• Title/Summary/Keyword: LCC(Life cycle cost,)

Search Result 318, Processing Time 0.028 seconds

A Study on the Optimization of New Renewable Energy Systems in Public-Purpose Facilities (공공용 업무시설의 신재생에너지시스템 최적화 연구)

  • Lee, Yong-Ho;Seo, Sang-Hyun;Cho, Young-Hum;Hwang, Jung-Ha
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.5
    • /
    • pp.95-104
    • /
    • 2013
  • This study set out to devise an optimized system to take into account life cycle cost(LCC) and ton of carbon dioxide($TCO_2$) by applying the weighted coefficient method(WCM) to "public-purpose" facility buildings according to the mandatory 5% and 11% of new renewable energy in total construction costs and anticipated energy consumption, respectively, based on the changes of the public obligation system. (1) System installation capacity is applied within the same new renewable energy facility investment according to the mandatory 5% of new renewable energy in total construction costs. Both LCC and $TCO_2$ recorded in the descending order of geothermal, solar, and photovoltaic energy. The geothermal energy systems tended to exhibit an excellent performance with the increasing installation capacity percentage. (2) Optimal systems include the geothermal energy(100%) system in the category of single systems, the solar energy(12%)+geothermal energy(88%) system in the category of 2-combined systems, and the photovoltaic energy(12%)+solar energy(12%)+geothermal energy(76%) system and the photovoltaic energy(12%)+solar energy(25%)+geothermal energy(63%) system in the category of 3-combined systems. (3) LCC was the highest in the descending order of photovoltaic, geothermal and solar energy due to the influences of each energy source's correction coefficient according to the mandatory 11% of new renewable energy in anticipated energy consumption. The greater installation capacity percentage photovoltaic energy had, the more excellent tendency was observed. $TCO_2$ recorded in the descending order of geothermal, photovoltaic and solar energy with the decreasing installation capacity of photovoltaic energy. The greater installation capacity percentage a geothermal energy system had, the more excellent tendency it demonstrated. (4) Optimal systems include the geothermal energy(100%) system in the category of single systems, the photovoltaic energy(62%)+geothermal energy(38%) system in the category of 2-combined systems, and the photovoltaic energy(50%)+solar energy(12%)+geothermal energy(38%) system and the photovoltaic energy(12%)+solar energy(12%)+geothermal energy(76%) system in the category of 3-combined systems.

A Survey on the Persons in Charge for Economic Estimation Analysis and Improvement of BTL Projects (BTL사업의 경제성 평가 현황조사 및 개선을 위한 실무자 설문조사연구)

  • Lee, Chun-Kyong;Cho, Bong-Ho;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.73-80
    • /
    • 2007
  • As BTL(Build-Transfer-Lease) private investment business benchmarking PHI(Private Finance Initiative) of USA and Japan is introduces to Korea since 2005, as a part of supplying high leveled public service and early expanding required facilities for SOC, Value for Money on private investment business from treasury investment business at the beginning gets to be needed. Accordingly, this survey has been conducted in order to analyse BTL projects status, propriety of economic analysis method(VFM analysis, calculation of estimated business expenses, valuation of bidding price, etc.) by business advance phases from the viewpoint of person in charge, necessity of improvement and alternative plants. As the result of conducting cross tabulation analysis and correlation analysis by occupational group, BTL project advance phases and alternative plans for improvement, it is necessary ye prepare standardized service level against business expense and basis for calculating and evaluation operation expenses. Based on the necessity of quantitative analysis (LCC analysis) of VFM, standard for calculating management, maintenance and administration expenses is required. In addition, reliable economic valuation system considering domestic BTL environment should be setup, for business efficiency.

A Study on Integrated Logistic Support (통합병참지원에 관한 연구)

