• Title/Summary/Keyword: LNG FPSO

Search Result 42, Processing Time 0.029 seconds

Determination of the Optimal Operating Condition of Dual Mixed Refrigerant Cycle of LNG FPSO Topside Liquefaction Process (LNG FPSO Topside의 액화 공정에 대한 이중 혼합 냉매 사이클의 최적 운전 조건 결정)

  • Lee, Joon-Chae;Cha, Ju-Hwan;Roh, Myung-Il;Hwang, Ji-Hyun;Lee, Kyu-Yeul
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.49 no.1
    • /
    • pp.33-44
    • /
    • 2012
  • In this study, the optimal operating conditions for the dual mixed refrigerant(DMR) cycle were determined by considering the power efficiency. The DMR cycle consists of compressors, heat exchangers, seawater coolers, valves, phase separators, tees, and common headers, and the operating conditions include the equipment's flow rate, pressure, temperature, and refrigerant composition per flow. First, a mathematical model of the DMR cycle was formulated in this study by referring to the results of a past study that formulated a mathematical model of the single mixed refrigerant(SMR) cycle, which consists of compressors, heat exchangers, seawater coolers, and valves, and by considering as well the tees, phase separators, and common headers. Finally, in this study, the optimal operating conditions from the formulated mathematical model was obtained using a hybrid optimization method that consists of the genetic algorithm(GA) and sequential quadratic programming(SQP). Moreover, the required power at the obtained conditions was decreased by 1.4% compared with the corresponding value from the past relevant study of Venkatarathnam.

Energy System Analysis of LNG-FPSO Pre-Ttreatment Processes by Heat Integration Technique (LNG-FPSO 전처리 공정 에너지 시스템 분석)

  • Cho, Ha-bin;Kim, Jin-Kuk;Min, Kwang-Jun;Lim, Dong-Ha
    • Plant Journal
    • /
    • v.8 no.4
    • /
    • pp.40-44
    • /
    • 2012
  • The pre-treatment of natural gas to remove $H_2S$ and $CO_2$ before liquefaction in natural gas processing is required, and amine-based absorption processes are widely used in gas processing. The current study aims to model amine-based absorption process and to find cost-effective design through systematic analysis of energy systems, together with column design. Different design options for absorber and stripper are investigated in a holistic manner, and heat integration technique has been applied to investigate how design of columns is interacted with energy efficiency for the pre-treatment process considered. Case study has been presented to demonstrate the applicability of heat integration method for improving energy efficiency in practice.

  • PDF

Study of Process for Offshore LNG Production (해상에서의 LNG 생산을 위한 공정 고찰)

  • Kim, Seung-Hyuk;Ha, Mun-Keun;Kim, Byung-Woo;Sadasivam, M.;Koo, Keun-Hoe
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.119-123
    • /
    • 2002
  • Liquefied Natural Gas(LNG) continues to attract modern gas industries as well as domestic markets as their main energy source in the recent years. This is mainly because LNG is inherently cleaner and more energy efficiency than other fuels. Offshore LNG production plant is of interest to many oil producing companies all over the world. This article discuss about the production process encountered while developing such a production facility. Typical offshore oil and gas processing required for oil stabilization and other optional units that can be added to the facilities. The production process can broadly be divided into five major units namely, (i) Oil Stabilization unit, (ii) Gas Treatment unit, (iii) Methane Recovery unit, (iv) Distillation unit and (v) LNG Liquefaction unit. The process simulation was carried out for each unit with a given wellhead composition. The topside facilities of offshore LNG production plant will be very similar to the process adopted in offshore processing platform along with the typical onshore LNG production plant. However, the process design problems associated with FPSO motion to be taken care of while developing floating LNG production plant.

  • PDF

Research of Combined Containment System for Floating LNG (플로팅 엘엔지 복합 화물창 시스템 연구)

  • Kim, Soo-Young;Kim, Sung-Chul;Lee, Dong-Hyun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.39 no.3
    • /
    • pp.342-347
    • /
    • 2015
  • Floating LNG is a new concept which is used as LNG regasification/receiving facility and for LNG production/export facility. LNG Floating Production Storage and Offloading(FPSO) concept will put vitality into marginal gas fields which were delayed because of excessive investment cost in the world. LNG Floating Storage Regasification Unit(FSRU) also provides commercially competitive and effective solutions to the areas where onshore infrastructure is not well established. LNG cargo containment system is one of the key functions for FLNG to store produced LNG on a floating structure. This paper presents a new technology related to a LNG containment system; a combined cargo containment system utilizing the advantages of iIndependent tank type and membrane system. Technical advantages have been validated through research work.

