• 제목/요약/키워드: Korea power system

검색결과 12,463건 처리시간 0.032초

Field Implementation of Voltage Management System (VMS) into Jeju Power System in Korea

  • Shin, Jeonghoon;Nam, Suchul;Song, Jiyoung;Lee, Jaegul;Han, Sangwook;Ko, Baekkyung;An, Yongho;Kim, Taekyun;Lee, Byungjun;Baek, Seungmook
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권3호
    • /
    • pp.719-728
    • /
    • 2015
  • This paper presents the results of field tests on Voltage Management System (VMS) using hybrid voltage control, which utilizes coordinated controls of various reactive power resources such as generators, FACTS and switched shunt devices to regulate the pilot bus voltage in a voltage control area. It also includes the results of performance test on RTDS-based test bed in order to validate the VMS before installing it in Jeju power system. The main purpose of the system is adequately to regulate the reactive power reserve of key generators in a normal condition with coordination of discrete shunt devices such as condensers and reactors so that the reserves can avoid voltage collapse in emergency state in Jeju system. Field tests in the automatic mode of VMS operation are included in steady-states and transient states. Finally, by the successful operation of VMS in Jeju power system, the VMS is proved to effectively control system voltage profiles in steady-state condition, increase system MVAR reserves and improve system reliability for pre- and post-contingency.

전력수급계획 및 운용해석 종합시스템 개발 (Development of the Integrated System for Power System Operational Planning an)

  • 박시우;윤용범;남재현;안양근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.1042-1045
    • /
    • 1998
  • The main purpose of HITES(Highly Integrate Total Energy System) is to build and develop an integrated energy system for power system operational planning and analysis which consists of load forecast, economic generation schedule, stability analysis and relational database system. The integrated energy system can be utilized to supply a stable electric power and operate KEPCO power system facilities economically. This system will be put into operation in 1999. This paper describes the main feature of the HITES, system main functions, numerical methods adopted this system, and network configuration.

  • PDF

전원부하분석을 통한 무인항공기 전기시스템 설계 및 검증 (Design and Verification of Electrical System for Unmanned Aerial Vehicle through Electrical Load Power Analysis)

  • 우희채
    • 한국군사과학기술학회지
    • /
    • 제21권5호
    • /
    • pp.675-683
    • /
    • 2018
  • In this paper, we have proposed a design and verification methods of electrical system and power loads for unmaned aeriel vehicles(UAVs) through electrical load analysis. In order to meet a UAV system requirement and electrical system specifications, we have designed an electrical power system for efficient power supply and distribution and have theoretically analyzed the power loads according to the power consumption and power bus design of UAV. Using electrical system rig, the designed electrical power system has been experimentally verified. Also, we have performed several flight tests to verify the UAV electrical system and power loads. It is concluded that the proposed design and verification method of electrical system for UAV system.

A BIFUNCTIONAL UTILITY CONNECTED PHOTOVOLTAIC SYSTEM WITH POWER FACTOR CORRECTION AND U.P.S. FACILITY

  • Kim. S.;Yoo, Gwonjong;Song, Jinsoo
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 1996년도 창립기념 전력전자학술발표회 논문집
    • /
    • pp.103-108
    • /
    • 1996
  • In this paper, a novel utility connected photovoltaic power generation system with unity power factor and uninterruptable power system facility and its control strategy are proposed. The proposed photovoltaic(PV) system is connected in parallel between utility and load. The PV system provides an uninterruptable voltage to load, a maximum power tracking to solar array, and power factor correction to the utility. The proposed system has the following advantages compared with the conventional utility connected PV system. 1. Harmonic elimination Function 2. Feeding the photovoltaic energy to the utility 3. Providing the uninterruptible power source along battery to the load In case that the photovoltaic array system is on the poor power generation, the battery and capacitor of the PV system are charged by three phase utility source and the inverter in the PV system only provides the reactive current to eliminate the harmonic current exited on the utility. In the normal operation mode, the PV system supplies active power to load and reactive power to utility in order to maintain the unity power factor and to regulate ac load voltage.

