• Title/Summary/Keyword: LCC(Life cycle cost,)

Search Result 318, Processing Time 0.025 seconds

Application of High Performance Coatings for Service Life Extension of Steel Bridge Coatings

  • Lee, Chan-Young
    • Corrosion Science and Technology
    • /
    • v.20 no.4
    • /
    • pp.169-174
    • /
    • 2021
  • In this study, performance tests, a field evaluation, and a life cycle cost (LCC) analysis for high performance coating systems were conducted to prepare a plan to reduce the cost of maintenance coating and contribute to the service life extension of steel bridges by applying high performance coatings to steel bridges that will be constructed in the future. From the deterioration models based on the field evaluation for chlorinated rubber and urethane topcoat systems, which have been applied often, the mean service lives were derived as 20.8 and 26.6 years, respectively. For the other coating systems that have not been applied in practice, the coordination factors were differentially applied with evaluation items. The most durable coating system was predicted to be thermal spray coating (TSC) primer/epoxy intermediate coat/fluoride resin topcoat, with a predicted value as long as 42.2 years. The LCC analysis indicates that partial application of high performance coating, such as TSC and fluoride resin, to specific parts vulnerable to corrosion and ultraviolet ray (UV) is more advantageous than the use of general coating systems.

Optimal Life-Cycle Cost Design of Steel Box Girders (강박스 거더의 생애주기비용 최적설계)

  • Shin Yung-Seok;Park Jang-Ho;Lee Hyun-Sub;Ahn Ye-Jun
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.18 no.4 s.70
    • /
    • pp.445-452
    • /
    • 2005
  • This paper presents a design method to minimize Life Cycle Cost (LCC) of steel box girders. The LCC considered in this paper includes initial cost, expected life-cycle maintenance cost and repair cost. A load carrying capacity curve is derived from a condition grade curve of steel girders and load tarrying capacity that is measured in safety diagnostic test. And then, optimal design of steel box girders is performed on the basis of load carrying capacity curve. In this paper time and number of times for repair of steel girders are determined based on the calculated load carrying capacity curve. Also, annual costs considering real discount rate are compared and analyzed in various cases. It is concluded that the optimal design of steel box gilders considering LCC by the presented method will lead to more economical and safer girders than conventional design.

Life-Cycle Cost Optimization of Slab Bridges with Lightweight Concrete (경량 콘크리트를 이용한 슬래브교의 생애주기비용 최적설계)

  • 정지승;조효남;최연왕;민대홍;이종순
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2002.04a
    • /
    • pp.257-264
    • /
    • 2002
  • This study presents a life-cycle cost (LCC) effectiveness of a concrete with lightweight aggregate. A number of researchers have made their efforts to develop a lightweight concrete, since it is difficult to apply conventional concrete using general aggregate to heavy self-weight structures such as long span bridges. In this study, an optimum design for minimizing the life-cycle cost of concrete slab bridges is performed to evaluate the life cycle cost effectiveness of the lightweight concrete relative to conventional one from the standpoint of the value engineering. The data of physical properties for new concrete can be obtained from basic experimental researches. The material properties of conventional one are acquired by various reports. This study presents a LCC effectiveness of newly developed concrete, which is made by artificial lightweight aggregate. A number of researchers have made their efforts to develop a lightweight concrete, since it is difficult to apply conventional concrete using general aggregate to heavy self-weight structures such as long span bridges. From the results of the numerical investigation, it may be positively stated that the new concrete lead to, the longer span length, the more economical slab bridges compared with structures using general concrete.