  • 나명환;김종걸;이낙영;권영일;홍연웅;전영록
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2001.06a
    • /
    • pp.277-278
    • /
    • 2001
  • The successful operation of a product In service depends upon the effective provision of logistic support in order to achieve and maintain the required levels of performance and customer satisfaction. Logistic support encompasses the activities and facilities required to maintain a product (hardware and software) in service. Logistic support covers maintenance, manpower and personnel, training, spares, technical documentation and packaging handling, storage and transportation and support facilities.The cost of logistic support is often a major contributor to the Life Cycle Cost (LCC) of a product and increasingly customers are making purchase decisions based on lifecycle cost rather than initial purchase price alone. Logistic support considerations can therefore have a major impact on product sales by ensuring that the product can be easily maintained at a reasonable cost and that all the necessary facilities have been provided to fully support the product in the field so that it meets the required availability. Quantification of support costs allows the manufacturer to estimate the support cost elements and evaluate possible warranty costs. This reduces risk and allows support costs to be set at competitive rates.Integrated Logistic Support (ILS) is a management method by which all the logistic support services required by a customer can be brought together in a structured way and In harmony with a product. In essence the application of ILS:- causes logistic support considerations to be integrated into product design;- develops logistic support arrangements that are consistently related to the design and to each other;- provides the necessary logistic support at the beginning and during customer use at optimum cost.The method by which ILS achieves much of the above is through the application of Logistic Support Analysis (LSA). This is a series of support analysis tasks that are performed throughout the design process in order to ensure that the product can be supported efficiently In accordance with the requirements of the customer.The successful application of ILS will result in a number of customer and supplier benefits. These should include some or all of the following:- greater product uptime;- fewer product modifications due to supportability deficiencies and hence less supplier rework;- better adherence to production schedules in process plants through reduced maintenance, better support;- lower supplier product costs;- Bower customer support costs;- better visibility of support costs;- reduced product LCC;- a better and more saleable product;- Improved safety;- increased overall customer satisfaction;- increased product purchases;- potential for purchase or upgrade of the product sooner through customer savings on support of current product.ILS should be an integral part of the total management process with an on-going improvement activity using monitoring of achieved performance to tailor existing support and influence future design activities. For many years, ILS was predominantly applied to military procurement, primarily using standards generated by the US Government Department of Defense (DoD). The military standards refer to specialized government infrastructures and are too complex for commercial application. The methods and benefits of ILS, however, have potential for much wider application in commercial and civilian use. The concept of ILS is simple and depends on a structured procedure that assures that logistic aspects are fully considered throughout the design and development phases of a product, in close cooperation with the designers. The ability to effectively support the product is given equal weight to performance and is fully considered in relation to its cost.The application of ILS provides improvements in availability, maintenance support and longterm 3ogistic cost savings. Logistic costs are significant through the life of a system and can often amount to many times the initial purchase cost of the system.This study provides guidance on the minimum activities necessary to Implement effective ILS for a wide range of commercial suppliers. The guide supplements IEC60106-4, Guide on maintainability of equipment Part 4: Section Eight maintenance and maintenance support planning, which emphasizes the maintenance aspects of the support requirements and refers to other existing standards where appropriate. The use of Reliability and Maintainability studies is also mentioned in this study, as R&M is an important interface area to ILS.

  • PDF

A Study on Development of the Reliability Evaluation System for VVVF Urban Transit (VVVF 도시철도 차량의 신뢰성 평가 시스템 개발에 관한 연구)

  • Bae Chul-Ho;Kim Sung-Bin;Lee Ho-Yong;Chang Suk-Hwa;Suh Myung-Won
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.13 no.5
    • /
    • pp.7-18
    • /
    • 2005
  • Over the past twenty years, the maintenance system has been developed and its importance has been increased. For the effective maintenance of the urban transit, we have developed the maintenance system based on the concept of RCM(Reliability Centered Maintenance). RCM analysis is a systematic approach to developing a cost-effective maintenance strategy based on the various components's reliability of the system in question. It is performed according to process that includes the following steps; definition of function and functional failures of the systems, construction of RB D(Reliability Block Diagram), performance of FMEA(Failure Modes & Effects Analysis) and calculation of the reliability index. The final process of RCM is to determine appropriate failure maintenance strategies. This paper aims to define the procedure of maintenace based on the concept of RCM for urban transit. The key for a successful maintenance system is an automated scheduling to the maximum extent possible and timely executions. The developed system issues maintenance plan and repair request based on analyzed data and maintenance experience.

Improvement of Construction Management for Building Remodeling Projects (건축물 리모델링 프로젝트 사례적용에 의한 시공관리 개선방안)

  • Yeo Un-Yong;Yoon You-Sang;Suh Sang-Wook;Lim Byung-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.122-129
    • /
    • 2004
  • The purpose of this study is to propose a way that improves the construction management for remodeling of building. The study attempts to deal with the case study for application and suggests some positive and negative lessons. The main contents and results of the study are as follows. (1) Through the repetitive joint meetings among the various participants, decision making for the remodeling process can be speeded up. (2) Clear work order and communication for work scope can be accomplished by using perspective drawing in design phase. (3) Reliable construction planning and scheduling for remodeling of building can be proposed through case study. (4) By a sound survey, conflict elements can be resolved in advance. Also reasonable procurement plan of equipments and multi-skilled labor can be important factors to keep a construction schedule in time. (5) Through the comparison a case project with other sites having a similar work scope, improvement effect in a time and cost aspect was analyzed quantitatively. The study also recommends that, as a future research, the remodeling process model be developed for more general applications in remodeling of building.

Verification Experiment and Analysis for 6kW Solar Water Heating System (Part 4 : Comparing Economics and Raising Competitiveness) (6kW급 태양열 온수급탕 시스템의 실증실험 및 분석 (제4보 경제성비교 및 경쟁력강화))

  • Lee Bong Jin;Kang Chaedong;Lee Sang Ryoul;Hong Hiki
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.17 no.3
    • /
    • pp.232-242
    • /
    • 2005
  • It has been recognized that solar water heating systems are economically inferior to conventional gas water-heaters and boilers using light oil as fuel in spite of having practical possibilities among other alternative energy facilities in Korea. The solar system, however, should be revaluated due to the sharp rise of oil prices recently. We have calculated the energy amount and cost through a series of research projects for the system by experiment and simulation, which lead to analyzing reliable life cycle costs. For the economic analysis, the gas water-heater and light oil boiler were taken as base cases while the solar systems implemented with these facilities were compared as alternatives. As a result, the solar system using the light oil as an auxiliary fuel surpassed the light oil boiler in economics. And a $50\%$ government subsidy for the initial cost is needed to maintain competitiveness with the gas hot-water heater. With this support, the simple payback period of the system can approach 12.8 years under $20\%$ additional curtailment of expenditure.