  • PDF

4MW 에너지저장장치의 전력계통 주파수 조정 운전제어를 위한 실증 (Demonstration to Operate and Control Frequency Regulation of Power System by 4MW Energy Storage System)

  • 임건표;한현규;장병훈;양승권;윤용범
    • 전기학회논문지P
    • /
    • 제63권3호
    • /
    • pp.169-177
    • /
    • 2014
  • Operation and control system has been installed and tested to use energy storage system(ESS) for frequency regulation at 4MW class of ESS demonstration facility installed at Jeju island, Korea in 2013. Simulation tests were performed by programing language C# for power system of Jeju island to develop control algorithm. Site simulation tests were performed in control system itself without connecting power system and energy storage system. Control algorithm was coded, modified and tested to load to controller and communication system and human-machine interface were developed and tested in the process of simulation tests. After similar results to that of simulation tests by programing language were obtained, power system and energy storage system demonstration facility were connected to control system by communication system. Energy storage system for frequency regulation was tested for actual frequency and simulation frequency. The site tests showed the similar results to that of simulation tests and the control systems is possible to be operated for frequency regulation. Faster response of energy storage system for frequency regulation, less costs and less capacity of energy storage systems which cover for frequency regulation of power plants. It is expected that more studies for time-reduction and time-delay elements can make less capacity of energy storage system cover more role of frequency regulation of power plants.

전력계통 관점에서의 초전도 전력기기 적응효과와 기술상의 과제 (The Technology Impact & Problems of Superconductivity Applied Components on Future Power System in Korea)

  • 홍원표;서정윤;박중신
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1991년도 하계학술대회 논문집
    • /
    • pp.386-392
    • /
    • 1991
  • If we rely only on the conventional technology, It may be difficult to meet the recent requirments to electric power system such as further improvement of the quality of electric power supply, technology problems environmental compatibility and so on. Nowadays, power engineers much interest in applying new technology to power system industry. It is confirmed the technology of superconductivity applied components plays an important role in solving the problems of power system, because superconductors, used in suitable applications, can make electric power equipment smaller, lighter, more efficient and perhaps with better dynamic response. Two specific applications are considered here : electric machinery (Generators, Superconducting Magnetic Energy Storage, Transformer, Current limitter) and transmission line. The paper addresses the limitation of conventional technology, the technology impact & problems of superconductivity applied components to future power system from qualitative and some quantitative viewponts. The paper close with questions posed to simulate thinking on how superonductivity might be applied to power systems on a holistic basis.

  • PDF

루프화 배전계통에 초전도 한류기 적용에 따른 Recloser-Fuse 보호협조 분석 (Analysis on Recloser-Fuse Coordination in Loop Power Distribution System with Superconducting Fault Current Limiters)

  • 최규완;김수환;문종필
    • 전기학회논문지P
    • /
    • 제64권3호
    • /
    • pp.111-115
    • /
    • 2015
  • Recently, protection coordination issues can occur due to increased fault current in power system when power system being changed radial power system to grid system such as loop power system, micro grid and smart grid. This paper analyzed Recloser-Fuse coordination in loop power distribution system with Superconducting Fault Current Limiters(SFCLs) when single line ground fault occur in loop power distribution system with SFCLs. We analyzed Recloser-Fuse Coordination in radial power distribution system and changed coordination caused by increased Fault current because of loop system when single line ground fault occur in power distribution system. This paper simulated to improve changed coordination using SFCLs in loop power distribution system. Power distribution system, SFCLs and protective devices are modeled using PSCAD/EMTDC.

765kV 변전소 시운전에 관한 고찰 (Consideration on the trial operation of 765kV substation)

  • 변강;정시환;박근원;이상면;최만식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.29-31
    • /
    • 2002
  • Purpose of the 765kV trial operation conducted for the first time in our country are performance verification of domestic developed equipment(765kV M.Tr, GIS,etc) and extraction of problem in advance to commercial operation and cultivation of operation ability. The trial operation of 765kV substation was finished successfully under the positive supports of institutes. manufactures. and constructers. It is expected that extraction of problems in advance and accumulation of operation techniques through the trial operation of 765kV substation will be contributed largly to the realization of the without a hitch operation of 765kV system.

  • PDF

전력용 LAN 지원 다기능 광 전송장치 개발 (Multi-Service Optical Transmission Equipment with LAN Interface for Electrical Power System)

  • 김재성;민남기;이성재
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 D
    • /
    • pp.1901-1902
    • /
    • 2006
  • In recent years, it has been a worldwide trend that many power utilities gave their attention to develop and operate their power plants, substation and distribution systems. Following this trend, KEPCO(Korea Electric Power Corporation) has developed many electric automation systems with various communication networks. It has been natural that the automation systems are just focused on to remote devices when they come to be designed. But, we have to shift the focus to the automation system itself. We have developed the Multi-service Optical Transmission System (M-OTS) for electrical power systems. It can be adopt to not only distribution power field but also the transmission power field. The result strongly shows that the system is potentially beneficial in reliability, speed, and expandability. This paper presents some of initial design efforts and results toward a KEPCO's communication system in distribution areas.

  • PDF