• Title/Summary/Keyword: LCC(Life-Cycle Cost)

Search Result 319, Processing Time 0.023 seconds

Performance and Economic Analysis for Rut-resistance Pavement Considering Life Cycle Cost (LCC를 고려한 내유동포장의 공용성 및 경제성 분석에 관한 연구)

  • Do, Myungsik;Han, Daeseok;Yoo, Inkyoon;Lee, Soohyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.783-796
    • /
    • 2006
  • Rut-resistance pavement is adopted to prevent pavement from plastic deformation since 1998. The objective of this paper is to investigate performance and economic efficiency between rut-resistance pavement and conventional hot-mix asphalt(HMA) on national highway. The pavement deterioration models incorporated in HDM-4 have been calibrated and adapted to local road conditions based on observed pavement rut-depth data. Based on calibration result of HDM-4, the economic evaluation including road agency cost and user cost is performed for 34 road pavement sections. Furthermore, we presented optimal timing for maintenance and performance levels subject to different budget. We found that rut-resistance pavement is performing better than conventional hot-mix asphalt in most road sections. Furthermore, we confirmed that the application of HDM-4 is useful for pavement project planning and evaluation. More investigation is needed to enlarge the scope of the pavement data and to explore more deeply socio-environmental cost and delay cost.

Considering Performance Measurement and Life-Cycle Costs for Andong Culture & Art Center BTL Project (VE기법을 적용한 안동문화예술회관 민간투자사업의 성능개선 사례연구)

  • Kim, Seong-Il;Lee, Kwang-Mo;Choi, Seok-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1005-1010
    • /
    • 2007
  • According to revision of Construction Technology Management Act (2005), the government ordering construction which cost is more than 10billion won should investigate the value engineering(VE) of a construction. In this sense, the government actively promote plans in 2008 after identifying the examining standards of the investigation on the VE(2007). It is substantial issue to introduce Pre-Qualification(PQ) in oder to restrain unlicensed VE consulting companies or VE consultants. This system will contribute to the quality and the settlement of the value engineering in our country. The reason why the Korea VE Society founded in 2006 is one of the afore-mentioned reasons. Therefore, we try to establish the value engineering of Build-Transfer-Lease Scheme by providing the practical application of construction value engineering and definite procedures through the example of Andong Culture and Art Center's research in one of the various construction fields.

  • PDF

A Risk Quantification of Public Sector Comparator in the Financial Analysis of the BTL (Build-Transfer-Lease) Scheme of Railway Projects: a Case Study of the Haman-Jinju Link (철도 BTL 민자적격성조사의 위험계량화방안 연구)

  • Jang, Su-Eun;Gang, Ji-Hye
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.5 s.91
    • /
    • pp.67-74
    • /
    • 2006
  • This paper proposes a way to a risk quantification of public sector comparator in the value-for-money test of the BTL (Build-Transfer-Lease) scheme in rail investment projects. Two principal risks that are project delay and budget increasing costs are identified and are empirically quantified with a case study of the Haman-Jinju link. The methodology suggested is expected to be a good reference for the similar research afterwards and also to help in settling down the scheme that is only an early stage.

A Process of Optimization for the Best Orientation of Building Façades Based on the Genetic Algorithm by Utilizing Digital Topographic Map Data (수치지형도 데이터를 활용한 유전자 알고리즘 기반 건축외피의 최적향 산정 프로세스)

  • Choe, Seung-Ju;Han, Seung-Hoon
    • Land and Housing Review
    • /
    • v.13 no.1
    • /
    • pp.113-129
    • /
    • 2022
  • A building's eco-friendliness is directly related to various values including the life cycle cost of a building. However, the conventional architectural design method has a limitation in that it cannot create an optimized case according to the surrounding environmental conditions. Therefore, the purpose of this research is to present a design assistance tool that can review planning cases optimized for the environmental conditions of the building site in the planning stage of architectural production. To achieve the purpose of the study, an algorithm for realizing 3D modeling of the region and analysis of the solar environment was produced based on the site contours, building, and road information from the digital topographic map provided by the National Geographic Information Institute. To examine the validity of the developed algorithm, a comparative experiment was conducted targeting the elevation direction of the existing building. As a result, it was found that the optimal elevation direction selected by the algorithm can receive higher insolation compared to the front facade of the main building.

A Basic Study on the Determination Method of Reconstruction and Remodeling of Deteriorated School Facilities - Focusing on the Case of S High School in Incheon Metropolitan City - (노후 학교시설의 개축 및 리모델링 타당성 판별 방법에 대한 기초연구 -인천광역시 S 고등학교 사례를 중심으로-)

  • Meang, Joon-Ho;Kim, Sung-Joong;Song, Byung-Joon;Kim, Jae-Young
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.21 no.2
    • /
    • pp.1-10
    • /
    • 2022
  • This study aims to prepare an objective project basis by reviewing the feasibility of reconstructing and remodeling Greensmart Future School project for S High School's main building, which was built more than 40 years ago, in Incheon Metropolitan City, and to apply and review an effective methodology for determining renovation and remodeling. To this end, the feasibility of reconstruction and remodeling was evaluated in the long term by synthesizing the results of quantitative evaluation through economic review and qualitative evaluation through educational functional review. As a result of the study, it was found that the reconstruction plan was advantageous throughout all alternatives in terms of economic costs, and the field survey indicated limitations in spatial functions to support students' various educational activities and applying new directions, especially the 2022 revised curriculum and high school credit system.

