• 제목/요약/키워드: LNG carrier cargo

검색결과 69건 처리시간 0.022초

LNG 운반선의 구형 화물창 슬로싱 해석 (Sloshing Load Analysis in Spherical Tank of LNG Carrier)

  • 노병재
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2005년도 특별논문집
    • /
    • pp.22-30
    • /
    • 2005
  • Sloshing loads, produced by the violent liquid free-surface motions inside the cargo tank have become an important design parameter in ship building industry since there have been demands for the increased sizes of the cargo containment system of LNG carriers. In this study, sloshing impact pressure acting on the shell of the spherical cargo tank of an LNG carrier as well as dynamic pressure and flow behavior around the pump tower located at the center of the tank have been calculated. Comparative numerical sloshing simulations for a spherical LNG tank using 2-D LR.FLUIDS which is based on the finite difference method and 3-D MSC.DYTRAN which is capable of calculating nonlinear fluid-structure interaction have been carried out. A method of calculating sloshing-induced dynamic loads and the subsequent structural strength analysis for pump tower of a spherical LNG carrier using MSC. DYTRAN and MSC.NASTRAN have been presented.

  • PDF

가스추진 LNG 운반선의 가스 압축기실에 설치된 가스검출장치의 최적 배치에 관한 연구 (Optimal Gas Detection System in Cargo Compressor Room of Gas Fueled LNG Carrier)

  • 이상원;소예덕;이승훈;이진욱;정은석;강호근
    • 해양환경안전학회지
    • /
    • 제25권5호
    • /
    • pp.617-626
    • /
    • 2019
  • 본 연구는 가스추진 174K급 LNG 운반선의 가스 압축기실에서 발생하는 가스누출 모사를 통해 가스탐지기의 최적 위치를 분석하였으며, 새로 개정된 IGC 코드에 명시된 안전규정을 만족하는 합리적인 방법도 함께 제안하였다. 가스압축기실에서의 LNG 가스누출 수치해석을 위해, 실제 ME-GI 엔진이 장착된 174K급 LNG 운반선의 압축기실 형상과 장비, 배관의 배치와 같은 치수로 3D 설계되었다. 가스누설에 대한 시나리오는 305 bar의 높은 압력과 1 bar의 낮은 압력을 적용하여 진행하였다. 고압용 핀홀의 크기는 4.5, 5.0, 5.6 mm이고 저압용은 100, 140 mm이다. 해석 결과, 5.6 mm 핀홀(고압)과 100, 140 mm 핀홀(저압) 상태의 누출에 대한 환기평가에서 가연성 가스농도는 심각한 위험이 없음을 확인하였다. 그러나 개정된 IGC 코드에 따라 설치된 압축기실의 가스 감지 센서의 실제 위치는 다른 지점으로 이동해야 하고, 측정 지점이 현 규정에서 요구하는 것보다 더 추가되어야 함을 확인하였다.

LNG선의 화물 하역 배관망의 과도 응답 해석에 관한 연구 (A Study on the In-Pipe Surge Analysis for Cargo Unloading Piping System of LNG Carrier)

  • 천병일;우종식
    • 대한조선학회논문집
    • /
    • 제33권1호
    • /
    • pp.124-134
    • /
    • 1996
  • 본 연구에서는 LNG선의 화물하역 중 비상 상황시 펌프를 정지시키고 선박측의 긴급 차단 밸브 및 육상측의 정지 밸브를 폐쇄시킬 때, 관내 유체의 급격한 속도변화에 의하여 발생하는 비정상 유동 상태인 서지(Surge)현상의 원인을 고찰하고, 이 때 발생하는 상승압력과 유량의 변화를 계산하였다. 해석 결과에 의하면 서지현상에 의한 과도한 압력상승은 선박측의 긴급 차단 밸브 및 육상측의 정지 밸브의 종류와 이들의 폐쇄 시간, 그리고 배관 배치에 크게 영향을 받음을 알 수 있었다.

  • PDF

MRV형 LNG선의 선체온도분포 및 증발률 산정에 관한 연구 (A Study on the Computation of Hull Temperature Distribution and Boil off Ratio of MRV Type LNG Carrier)

  • 천병일;김용모;김경근
    • 대한기계학회논문집
    • /
    • 제18권4호
    • /
    • pp.986-996
    • /
    • 1994
  • Insulation system of LNG carrier has made important roles such as maintaining a proper Boil off Ratio(BOR) for the cargo and avoiding the excessive low temperature of the adjacent inner hull beyond the permissible limit. At the same time, safety and economy of the LNG transportation by the ship are connected with the performance of the insulation system. Also, thermal insulation system of LNG carrier is one of the most advanced technique with the structure analysis of tank, welding and assembling. In this study a computer program is developed to calculate the hull temperature distribution and BOR, which are important factors in thermal design for the Moss Rosenberg Verft spherical tank type LNG carrier. Detailed results for hhull temperature distribution close to LNG tank, BOR and the thickness effect of insulation material are reported in this paper in the range of standare design sea condition.