부유식 천연액화가스(LNG) 터미널의 설계 기술 개발

  • Han Yong-Seop;Lee Jeong-Han;Kim Yong-Su
    • THE INDUSTRY AND TECHNOLOGY OF GAS
    • /
    • v.5 no.1 s.6
    • /
    • pp.39-47
    • /
    • 2002
  • With the expansion of natural gas demands in many countries, the necessity of LNG receiving terminals has been increased. The offshore LNG Floating Storage and Regasification Unit (FSRU) attracts attentions not only for a land based LNG receiving terminal alternative, but also for a feasible and economic solution. Nowadays, as the reliability of offshore oil and gas floating facilities and LNG carriers gains with proven worldwide operations, the FSRU can achieve a safety level that can be comparable to an onshore terminal. The design development related with safety features of the FSRU has been extensively carried out by oil and gas companies, shipyards, engineering companies, and equipment vendors, and has been successful so far in many fields. The construction of the FSRU can be achieved by integrating various technologies and experiences from many disciplines and many participating companies and vendors. In this paper, reviews on some of the important design features and design improvements on FSRU together with the practical construction aspects in cargo containment, vaporization system, ESD system, and operation modes, have been covered in comparison with actual LNG carrier, onshore receiving terminal, and FPSO systems. In order to materialize an FSRU project, the technical and economic justification has to be preceded. It is believed that once the safety and technical soundness is convinced, the FSRU can bring a higher project feasibility by reducing the overall construction time and cost. Through this study, an FSRU design readily applicable to an actual project has been developed by incorporating experiences gained from many marine and offshore projects. The wide use of proven standard technologies adopted in the series construction of LNG carriers and offshore FPSOs will bring the project efficiency and reliability.

  • PDF

Offshore Process FEED(Front End Engineering Design) Method for Integrated Process Engineering (통합 프로세스 엔지니어링을 위한 해양 프로세스 기본 설계 방법론)

  • Hwang, Ji-Hyun;Roh, Myung-Il;Cha, Ju-Hwan;Lee, Kyu-Yeul
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.47 no.2
    • /
    • pp.265-277
    • /
    • 2010
  • In this study, an offshore process FEED(Front End Engineering Design) method is systematically established to perform integrated process engineering for topsides systems of LNG FPSO(Floating, Production, Storage, and Off-loading unit) based on the concepts and procedures for the process FEED of general offshore production plants. First, various activities of the general process FEED engineering are summarized, and then the offshore process FEED method, which is suitable for application to all types of offshore oil and gas production plants, is proposed. Second, an integrated process engineering environment is built based on the proposed FEED method. Finally, the integrated process engineering environment is applied to topsides systems of an LNG FPSO in order to verify the validity and applicability of the proposed FEED method. As a result, it is shown that the proposed FEED method can be applied to the process FEED engineering of FPSOs and moreover will be able to contribute to perform successful offshore projects in the future.

Experimental Study on Interaction of Side-by-Side Moored Vessels (병렬계류 선박의 동유체력 상호간섭에 관한 실험연구)

  • Kim, Jin-Ha;Hong, Sa-Young;Cho, Seok-Gyo;Choi, Yoon-Rak;Song, Myong-Jae;Kim, Duk-Su
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.208-213
    • /
    • 2003
  • Recently, Side-by-side mooring system of LNG FPSO and shuttle tanker is one of hot issues in offshore floating body dynamics, which requires accurate analysis of hydrodynamic interactions between side by side moored LNG FPSO and shuttle tanker than tandem moored vessels. This paper aims to investigate basic interaction characteristics of side-by-side moored multiple vessels both numerically and experimentally. A higher-order boundary element method combined with generalized nwde approach will be applied to analysis of motion and drift force of side by side moored multiple-body. Model tests were carried out for the same multiple floating bodies in regular and irregular waves. Motion responses and drift forces of vessels for two mooring situation(coupled & uncoupled) were compared with those of calculations. Discussions will be highlighted on applicability of numerical method to prediction of sophisticated multi-body interaction problem of which motion behavior is very important to analysis of mooring dynamics of deep sea floating bodies.

