• Title/Summary/Keyword: Kori Nuclear Power Plant

Search Result 171, Processing Time 0.02 seconds

Estimation of Residual Stress Distribution for Pressurizer Nozzle of Kori Nuclear Power Plant Considering Safe End (고리 원전 가압기 노즐 용접부 잔류응력 예측 시 안전단 고려가 이종 금속 용접부 잔류응력 분포에 미치는 영향)

  • Song, Tae-Kwang;Bae, Hong-Yeol;Chun, Yun-Bae;Oh, Chang-Young;Kim, Yun-Jae;Lee, Kyoung-Soo;Park, Chi-Yong
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.32 no.8
    • /
    • pp.668-677
    • /
    • 2008
  • In nuclear power plants, ferritic low alloy steel nozzle was connected with austenitic stainless steel piping system through alloy 82/182 butt weld. Accurate estimation of residual stress for weldment is important in the sense that alloy 82/182 is susceptible to stress corrosion cracking. There are many results which predict residual stress distribution for alloy 82/182 weld between nozzle and pipe. However, nozzle and piping system usually connected through safe end which has short length. In this paper, residual stress distribution for pressurizer nozzle of Kori nuclear power plant was predicted using FE analysis, which consideded safe end. As a result, existing residual stress profile was redistributed and residual stress of inner surface was decreased specially. It means that safe end should be considered to reduce conservatism when estimating the piping system.

Deployment of Radioactive Waste Disposal Facility with the Introduction of Nuclear Power Plants (NPP) in Kenya

  • Shadrack, A.;Kim, C.L.
    • Journal of Nuclear Fuel Cycle and Waste Technology
    • /
    • v.1 no.1
    • /
    • pp.37-47
    • /
    • 2013
  • This paper describes basic plans for the development of a radioactive waste disposal facility with the introduction of Nuclear Power Plants (NPPs) for Kenya. The specific objective of this study was to estimate the total projected waste volumes of low- and intermediate-level radioactive waste (LILW) expected to be generated from the Kenyan nuclear power programme. The facility is expected to accommodate LILW to be generated from operation and decommissioning of nuclear power plants for a period of 50 years. An on-site storage capacity of 700 $m^3$ at nuclear power plant sites and a final disposal repository facility of more than 7,000 $m^3$ capacity were derived by considering Korean nuclear power programme radioactive waste generation data, including Kori, Hanbit, and APR 1400 nuclear reactor data. The repository program is best suited to be introduced roughly 10 years after reactor operation. This study is important as an initial implementation of a national LILW disposal program for Kenya and other newcomer countries interested in nuclear power technology.

Integrity evaluation of Kori 1 reactor vessel for Rancho Seco transient (Rancho Seco Transient에 대한 고리 1호기 원자로용기의 건전성 평가)

  • Jhung, M.J;Park, Y.W;Lee, J.B
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.21 no.7
    • /
    • pp.1089-1096
    • /
    • 1997
  • In this paper, Rancho Seco transient which is reported as a typical pressurized thermal shock event is postulated to be occuring in the Kori unit 1 plant, the oldest nuclear power plant in Korea. For the given material properties, transient history such as temperature and pressure, and postulated flaw, the stress distribution is obtained to calculate stress intensities for a wide range of assumed crack sizes. The stress intensities are compared with the fracture toughness, which is determined using the material properties and the distribution of the nil ductility transition temperature, to determine if cracking is expected to occur during the transient. The allowable operating year for the transient is determined and the evaluation results are discussed.