A Study on Determining the Priority of Supervising Mooring Line while 125K LNG Moss Type Discharging at Pyeong Taek Gas Terminal

  • Kim, Jong Sung
    • 해양환경안전학회지
    • /
    • 제25권3호
    • /
    • pp.278-286
    • /
    • 2019
  • The Port of Pyeong Taek is located on the west coast, meaning that the difference between the rise and fall of tide is great (flood tide 1.8 to 2.9 knots, ebb tide 1.6 to 2.9 knots). Due to mainly N~NW'ly strong winds & high waves during winter, navigating as well as loading & discharging vessels must focus on cargo handling. The strong tidal and wind forces in the Port of Pyeong Taek can push an LNG carrier away from its berth, which will end up causing forced disconnection between the vessel's cargo line and shore-side loading arm. The primary consequence of this disconnection will be LNG leakage, which will lead to tremendous physical damage to the hull and shore-side equipment. In this study, the 125K LNG Moss Type ship docked at No. 1 Pier of the Pyeong Taek is observed, and the tension of the mooring line during cargo handling is calculated using a combination of wind and waves to determine effective mooring line and mooring line priority management. As a result if the wind direction is $90^{\circ}$ to the left and right of the bow, it was found that line monitoring should be performed bearing special attention to the Fore Spring Line, Fore Breast Line, and Aft Spring Line.

Development of partial liquefaction system for liquefied natural gas carrier application using exergy analysis

  • Choi, Jungho
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제10권5호
    • /
    • pp.609-616
    • /
    • 2018
  • The cargo handling system, which is composed of a fuel gas supply unit and cargo tank pressure control unit, is the second largest power consumer in a Liquefied Natural Gas (LNG) carrier. Because of recent enhancements in ship efficiency, the surplus boil-off gas that remains after supplying fuel gas for ship propulsion must be reliquefied or burned to regulate the cargo tank pressure. A full or partial liquefaction process can be applied to return the surplus gas to the cargo tank. The purpose of this study is to review the current partial liquefaction process for LNG carriers and develop new processes for reducing power consumption using exergy analysis. The developed partial liquefaction process was also compared with the full liquefaction process applicable to a LNG carrier with a varying boil-off gas composition and varying liquefaction amounts. An exergy analysis showed that the Joule-Thomson valve is the key component needed for improvements to the system, and that the proposed system showed an 8% enhancement relative to the current prevailing system. A comparison of the study results with a partial/full liquefaction process showed that power consumption is strongly affected by the returned liquefied amount.

Membrane Type LNG선의 3차원 정상상태 온도분포 및 BOR 계산 프로그램 개발에 관한 연구 (A Study on the Three-Dimensional Steady State Temperature Distributions and BOR Calculation Program Development for the Membrane Type LNG Carrier)

  • 이정혜
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제23권2호
    • /
    • pp.140-149
    • /
    • 1999
  • This study is on the development of the computer program that calculates a 3-D hull temperadistribution and analyzes BOR(Boil off rate) to be important to the heat design of a membrane type LNG carrier. The quarter of a tank is taken as an calculation model. And the thermal conductivity of insulation is assumed to be the function of a temperature. In the present steady state calculation, the temperature of LNG in a cargo tank is assumed to be -$162^{\circ}C$ and the air temperature of a cofferdam, to be +$5^{\circ}C$. The lowest air temperature in compartments is calculated as $21.39^{\circ}C$ under the USCG condition ($T_{air}=-18^{\circ}C,\;T_{sw}=O^{\circ}C)$ and B.O.R value is O.0977%/day under the maximum boil-off condition, IMO IGC ($T_{air}=45^{\circ}C,\;T_{sw}=32^{\circ}C$), which satisfies the requirement by KOGAS. The calculated temperature distribution over tank panels at each condition is maximum 3% less than GTT's results. From the results of this study, it can be concluded that the present design of LNG cargo tank satisfies the requirement by KOGAS.

  • PDF

Sloshing design load prediction of a membrane type LNG cargo containment system with two-row tank arrangement in offshore applications

  • Ryu, Min Cheol;Jung, Jun Hyung;Kim, Yong Soo;Kim, Yooil
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제8권6호
    • /
    • pp.537-553
    • /
    • 2016
  • This paper addresses the safety of two-row tank design by performing the extensive sloshing model tests. Owing to the uncertainties entangled with the scale law transforming the measured impact pressure up to the full scale one, so called comparative approach was taken to derive the design sloshing load. The target design vessel was chosen as 230 K LNG-FPSO with tow-row tank arrangement and the reference vessel as 138 K conventional LNG carrier, which has past track record without any significant failure due to sloshing loads. Starting with the site-specific metocean data, ship motion analysis was carried out with 3D diffraction-radiation program, then the obtained ship motion data was used as 6DOF tank excitation for subsequent sloshing model test and analysis. The statistical analysis was carried out with obtained peak data and the long-term sloshing load was determined out of it. It was concluded that the normalized sloshing impact pressure on 230 K LNG-FPSO with two-row tank arrangement is higher than that of convectional LNG carrier, hence requires the use of reinforced cargo containment system for the sake of failure-free operation without filling limitation.

Development of MK $III^{TM}$ Type Large Arctic LNG Carrier

  • Suh, Yong-Suk;Jang, Ki-Bok;Ito, Hisashi;Park, Seung-Mun;Chung, Sung-Wook;Han, Sung-Yong
    • Journal of Ship and Ocean Technology
    • /
    • 제11권3호
    • /
    • pp.24-38
    • /
    • 2007
  • It is a very challenging work to design large Arctic LNG carrier, since LNG carrier requires high reliability for the structural safety and the environment of Arctic region is known to be very severe. Therefore, special attention should be paid for the verifying the structural safety of LNG career particularly with regard to LNG leakage. In this paper, the safety of the hull structure and cargo containment system of 208K MK $III^{TM}$ type LNG carriers with Arc4 is investigated based on the direct calculation of ice loads as well as wave loads. From the whole investigation, it is clear that the developed vessel - 208K MK $III^{TM}$ type LNG carrier with RMRS Ice class Arc4 - has enough strength and is safe to be operated in Arctic region.