  • PDF

The Development of Life Cycle Cost Evaluation Index for Public Facilities (공공시설물의 생애주기비용 평가기준 개발)

  • Kim, Tae-Hui;Gu, Bon-Hak;Kim, Ok-Gyu;Park, Tae-Keun;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.216-224
    • /
    • 2008
  • Recently, most developed countries use the evaluation system about Life Cycle Cost(LCC), and KOREA is beginning to introduce the system to reduce construction expenses. And the introduction of "Technical Proposal Type Bid", which is a new procurement method of Korea government, has made needs for the price-valuation way to evaluate facilities LCC. These days, LCC has been being evaluated by BTL and turnkey project in KOREA, which is suffering from difficulties in evaluating it, because evaluation elements and standards are vague. In addition, LCC evaluation in public construction business except BTL and turnkey is not carried out. Therefore, this paper is to develop a new evaluation index to evaluate LCC both systematically and objectively. The results of this paper are as followings. (1) Necessity and problem analysis of LCC evaluation index, (2) LCC evaluation index deduction from the technical report and question analysis, (3) Application and evaluation method suggestion to practice.

An Uncertainty Analysis of Calculating Life Cycle Maintenance and Energy Costs for Technical Proposals (기술제안입찰을 위한 유지관리 및 에너지 비용 산출방식의 불확실성 분석)

  • Chung, Sung Young;Kim, Sean Hay
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.3-9
    • /
    • 2018
  • Although Life Cycle Cost (LCC) must be evaluated by experts, sometimes it may not allow a sufficient time for even the experienced LCC expert to make rational decisions. Therefore, it often ends with relatively comparing the final numbers. We have broken down 110 technical proposals that are actually bade and accepted for large construction projects, and then have analyzed the uncertainty of Maintenance and Energy (M&E) cost during building life cycle, which turns out be the most volatile factor in uncertainty of LCC. Also we suggest "Value Engineering Index (VEI)" - the reduced M&E cost that is normalized by the reduced first cost. It is analyzed that the most uncertain factors of the M&E cost include repair and replacement term differing from each project, duplicated repair and replacement, non-standard repair items, and site-specific energy cost. Eventually we propose a VEI population with a mean of 1.38 and a standard deviation of 1.19, which is obtained by individually and exclusively applying the uncertain factors of the M&E cost to the 35 standard sample of technical proposals. The LCC evaluators may be able to use the VEI population as the benchmark to select the technical proposal with the most reasonable LCC among many others in two suggested manners; the one is to deterministically calculate the probability of single VEIs, and the other is to stochastically calculate the probability of the VEIs where uncertainty is quantified.

Optimizing the Life Cycle Cost of a Solar Water Heating System in an Office Building Through Simulation (사무소건물 태양열급탕시스템의 LCC 최적화 시뮬레이션)

  • Ko, Myeong-Jin;Choi, Doo-Sung;Chang, Jae-D.;Kim, Yong-Shik
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.22 no.12
    • /
    • pp.859-866
    • /
    • 2010
  • This study examined the economics of a solar water heating system for an office building using life cycle cost (LCC) optimization simulations. The numerical simulations were conducted with TRNSYS and GenOpt employing the Hooke-Jeeves algorithm. The solar collector area, slope, mass flow rate per collector area and storage tank volume were selected as the main design parameters of the solar water heating system. The LCC optimization simulations of the system were carried out for cases where water temperature was $60^{\circ}C$ and $50^{\circ}C$. The results showed that for water temperature at $60^{\circ}C$ and $50^{\circ}C$ the collector area could be decreased by 17% and 28%, storage tank volume could be decreased by 49% and 54%, and mass flow rate per collector area increased by 5% and 9% respectively compared to a non-optimized system. The LCC of the system was reduced by 4% for $60^{\circ}C$ and 7% for $50^{\circ}C$. The initial installation cost of the system was reduced by 24% for $60^{\circ}C$ and 34% for $50^{\circ}C$. However, the operating cost of the system increased by 16% for $60^{\circ}C$ and 36% for $50^{\circ}C$ compared to a traditional solar water heating system.