Analyses of SGTR Accident With Mihama Unit Experience (미하마 원전경험에 대한 SGTR 사고해석)

  • Lee, S.H.;Kim, K.;Kim, H.J.;Eun, Y.S.
    • Nuclear Engineering and Technology
    • /
    • v.26 no.1
    • /
    • pp.41-53
    • /
    • 1994
  • A SGTR accident postulated at Kori unit 1 is simulated with Mihama unit experience, which occurred on February 1991, to evaluate the capability of plant to cope with the transient. The system design and plant conditions of Kori Unit 1 are much similar with those of Mihama Unit 2. Therefore, special concern has been given to evaluate the sequence and the resulting consequence of the postulated SGTR accident at the Kori unit 1 An analysis is peformed as realistically as possible, with following the EOP of Kori unit 1. The result indicates that the leak through tube break terminates within about forty minutes, and the Kori unit 1 may be sufficient to cope with SGTR accident with same type of sequence. However, the reconsideration may be required for the design of Kori unit 1 which disconnects non-safety AC power from off-site power on SI signal generation. It may be pointed out that the content of EOP for SGTR accident is not enough to require operator's proper judgements. An analysis of SGTR accident tested in the LSTF which simulated the SGTR accident at the Mihama Unit 2 is peformed using the RELAP5/MOD3. The results indicates that the code yields in general good agreement with the test, except the break flowrate at the early stage of the event.

  • PDF

Perception Survey of Nuclear Power after the Nuclear Plant and Thyroid Cancer Controversy (원자력발전소와 갑상선암 논란 이후 원자력에 대한 인식 조사)

  • Lee, Jae-Heon;Park, Eun-tae
    • Journal of the Korean Society of Radiology
    • /
    • v.11 no.1
    • /
    • pp.19-25
    • /
    • 2017
  • In this study, in order to analyze the general awareness of the nuclear power according to the controversy of thyroid cancer around nuclear plant, we investigated risks, preference and economics regarding type of power, and awareness of pre-post nucl ear power targeting the Busan Metropolitan residents. As a result, there has been a change in people's awareness of nuclear power as a result of the controversy thyroid cancer around nuclear plant. Especially, there was the greatest increase in the risk factors compared to before the event(p<0.05). Negative awareness of nuclear risk was shown to be expressed differently accor ding to the difference between groups. It is thought that this is due to the different prior experience of each individuals or obtained information through the interaction with others rather than on scientific and objective grounds. In order to establish a nuclear power policy considering the level of the people in the future, it seems that the efforts to understand the attitudes and opinions of people about nuclear power and above all, a scientific trust in nuclear power should be guaranteed.

Radiation Exposure from Nuclear Power Plants in Korea: 2011-2015

  • Lim, Young Khi
    • Journal of Radiation Protection and Research
    • /
    • v.42 no.4
    • /
    • pp.222-228
    • /
    • 2017
  • Background: On June 18, 2017, Korea's first commercial nuclear reactor, the Kori Nuclear Power Plant No. 1, was permanently suspended, and the capacity of nuclear power generation facilities will be adjusted according to the governments denuclearization policy. In these circumstances, it is necessary to assess the quality of radiation safety management in nuclear power plants in Korea by evaluating the radiation dose associated with them. Materials and Methods: The average annual radiation dose per unit, the annual radiation dose per person, and the annual dose distribution were analyzed using the radiation dose database of nuclear reactors for the last 5 years. The results of our analysis were compared to the specifications of the Nuclear Safety Act and Medical Law in Korea. Results and Discussion: The annual average per unit radiation dose of global major nuclear power generation was 720 man-mSv, while that of Korea's nuclear power plants was 374 manmSv. No workers exceeded 50 mSv per year or 100 mSv in 5 years. The individual radiation dose according to occupational exposure was 0.59 mSv for nuclear workers, 1.77 mSv for non-destructive workers, and 0.8 mSv for diagnostic radiologists. Conclusion: The radiation safety management of nuclear power plants in Korea has achieved the best outcomes worldwide, which is considered to be the result of the as-low-as-reasonably-achievable (ALARA) approach and strict radiation safety management. Moreover, the occupational exposures were also very low.