  • PDF

선박 및 해양구조물의 개발 현황

  • Kim, Hyeon-Su
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.47 no.3
    • /
    • pp.3-7
    • /
    • 2010
  • 국내 조선소와 학교, 연구소에서 1990년대 중반 이전의 빙해선박에 대한 연구는 거의 이루어지지 않았다고 해도 과언이 아니다. 하지만 2000년대 초반부터 러시아가 St. Petersburg항을 통해 본격적으로 원유를 수출하기 시작하면서 내빙선 시장이 호황을 맞이하게 되었고 빙해선박 특히 내빙선박에 대한 관심이 집중되었다. 당시에 한국의 조선소들은 FMA rule 상의 엔진 출력이 과도한 것을 인지하고, 적정한 엔진 사양을 파악하기 위한 공격적인 연구개발로 ICE Class 1A, 1B, 1C의 선박을 상당히 많이 수주하여 선주에게 인도하였다. 또한 Ice belt의 구조적인 보강을 하기위한 설계와 연구가 활발히 진행되었다. 내빙선에 이어 쇄빙선의 연구에 관심을 집중시킨 선박은 최근 실해역에서 활동 중인 연구 조사선 "아라온"호 이다. 아라온호는 설계와 건조가 국내 조선소에서 이루어졌으며, 학계와 조선소 및 연구소에 쇄빙선에 대한 관심을 불러 일으켰다. 이와 비슷한 시기에 삼성 중공업에서 세계 최대 쇄빙선인 70K shuttle tanker를 수주 및 인도하면서 대형 쇄빙선 시장이 개척되어 국내외 조선소의 큰 관심을 불러일으키고 있다. 쇄빙 기술이 응용된 선박으로 Drill ship과 LNG FPSO등이 수주되어 현재 설계를 진행 중이다. 가장 최근에 현대중공업에서 수주한 원통형 FPSO의 경우 북해 지역에 투입을 목적으로 언론에 발표된 것과는 달리 발주처와 유럽의 관련 연구기관에서는 러시아 유전지역 투입을 염두에 두고 쇄빙관련 연구를 진행한 것으로 파악되고 있다. 본 기고에서는 이러한 빙해선박의 개발 및 건조 사례 현황을 기술하고, 향후 수주가능성이 있는 쇄빙선 분야와 조선소의 대응 전략 등에 대해서 정리해 보고자 한다.

  • PDF

Vibration Reduction of Vertical Pumps Used in the Power Plant Circulating Water System (발전소 순환수계통 수직펌프의 진동저감에 관한 연구)

  • Park, Hyeok;Yoo, Ho-Seon
    • Plant Journal
    • /
    • v.9 no.1
    • /
    • pp.43-49
    • /
    • 2013
  • In this study, the natural frequency of the actual operating vertical pump in the P combined cycle power plant is measured and the cause of high vibration is determined by using fluid-structure coupled vibration theory. Choosing the vibration reduction plan suited for field conditions and using the numerical analysis verify effectiveness of the plan. The plan is applied to the actual pump and the empirical experiments are conducted.

  • PDF

Control of surface defects on plasma-MIG hybrid welds in cryogenic aluminum alloys

  • Lee, Hee-Keun;Chun, Kwang-San;Park, Sang-Hyeon;Kang, Chung-Yun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.7 no.4
    • /
    • pp.770-783
    • /
    • 2015
  • Lately, high production rate welding processes for Al alloys, which are used as LNG FPSO cargo containment system material, have been developed to overcome the limit of installation and high rework rates. In particular, plasma-metal inert gas (MIG) hybrid (PMH) welding can be used to obtain a higher deposition rate and lower porosity, while facilitating a cleaning effect by preheating and post heating the wire and the base metal. However, an asymmetric undercut and a black-colored deposit are created on the surface of PMH weld in Al alloys. For controlling the surface defect formation, the wire feeding speed and nozzle diameter in the PMH weld was investigated through arc phenomena with high-speed imaging and metallurgical analysis.