Problems and Solutions of LCC Analysis in BTL Project for Education Facilities (교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안)

  • Kim, Chung-Yung;Hong, Tae-Hoon;Hyun, Chang-Taek;Lee, Hyun-Jong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.182-192
    • /
    • 2008
  • The purpose of this research is to identify problems and solutions of domestic Life Cycle Cost analysis in BTL(Build-Transfer-Lease), a PFI(Private Finance Initiatives) project. It is expected BTL would be quite effective delivery method for public construction introducing the private's major capital investments and technologies, and obviously LCC analysis is becoming more important factor for success of BTL projects. Nevertheless, there are still some complicated issues in LCC analysis, a technique for selecting the optimal VE(Value Engineering) proposals and estimating OM&R (Operation, Maintenance, & Repair) cost of the buildings, and has been applied limitedly. This research mainly focuses on educational facility, as most frequently delivered by BTL currently, especially with two levels (Alternative LCC and Building LCC) , which is occupied main potion in BTL project. In addition, it identifies four main problems and suggests their solutions through case studies focusing six major factors (WBS, Repair Information, Life Cycle, Time value of money, Repair Information Database, LCC Model) from three projects. Advanced development of this research requires closer partnership between the private / public sectors, and their long term strategies.

A Study on Life Cycle Cost Analysis of Latex Modified Concrete Pavement for Bridges (LMC 교면 포장 공법의 생애주기비용분석에 관한 연구)

  • Cho, Hyo-Nam;Choi, Hyun-Ho;Jung, Pyoung-Ki;Lim, Jong-Kwon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.185-195
    • /
    • 2001
  • Latex Modified Concrete(LMC) has been widely used for the pavement of highway bridges over the past 35years around the world since it is more resistant to the intrusion of chloride ions, has higher tensile, compressive, and flexural strength, and has greater freeze-thaw resistance. However, in Korea, it has not been introduced to fields due to higher initial construction cost for its overlay compared with that of conventional pavement materials. Due to durable characteristics, it should be noted that the LMC may be more cost-effective than conventional pavements such as asphalt pavement, when life-cycle cost(LCC) concept is considered. The objective of this study is intended to suggest a practical LCC analysis model for pavement projects and to demonstrate relative cost-effectiveness of the LMC overlays in comparison with conventional pavement techniques. It may be stated that the procedure proposed in this study may be utilized for making optimal decision on cost-effective pavement design.

  • PDF

LCC Analysis of Steel Plate Bridge Deck Pavement Through Internalization of Improved Functions (기능 개선의 내재화를 통한 강상판 교면포장의 LCC 분석)

  • Baek, Jae Wook;Park, Tae Hyo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.5
    • /
    • pp.113-123
    • /
    • 2011
  • LCC analysis is a method that coordinates with function evaluation for value improvement, rather than a separate one for cost evaluation. Although its accuracy is rising, materials and structural types developed or applied relatively recently have yet to obtain a sufficient maintenance profile DB, inducing reliability to reduce from difficulties in estimating maintenance records. Based on the above mentioned background, this paper presents the LCC methodology of coordinating functional intensification matters with cost for analysis on alternatives with difficulties in setting maintenance profile. Recently, steel plate bridge deck pavements are faced with problems such as plastic deformation due to the increase in heavy vehicles and traffic, promoting the development of a new compound pavement. This paper execute LCC analysis by mentioning case studies of SMA, Guss and PSMA pavements to include performance scale compared between alternatives as relative evaluation coefficients into the maintenance profile.

Multi-Dimensional Analysis Method of Maintenance Cost of School Facility (학교시설물 유지관리비용의 다차원분석 방법)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.56-57
    • /
    • 2014
  • As school facilities have been expanding quantity better than quality, efficient school facility management has been focused on from 2001 in domestic. Due to obsolescence of school facility, objective management and maintenance cost of school facility is very important. However LCC(Life cycle cost) analyst, owner, engineer, contractor and facility manager have a difficulty to obtain and facilitate the basic analyzed data required to analyze LCC of school facility and establish maintenance plan. Therefore this research presents muti-dimensional analysis method through data warehouse technique for supplying maintenance cost information of school facility that can trace and accumulate the scattered LCCing data in the perspective of life cycle of school facility.

  • PDF