The development of DCS simulator for the make-up demin-water treatment system of Kori #3&4 (고리 제2발전소 순수생산설비 DCS 시뮬레이터 개발)

  • 김태우;서인용;이용관
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2003.11a
    • /
    • pp.159-164
    • /
    • 2003
  • DCS (Distributed Control System) is adapted in the most fossil power plant in our country but that is not true in the nuclear power plant (NPP) because of the safety problem. KEPRI has developed many simulators for the training of the operators working in power plants. With this accumulated high technology we are developing a DCS simulator for the performance verification of the developed DCS for the make-up demin-water treatment system of Kori #3&4. In this paper we explain how we develop the system model and show a simulation result.

  • PDF

INSTORE : A PC-Based Database Program for Occupational Radiation Exposure of a Nuclear Power Plant

  • Cho, Yeong-Ho;Kang, Chang-Sun;Mun, Ju-Hyung;Kim, Hak-Su
    • Nuclear Engineering and Technology
    • /
    • v.30 no.4
    • /
    • pp.308-317
    • /
    • 1998
  • Ensuring occupational radiation exposure(ORE) as low as is reasonably achievable(ALARA) has been one of very important requirements in a nuclear power plant. It is well known that about 70 percent of occupational dose has incurred from maintenance jobs in the outage period. To reduce occupational dose effectively, the high-dose jobs in the outage period should be identified with their dose reduction potentials and methods. In this study, a PC-based ORE database program, INSTORE, is developed to evaluate ORE doses in individual jobs, and the ORE data of Kori Units 3 and 4 are assembled to the database. Based on customary job classification, radiation work is classified into 26 main jobs which comprise 61 detailed jobs, and occupational doses are assessed according to each detailed job. As a result, high-dose jobs are identified with dose reduction priority in terms of collective ORE dose. It is recommended that adeqaute dose reduction methods for these jobs should be prepared to improve their working conditions and procedures.

  • PDF

Plan of BIM-based Quantity Take-off for Nuclear Power Plant Decommissioning (BIM을 활용한 원전 해체 물량산출 방안)

  • Jung, In-Su;Won, Ji-Sun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.6297-6304
    • /
    • 2015
  • Nuclear power plant decommissioning has attracted attention according to the shutdown decision of Kori 1 which is Korea's first nuclear power plant. Nuclear power plant decommissioning is the one who never experienced ever in our country. So, its process is difficult and time-consuming. In addition, it is difficult to determine the decommissioning quantity. This study proposed the plan that can be used in quantity take-off for nuclear power plant decommissioning using BIM technology being utilized in recent construction industry. As a result, we suggested the method of BIM-based quantity take-off such as the selection decommissioning method and process, setting up of BIM modeling environment, establishment of OBS & WBS, integrated BIM modeling, the definition of quantity property. The proposed plan can be utilized usefully from when permanent stopping nuclear power plant occurs intensively. Furthermore, the overseas nuclear power plant decommissioning project order also are expected through technology securement based on this plan.

Comparison between ISO 9000 Specification and Nuclear Quality Assurance Specification and Expected Application Effect (ISO 9000규격과 원자력품질보증 규격과의 비교 및 예상 적용 효과)

  • Lee, Tae-Hoon;Ha, Ji-Hoon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.79-89
    • /
    • 2011
  • Since commercial operation of Kori-1 nuclear power plant in 1978, twenty units are under operation and six units are under construction at 2011 present. Nuclear power become a main energy source in our country. However, the plant was constructed by a USA vendor in its beginning period, the Quality Assurance requirements of USA was applied. Even though Quality Assurance requirements were newly established to the Korea Atomic Energy Act, its contents are quite similar to those of USA. And 10 CFR 50 App.B, ASME NQA-1 apply to most of nuclear industries as a quality assurance plan. In this paper, Quality Assurance requirement of domestic nuclear industries has been investigated and applicable method of ISO Quality Assurance application to the nuclear industries is suggested by a comparison ISO 9000 and nuclear quality assurance specification.