Infrastructure Asset Management Policy and Strategy Development (사회기반시설물 유지관리를 위한 자산관리체계 도입 전략)

  • Chin, Kyung-Ho;Chae, Myung-Jin;Lee, Giu;Lee, Kyo-Sun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.67-77
    • /
    • 2009
  • Infrastructure asset management can be defined as the long term and cost effective management strategy to meet the required service level. In most developed countries, the major motivations of the introduction of asset management are increment in number of assets, extension of maintenance field, accounting approaches of public facilities, performance-based FM(Facility Management), limitations of public funds and public-private partnership, life cycle cost approach, and the development of information technology. This paper discusses the strategic and stepwise methods of introducing infrastructure asset management. Strategic approaches are suggested to develop the practical methods of condition and value assessment of assets, and long-term capital investment plan for optimized decision making(ODM). Required systematic processes are analyzed in terms of resource and technical limitations and detailed implementation plan for each development phases are suggested.

A Study on the Necessity of Verification about depot level maintenance plan through the Weapons System cases analysis (무기체계 사례 분석을 통한 창정비개발계획안 검증 필요성 연구)

  • Ahn, Jung-Jun;Kim, Su-Dong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.76-82
    • /
    • 2019
  • This study has done to search for a solution to remove risk limitedly caused by separating weapon system acquisition from operation and maintenance at the view point of Logistic Commander who's responsible for stable operation and maintenance after acquiring weapon system. At the System development stage, unverified overhaul development plan may cause additional manpower and costs after the development, and furthermore it is likely to have risk to lower reliability of the military. Thus, research and development agency should write overhaul development plan at the System development stage, and it should be verified through evaluation and verification test. Secondly, during research and development, institutional supplementation is needed to calculate human and material resources writing overhaul development plan. Thirdly, it should be able to analyze proper operation & maintenance plan and cost for overhaul plan at the pre-investigation stage. Fourthly, the base which can develop overhaul concept and overhaul factors should be included in the need and need determination document. Lastly, for the weapon system which has small amount of high power figure, project management should be performed to be able to specify at the each acquisition level of weapon system to realize Article 28, clause 3 and 4 of Defense business law.

Development of Evaluation Factors for Breakwater Rehabilitation (방파제 성능개선을 위한 평가항목 개발)

  • Park, Su-Yeul;Yun, Won-Gun;Kang, Go-Une;Kim, Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.4
    • /
    • pp.67-74
    • /
    • 2021
  • Domestically, technical condition evaluation for breakwaters has been conducted through safety checks and safety diagnosis. If necessary, maintenance for the facility is conducted. However, in recent years, the need for infrastructure management has been increasing from a life-cycle-cost perspective. For these reasons, the "Sustainable Infrastructure Management Basic Act" was enacted. Previously, only the technical part of the breakwaters was evaluated. However, based on the act, comprehensive management of breakwaters will be possible through performance improvement by adding economic and political evaluations. In this study, evaluation factors and evaluation methods were developed for a breakwater rehabilitation project. The purpose of this study is to present a development direction, items, and methods for the evaluation of breakwater performance improvement to be applied in future practice. This study reviews the concept of maintenance and performance improvement, the literature related to performance improvement, and the project type for the common standard of performance improvement. Evaluation items and evaluation methods for breakwater rehabilitation are suggested to be reviewed by experts. The methodology suggested in this study could be used for preventive maintenance and to reduce accidents.

Performance and Economic Analysis for Rut-resistance Pavement Considering Life Cycle Cost (LCC를 고려한 내유동포장의 공용성 및 경제성 분석에 관한 연구)

  • Do, Myungsik;Han, Daeseok;Yoo, Inkyoon;Lee, Soohyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.783-796
    • /
    • 2006
  • Rut-resistance pavement is adopted to prevent pavement from plastic deformation since 1998. The objective of this paper is to investigate performance and economic efficiency between rut-resistance pavement and conventional hot-mix asphalt(HMA) on national highway. The pavement deterioration models incorporated in HDM-4 have been calibrated and adapted to local road conditions based on observed pavement rut-depth data. Based on calibration result of HDM-4, the economic evaluation including road agency cost and user cost is performed for 34 road pavement sections. Furthermore, we presented optimal timing for maintenance and performance levels subject to different budget. We found that rut-resistance pavement is performing better than conventional hot-mix asphalt in most road sections. Furthermore, we confirmed that the application of HDM-4 is useful for pavement project planning and evaluation. More investigation is needed to enlarge the scope of the pavement data and to explore more deeply socio-environmental cost and delay cost.