트 기획연구)

  • Lee, Kangki;Bae, Jaeryu;Shin, Jaewoong;Park, Jongbok
    • Plant Journal
    • /
    • v.16 no.3
    • /
    • pp.37-41
    • /
    • 2020
  • Lately old LNG carriers increased and ship price is getting down. So Interest for reuse and modification of used LNG carriers is growing. Also the needs for replacement of old power plant is increasing. Additionally eco friendly fuel such as LNG become attractive. Consequently gas power plant is getting much more popular than before. So in this research planning, we consider the floating power plant by modifying LNG carriers. This plant has the various function including storage, power plant and bunkering fuction etc. Through this multifunctional plant, we are ready for the old power plant shutdown and energy crisis in the future when we can supply the urgent mobile floating power plant quickly in time.

Seismic Design for Application of LNG Storage Tank Isolation System (LNG 저장탱크의 면진시스템 적용을 위한 내진설계)

  • Seo, Ki-Young;Park, Hyun-Jae;Kim, Nam-Sik;Kim, Jae-Min;Yang, Seong-Yeong
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.24 no.3
    • /
    • pp.227-235
    • /
    • 2014
  • The demand of natural gas is gradually increasing as a clean fuel in the world. Therefore, LNG storage tanks and related facilities of the importance of leading a community-based facility have emerged. The seismic design of LNG storage tank including seismic analysis have been developed steadily. But, the seismic analysis and design techniques for LNG storage tanks are lacking, in Korea. Consequently, it is necessary to develop an analysis model that LNG storage tanks in isolation system can describe the behavior. Further, LNG storage tank capable of ensuring safety and economy, it is necessary to develop design techniques. The studies have suggested seismic design procedures of LNG storage tanks with isolation system including triple-FPB and idealized complex hysteresis model of triple-FPB.

A Development of an 3.4L-class Diesel-LNG Dual Fuel Engine for Farming Machine (3.4L 급 농기계용 디젤-천연가스 혼소 엔진 개발)

  • Sim, Juhyen;Ko, Chunsik;Lee, Sangmin;Lee, Okjae;Lee, Chang-Eon
    • 한국연소학회:학술대회논문집
    • /
    • 2012.11a
    • /
    • pp.187-190
    • /
    • 2012
  • An experimental study was performed to provide the effect of PM reduction and the improvement of diesel alternative ratio utilizing diesel-natural gas dual-fuel combustion mode in a retrofit 3.4-liter diesel engine. In order to achieve the same power as the original diesel engine, engine control unit (ECU) of the dual-fuel engine was calibrated. As a result, diesel alternative ratio was found that the maximum value of diesel alternative ratio was about 96%. Finally PM emission experiment was performed in C1-8 mode cycle and it was shown PM emission was extremely reduced down to $7.42{\ast}10^{-7}g/kWh$ comparing with mechanical diesel engine.

  • PDF

Improvement of Insulation System for LNG Storage Tank Base Slab (LNG 저장탱크 바닥판 단열 시스템 개선)

  • Lee, Yong-Jin;Lho, Byeong-Cheol
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.141-147
    • /
    • 2010
  • Liquefied natural gas(LNG) is natural gas that has been converted temporarily to liquid form for ease of storage and transport it. Natural gas is the worlds cleanest burning fossil fuel and it has emerged as the environmentally preferred fuel of choice. In Korea, the demand of this has been increased since the first import from the Indonesia in 1986. LNG takes up about 1/600th the volume of natural gas in the gaseous state by cooling it to approximately $-162^{\circ}C(-260^{\circ}F)$. The reduction in volume therefore makes it much more cost efficient to transport and store it. Modern LNG storage tanks are typically the full containment type, which is a double-wall construction with reinforced concrete outer wall and a high-nickel steel inner tank, with extremely efficient insulation between the walls. The insulation will be installed to LNG outer tank for the isolation of cryogenic temperature. The insulation will be installed in the base slab, wall and at the roof. According to the insulation's arrangement, the different aspects of temperature transmission is shown around the outer tank. As the result of the thermal & stress analysis, by the installing cellular glass underneath the perlite concrete, the temperature difference is greatly reduced between the ambient temperature and inside of concrete wall, also reducing section force according to temperature load.