• Title/Summary/Keyword: Korea National Railroad

Search Result 672, Processing Time 0.02 seconds

A Study on Development of Prototype Test Train Design in G7 Project for High Speed Railway Technology (G7 고속전철기술개발사업에서의 시제차량 통합 디자인 개발)

  • 정경렬;이병종;윤세균
    • Archives of design research
    • /
    • v.16 no.4
    • /
    • pp.185-196
    • /
    • 2003
  • The demand for an environment-friendly transportation system, equipped with low energy consumption, and low-or zero-pollution has been on the increase since the beginning of the World Trade Organization era. Simultaneously, the consistent growth of high-speed tram technology, combined with market share, has sparked a fierce competition among technologically-advanced countries like France, Germany, and Japan in an effort to keep the lead in high-speed train technology via extensive Research and development(R&D) expenses. These countries are leaders in the race to implement the next-generation transportation system, build intercontinental rail way networks and export the high-speed train as a major industry commodity. The need to develop our own(Korean) 'high-speed train' technology and its core system technology layouts including original technology serves a few objectives: They boost the national competitive edge; they develop an environmental friendly rail road system that can cope with globalization and minimize the social and economic losses created by the growing traffic-congested delivery costs, environment pollution, and public discomforts. In turn, the 'G7 Project-Development of High Speed Railway Technology' held between 1996 and 2002 for a six-year period was focused on designing a domestic train capable of traveling at a speed of 350km/h combined and led to the actual implementation of engineering and producing the '2000 high-speed train:' This paper summarizes and introduces one of the G7 Projects-specifically, the design segment achievement within the development of train system engineering technology. It is true that the design aspect of the Korean domestic railway system program as a whole was lacking when compared with the advanced railroad countries whose early phase of train design emphasized the design aspect. However, having allowed the active participation of expert designers in the early phase of train design in the current project has led to a new era of domestic train development and the implementation of a way to meet demand flexibly with newly designed trains. The idea of a high-speed train in Korea and its design concept is well-conceived: a faster, more pleasant, and silent based Korean high-speed train that facilitates a new travel culture. A Korean-type of high-speed train is acknowledged by passengers who travel in such trains. The Korean high-speed prototype train has been born, combining aerodynamic air-cushioned design, which is the embodiment of Korean original design of forehead of power car minimized aerodynamic resistance using a curved car body profile, and the improvement of the interior design with ergonomics and the accommodation of the vestibule area through the study of passenger behavior and social culture that is based on the general passenger car.

  • PDF

An Analysis of the Uncertainty Factors for the Life Cycle Cost of Light Railroad Transit (경량전철 교량 LCC분석을 위한 불확실성 인자 분석)

  • Won, Seo-Kyung;Lee, Du-Heon;Kim, Kyoon-Tai;Kim, Hyun-Bae;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.396-400
    • /
    • 2007
  • Various ways of automated guideway transit construction are being planned recently owing to the policies of the national government and local municipalities as well as increasing investment from the private sector. Particularly, the increase in the private investment is increasing greatly in SOC (Social Overhead Cost). This trend of promoting private sector investment must be conducted on the basis of a thorough analysis of the economic feasibility of the project from the government and construction companies in the private sector. In other words, an accurate cost analysis of initial investment cost (Construction cost), maintenance/repair cost, profit making through the operation of the concerned facilities, cost of dissolution, etc. in terms of the life cycle is very much in need. Nevertheless, the analysis of uncertainty factors and its probabilistic theory are in need of development so that they can be used in the analysis of the economic feasibility of a construction project. First of all, the actual studies on maintenance/repair cost of automated guideway transit are scarce as of yet, prohibiting an accurate computation of the cost and its economic analysis. Accordingly, this study focused on the uncertainty analysis of the economic feasibility for civil engineering structures among automated guideway transit construction projects based on the rapidly increasing investment on such structures from the private sector. For this research purpose, a cost classification system for the automated guideway transit is proposed, first of all, and the data On the cost cycle of the civil structure facilities and their unit cost are collected and analyzed. Then, the uncertainty in the cost is analyzed from the perspective of LCC. In consideration of the current status with almost no. studies on maintenance/repair of such facilities, it is expected that the cost classification system and the uncertainty analysis technique proposed in this study will greatly enhance LCC analysis and economic feasibility studies for automated guideway transit projects in the future.

  • PDF