Evaluation of Performance and Construction the New National Test Road Sites of Modified Asphalt (신설국도의 시험시공을 통한 표층용 개질 아스팔트 공용성 평가)

  • Cho, Gyu-Tae
    • International Journal of Highway Engineering
    • /
    • v.4 no.3 s.13
    • /
    • pp.43-49
    • /
    • 2002
  • Asphalt pavements have to perform under the conditions of heavily-loaded vehicles due to the industrialization and large temperature variance between the summer and the winter. Due to these factors, a characteristics change of early permanent deformation becomes a big issue, and to remedy this problem many research to use modified asphalt are being widely conducted. However, most of the modified asphalt is being paved after milling the surface course and applying tackcoating, and it is being used mostly for the repair and maintenance purpose rather than pavement of new national road. The purpose of this investigation is to obtain some fundamental data for the evaluation of the performance and long-term performance of the construction material mixtures by the laboratory test and field experiments. For the field experiment, 200m of two-lanes national road, that is being paved for the new national road under the direction of Pusan Regional Construction Management Office, was paved with SBS PMA and PSMA asphalt mixtures, which are an modified asphalt mixtures used for the surface course, on top of the base course paved with other modified asphalt mixtures. The remaining section of the new national road was paved with dense grade mixture. The laboratory tests assessed and analyzed the mixture characteristics by Marshall's stability test, strength tests and wheel-tracking test. On the basis of the evaluation result of the temperature control and roughness of the newly constructed road at the field experiment site, it is desired to evaluate and identify the most economic modified asphalt mixtures by long-term performance evaluation and LCC(Life Cycle Cost) analysis in order to apply the test result to the design of new road construction in the future.

  • PDF

Mid-term Requirement of 'Elements of Depot Maintenance' draft (창정비요소 개발 과정정립을 통한 창정비요소개발 발전을 위한 제언)

  • Ahn, Jung-Jun;Kim, Jong-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.638-647
    • /
    • 2018
  • We have to prepare for the existing threats from North Korea and potential threats in the future. It is important to utilize our resources as effectively as possible to build military power that brings victory in a war. Based on a sustainable required operational capability, weapons systems at the acquisition stage need to maintain a combat-readiness posture and ensure operational sustainability. To achieve this, establishment of procedures that develop elements of depot maintenance at the beginning, which enables economical and effective depot maintenance during that stage, is essential. First, the requirement paper needs to develop the concept of the depot maintenance requirement through the pre-study outlined by this paper. Second, at the system development stage, a Development Plan of Depot Maintenance draft should be proposed. This is the initial paper that can develop the elements of depot maintenance, and it should be verified by a field test. Third, each force's logistics command should write a Depot Maintenance Direction draft and a Mid-term Requirement of Elements of Depot Maintenance draft with the proven Development Plan of Depot Maintenance draft. Also, the verified paper needs to be realized and renewed by the time the Requirement of Elements of Depot Maintenance draft is completed. In conclusion, the procedures explained above will contribute to build an economical and effective military power in a reality faced with a resource shortage and threats from the enemy.

A Case Study on Economic Analysis of a Solar Water Heating System and a Ground Source Heat Pump System Applied to a Military Building (군 복지시설의 지열시스템과 태양열시스템 경제성 평가 사례 연구)

  • Lee, Jong-Chan;Park, Young-Ho;Lee, Ghang;Lee, Sang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.111-118
    • /
    • 2009
  • This study is to analyze the performance of SWH(Solar Water Heating) and GSHP(Ground Source Heat Pump) systems by evaluating their energy efficiency and LCC(Life Cycle Cost) as being applied to the OO hall as a selected building in the Army. The OO hall, used as bathrooms, dining rooms, accommodations and offices, has reinforced concrete structure system with three floors above the ground and one underground, and its total floor area is approximately 2,917$m^2$. Two energy simulations are conducted to predict the yearly cooling and heating energy of the selected building: One is for analysis of an air-conditioning energy consumption using the e-Quest program, and another is for two new-renewable energy facilities as a water heating source using the RETScreen. The installed capacity of two new-renewable energy facilities is determined according to the 5% level of total standard construction cost. As a briefly result, SWH system is more energy-effective than GSHP system. Considering the break-even point, it is expected that SWH can take only 3 years 11 months to pay for itself in savings while the investment of GSHP can be recovered in more than 16 years 6 months.

Estimation and Adjustment Model Considering Time Value of Money for Long-Term Maintenance Cost of Apartment House (시간적 가치를 고려한 공동주택 장기수선충당금 산정 및 조정 모델)

  • Koo, Seonkeun;Kim, Jonghyeob;Jun, Inyeong;Kim, Yeongjin;Yoon, Yousang;Hyun, Changtaek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.12-21
    • /
    • 2017
  • From 1960, the government decided to build apartment houses on a large scale in order to resolve the rising housing problems. However, the maintenance issues that have arisen from the deterioration of housing has not received adequate attention. The policy focuses only on the supply of housing. By passing new laws, the durable period during which buildings allowed reconstruction was increased, and long term maintenance plans were treated as important issues. The government was then obligated to establish certain long term maintenance plans and costs by legislating a Housing Act and requiring it be adjusted every three years. However, when planning long-term repair costs, doing so without considering the time value of money would become a problem. In addition, if differences between the planned repair costs and actual costs occur, it becomes necessary to adjust the long-term repair costs but, as of yet, the criteria to adjust such things does not exist. For these reasons, if there is lack of money to execute large-scale repair work, a building is unlikely to respond to deterioration of housing; on the other hand, an unnecessary reserve or pool of money can lead to conflict among residents. Therefore, this paper will propose estimation and adjustment models considering the time value of money for long term maintenance costs of apartment houses.